-
1
-
-
0015281960
-
Power system simulation model based on probability analysis
-
Booth R.R. Power system simulation model based on probability analysis. IEEE Trans Power Appar Syst. PAS091:1972;62-69.
-
(1972)
IEEE Trans Power Appar Syst
, vol.PAS091
, pp. 62-69
-
-
Booth, R.R.1
-
2
-
-
0015401382
-
A new generation production cost program to recognize forced outages
-
October
-
Wood A.J., Ringlee R.J., Sager M.A. A new generation production cost program to recognize forced outages. IEEE Trans Power Appar Syst. PAS-91:October 1972;2114-2124.
-
(1972)
IEEE Trans Power Appar Syst
, vol.PAS-91
, pp. 2114-2124
-
-
Wood, A.J.1
Ringlee, R.J.2
Sager, M.A.3
-
6
-
-
0024767252
-
Comparison of probabilistic production cost simulation methods
-
November
-
Lin M.Y., Breipohl A.M., Lee F.N. Comparison of probabilistic production cost simulation methods. IEEE Trans Power Syst. 4:(4):November 1989;1326-1334.
-
(1989)
IEEE Trans Power Syst
, vol.4
, Issue.4
, pp. 1326-1334
-
-
Lin, M.Y.1
Breipohl, A.M.2
Lee, F.N.3
-
7
-
-
0024054210
-
Equivalent energy function approach to power system probabilistic modeling
-
August
-
Xifan W. Equivalent energy function approach to power system probabilistic modeling. IEEE Trans Power Syst. 3:(3):August 1988;823-829.
-
(1988)
IEEE Trans Power Syst
, vol.3
, Issue.3
, pp. 823-829
-
-
Xifan, W.1
-
8
-
-
0024612046
-
Improved algorithms for multi-area reliability evaluation using the decomposition approach
-
February
-
Singh C., Lago-Gonzalez A. Improved algorithms for multi-area reliability evaluation using the decomposition approach. IEEE Trans Power Syst. 4:(1):February 1989;321-328.
-
(1989)
IEEE Trans Power Syst
, vol.4
, Issue.1
, pp. 321-328
-
-
Singh, C.1
Lago-Gonzalez, A.2
-
9
-
-
0022104038
-
Two area production cost evaluation by the segmentation method
-
August
-
Ahsan Q., Schenk K.F. Two area production cost evaluation by the segmentation method. IEEE Trans Power Appar Syst. 104:(8):August 1985;2140-2147.
-
(1985)
IEEE Trans Power Appar Syst
, vol.104
, Issue.8
, pp. 2140-2147
-
-
Ahsan, Q.1
Schenk, K.F.2
-
10
-
-
0028369860
-
2 compliance planning using probabilistic production costing and generalized benders decomposition
-
February
-
2 compliance planning using probabilistic production costing and generalized benders decomposition. IEEE Trans Power Syst. 9:(1):February 1994;174-180.
-
(1994)
IEEE Trans Power Syst
, vol.9
, Issue.1
, pp. 174-180
-
-
Huang, W.X.1
Hobbs, B.F.2
-
11
-
-
0028548371
-
The use of probability techniques in value-based planning
-
Rau N.S. The use of probability techniques in value-based planning. IEEE Trans Power Syst. 9:(4):1994;2001-2013.
-
(1994)
IEEE Trans Power Syst
, vol.9
, Issue.4
, pp. 2001-2013
-
-
Rau, N.S.1
-
12
-
-
0030146467
-
Impacts of demand-side management on reliability cost/reliability worth analysis
-
Billinton R., Lakhanpai D. Impacts of demand-side management on reliability cost/reliability worth analysis. IEE Proc Gener Transm Distrib. 143:(3):1996;225-231.
-
(1996)
IEE Proc Gener Transm Distrib
, vol.143
, Issue.3
, pp. 225-231
-
-
Billinton, R.1
Lakhanpai, D.2
-
13
-
-
0018544097
-
-
IEEE Reliability Test System, June. A report prepared by the reliability test system task force of the application of probability methods subcommittee
-
IEEE Reliability Test System . IEEE Trans Power Appar Syst. 98:June 1979;2047-2054. A report prepared by the reliability test system task force of the application of probability methods subcommittee.
-
(1979)
IEEE Trans Power Appar Syst
, vol.98
, pp. 2047-2054
-
-
-
14
-
-
0022807554
-
The IEEE reliability test system - Extensions to and evaluation of the generating system
-
November
-
Allan R.N., Billinton R., Abdel-Gawad N.M.K. The IEEE reliability test system - extensions to and evaluation of the generating system. IEEE Trans Power Syst. 1:(4):November 1986;1-7.
-
(1986)
IEEE Trans Power Syst
, vol.1
, Issue.4
, pp. 1-7
-
-
Allan, R.N.1
Billinton, R.2
Abdel-Gawad, N.M.K.3
|