메뉴 건너뛰기




Volumn 31, Issue 25, 2011, Pages 1-9

Wind power credible capacity evaluation model based on sequence operation

Author keywords

Power system production simulation; Reliability; Sequence operation theory; Wind power; Wind power capacity credit; Wind power credible capacity

Indexed keywords

MONTE CARLO METHODS; POWER TRANSMISSION; RELIABILITY; STOCHASTIC MODELS;

EID: 80053128999     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (48)

References (22)
  • 1
    • 69749084631 scopus 로고    scopus 로고
    • Prospects of low-carbon electricity
    • in Chinese
    • Kang Chongqing, Chen Qixin, Xia Qing. Prospects of low-carbon electricity [J]. Power System Technology, 2009, 33 (2): 1-7 (in Chinese).
    • (2009) Power System Technology , vol.33 , Issue.2 , pp. 1-7
    • Kang, C.1    Chen, Q.2    Xia, Q.3
  • 2
    • 80053129427 scopus 로고    scopus 로고
    • Gains in global wind capacity reported
    • 2010-05-12
    • Kroldrup L. Gains in global wind capacity reported [EB/OL]. [2010-05-12]. http://green.blogs.nytimes.com /2010/02/15/gains-in-global-wind-capacity-reported/.
    • Kroldrup, L.1
  • 3
    • 6344253760 scopus 로고    scopus 로고
    • Analysys of wind power value to power system operation
    • in Chinese
    • Lei Yazhou, Wang Weisheng, Yin Yonghua. Analysys of wind power value to power system operation [J]. Power System Technology, 2002, 26 (5): 10-14 (in Chinese).
    • (2002) Power System Technology , vol.26 , Issue.5 , pp. 10-14
    • Lei, Y.1    Wang, W.2    Yin, Y.3
  • 4
    • 78651539562 scopus 로고    scopus 로고
    • Participation mode of large-scale Jiuquan wind power farm in Gansu province to electricity market and its utilization scheme
    • in Chinese
    • Xu Wei, Yang Yulin, Li Zhengguang, et al. Participation mode of large-scale Jiuquan wind power farm in Gansu province to electricity market and its utilization scheme [J]. Power System Technology, 2010, 34 (6): 71-77 (in Chinese).
    • (2010) Power System Technology , vol.34 , Issue.6 , pp. 71-77
    • Xu, W.1    Yang, Y.2    Li, Z.3
  • 5
    • 78149290666 scopus 로고    scopus 로고
    • Impact of large-scale wind farm connecting with power grid on peak load regulation demand
    • in Chinese
    • Zhang Ning, Zhou Tianrui, Duan Changgang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand [J]. Power System Technology, 2010, 34 (1): 152-158 (in Chinese).
    • (2010) Power System Technology , vol.34 , Issue.1 , pp. 152-158
    • Zhang, N.1    Zhou, T.2    Duan, C.3
  • 7
    • 0033207626 scopus 로고    scopus 로고
    • Capacity credit and avoided cost of wind power plants
    • in Chinese
    • Chen Shuyong, Dai Huizhu, Bai Xiaomin, et al. Capacity credit and avoided cost of wind power plants [J]. Acta Energiae Solaris Sinica, 1999, 20 (4): 432-438 (in Chinese).
    • (1999) Acta Energiae Solaris Sinica , vol.20 , Issue.4 , pp. 432-438
    • Chen, S.1    Dai, H.2    Bai, X.3
  • 8
    • 21444440115 scopus 로고    scopus 로고
    • Research on the capacity credit of wind energy resources
    • in Chinese
    • Wang Haichao, Lu Zongxiang, Zhou Shuangxi. Research on the capacity credit of wind energy resources [J]. Proceedings of the CSEE, 2005, 25 (10): 103-106 (in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.10 , pp. 103-106
    • Wang, H.1    Lu, Z.2    Zhou, S.3
  • 9
    • 36348957426 scopus 로고    scopus 로고
    • Impact of the wind geographical correlation level for reliability studies
    • Vallée F, Lobry J, Deblecker O. Impact of the wind geographical correlation level for reliability studies [J]. IEEE Transactions on Power Systems, 2007, 22 (4): 2232-2239.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 2232-2239
    • Vallée, F.1    Lobry, J.2    Deblecker, O.3
  • 10
    • 49249106987 scopus 로고    scopus 로고
    • System reliability assessment method for wind power integration
    • Vallée F, Lobry J, Deblecker O. System reliability assessment method for wind power integration [J]. IEEE Transactions on Power Systems, 2008, 23 (3): 1288-1297.
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.3 , pp. 1288-1297
    • Vallée, F.1    Lobry, J.2    Deblecker, O.3
  • 11
    • 70049107322 scopus 로고    scopus 로고
