메뉴 건너뛰기




Volumn , Issue , 2011, Pages 818-825

Time, cost, and environmental impact analysis on construction operations

Author keywords

Construction management; Costs; Environmental issues; Time factors

Indexed keywords

CONSTRUCTION MANAGEMENT; CONSTRUCTION OPERATIONS; CONSTRUCTION PHASE; CONSTRUCTION PROFESSIONALS; CONSTRUCTION PROJECTS; ENVIRONMENT IMPACT; ENVIRONMENTAL IMPACT ANALYSIS; ENVIRONMENTAL ISSUES; GLOBAL WARMING POTENTIAL; LIFE-CYCLE ASSESSMENTS; MULTI OBJECTIVE; OPTIMAL CONSTRUCTION; OPTIMAL SOLUTIONS; PERFORMANCE CRITERION; PROJECT PERFORMANCE; TIME FACTORS;

EID: 80053154061     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41182(416)101     Document Type: Conference Paper
Times cited : (2)

References (11)
  • 2
    • 84992969642 scopus 로고    scopus 로고
    • A knowledge-driven management approach to environmental-conscious construction
    • Chen, Z., Li, H., Kong, S. C., & Xu, Q. (2005). A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5, 27-39.
    • (2005) Construction Innovation , vol.5 , pp. 27-39
    • Chen, Z.1    Li, H.2    Kong, S.C.3    Xu, Q.4
  • 4
    • 84992944192 scopus 로고    scopus 로고
    • Improving the performance of earned value analysis as a construction project management tool
    • Howes, R. (2000). Improving the performance of earned value analysis as a construction project management tool. Journal of Engineering, Construction and Architectural Management, 7 (4), 399-411.
    • (2000) Journal of Engineering, Construction and Architectural Management , vol.7 , Issue.4 , pp. 399-411
    • Howes, R.1
  • 5
    • 78650464247 scopus 로고    scopus 로고
    • A multi-stage approach to time-cost trade-off analysis using mathematical programming
    • Jiang, A., & Zhu, Y. (2010). A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management.
    • (2010) International Journal of Construction Management
    • Jiang, A.1    Zhu, Y.2
  • 6
    • 80053155872 scopus 로고    scopus 로고
    • An LCA-based environmental impact assessment for construction processes
    • accepted for publication
    • Li, X., Zhu, Y., & Zhang, Z. (2009). An LCA-based environmental impact assessment for construction processes. Building and Environment, accepted for publication.
    • (2009) Building and Environment
    • Li, X.1    Zhu, Y.2    Zhang, Z.3
  • 8
    • 78650636006 scopus 로고    scopus 로고
    • A framework to minimize total energy consumption and total tardiness on a single machine
    • Mouzon, G., & Yildirim, M. B. (2008). A Framework to minimize total energy consumption and total tardiness on a single machine. International Journal of Sustainable Engineering, 1 (2), 105-116.
    • (2008) International Journal of Sustainable Engineering , vol.1 , Issue.2 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 10
    • 13244251278 scopus 로고    scopus 로고
    • A computer-based scoring method for measuring the environmental performance of construction activities
    • Shen, L., Lu, W., Yao, H., & Wu, D. (2005). A computer-based scoring method for measuring the environmental performance of construction activities. Automation in Construction, 14, 297-309.
    • (2005) Automation in Construction , vol.14 , pp. 297-309
    • Shen, L.1    Lu, W.2    Yao, H.3    Wu, D.4
  • 11
    • 33644786862 scopus 로고    scopus 로고
    • Applying computer-based simulation to energy auditing: A case study
    • Zhu, Y. (2006). Applying computer-based simulation to energy auditing: a case study. Energy and Buildings, 38, 421-428.
    • (2006) Energy and Buildings , vol.38 , pp. 421-428
    • Zhu, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.