    • A reliability model of large wind farms for power system adequacy studies
    • Dobakhshari A S, Fotuhi-Firuzabad M. A reliability model of large wind farms for power system adequacy studies [J]. IEEE Transactions on Energy Conversion, 2009, 24 (3): 792-801.
    • (2009) IEEE Transactions on Energy Conversion , vol.24 , Issue.3 , pp. 792-801
    • Dobakhshari, A.S.1    Fotuhi-Firuzabad, M.2
  • 12
    • 79951999240 scopus 로고    scopus 로고
    • The impact of large scale wind farm integration in nordic countries
    • Espoo, Finland: Helsinki University
    • Hannele H. The impact of large scale wind farm integration in nordic countries [D]. Espoo, Finland: Helsinki University, 2004.
    • (2004)
    • Hannele, H.1
  • 13
    • 24644512228 scopus 로고    scopus 로고
    • An analytical formula for the capacity credit of wind power
    • Kris R V, William D D. An analytical formula for the capacity credit of wind power [J]. Renewable Energy, 2006 (31): 45-54.
    • (2006) Renewable Energy , Issue.31 , pp. 45-54
    • Kris, R.V.1    William, D.D.2
  • 14
  • 16
    • 0036837710 scopus 로고    scopus 로고
    • Sequence operation theory and its application in power system reliability evaluation
    • Kang Chongqing, Xia Qing, Xiang Niande. Sequence operation theory and its application in power system reliability evaluation [J]. Reliability Engineering and System Safety, 2002, 78 (2): 101-109.
    • (2002) Reliability Engineering and System Safety , vol.78 , Issue.2 , pp. 101-109
    • Kang, C.1    Xia, Q.2    Xiang, N.3
  • 17
    • 0036558974 scopus 로고    scopus 로고
    • Analysis on the uncertainty of electricity price
    • in Chinese
    • Bai Lichao, Kang Chongqing, Xia Qing, et al. Analysis on the uncertainty of electricity price [J]. Proceedings of the CSEE, 2002, 22 (5): 36-41 (in Chinese).
    • (2002) Proceedings of the CSEE , vol.22 , Issue.5 , pp. 36-41
    • Bai, L.1    Kang, C.2    Xia, Q.3
  • 18
    • 59949093885 scopus 로고    scopus 로고
    • Electricity purchasing cost calculation based on uncertain analysis of power supply-demand balancing for power grid corporation
    • in Chinese
    • Xu Wei, Kang Chongqing, Chuai Xiaoyong, et al. Electricity purchasing cost calculation based on uncertain analysis of power supply-demand balancing for power grid corporation [J]. Power System Technology, 2006, 30 (21): 15-20 (in Chinese).
    • (2006) Power System Technology , vol.30 , Issue.21 , pp. 15-20
    • Xu, W.1    Kang, C.2    Chuai, X.3
  • 19
    • 79951988750 scopus 로고    scopus 로고
    • Simulation methodology of multiple wind farms operation considering wind speed correlation
    • Zhang Ning, Kang Chongqing, Duan Changgang, et al. Simulation methodology of multiple wind farms operation considering wind speed correlation [J]. International Journal of Power and Energy Systems, 2010, 30 (4): 264-173.
    • (2010) International Journal of Power and Energy Systems , vol.30 , Issue.4 , pp. 264-173
    • Zhang, N.1    Kang, C.2    Duan, C.3
  • 20
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • Probabilistic Methods Subcommittee
    • Probabilistic Methods Subcommittee. IEEE reliability test system [J]. IEEE Transactions on Power Apparatus and Systems, 1979, 98 (6): 2047-2054.
    • (1979) IEEE Transactions on Power Apparatus and Systems , vol.98 , Issue.6 , pp. 2047-2054
  • 21
    • 79951988750 scopus 로고    scopus 로고
    • Simulation methodology of multiple wind farms operation considering wind speed correlation
    • Zhang Ning, Kang Chongqing, Duan Changgang, et al. Simulation methodology of multiple wind farms operation considering wind speed correlation [J]. International Journal of Power and Energy Systems, 2010, 30 (4): 264-273.
    • (2010) International Journal of Power and Energy Systems , vol.30 , Issue.4 , pp. 264-273
    • Zhang, N.1    Kang, C.2    Duan, C.3
  • 22
    • 80053107287 scopus 로고    scopus 로고
    • Power generation planning optimization of Jiangsu province
    • Jiangsu Electric Power Company, Nanjing: Jiangsu Electric Power Company
    • Jiangsu Electric Power Company. Power generation planning optimization of Jiangsu province [R]. Nanjing: Jiangsu Electric Power Company, 2010.
    • (2010)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.