Volumn 39, Issue 17, 2011, Pages 149-154

Application review of life cycle cost (LCC) technology in power system

Author keywords

Application; Asset management; Life cycle cost(LCC); Power facility; Power network planning; Smart grid

Indexed keywords

DEVICE LAYERS; ELECTRIC POWER; ELECTRIC POWER FACILITIES; FLEXIBLE PLANNING; LIFE CYCLE COST(LCC); LIFECYCLE COSTS; LOAD UNCERTAINTY; MULTI OBJECTIVE; POWER NETWORKS; POWER SYSTEM ASSETS; RELIABILITY CENTERED MAINTENANCE; SMART GRID; SYSTEM LAYER;

EID: 80053084412     PISSN: 16743415     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Review
Times cited : (28)

References (31)
  • 2
    • 70350542712 scopus 로고    scopus 로고
    • Research on several key technical problems in realization of smart grid
    • SHI Jie, AI Qian. Research on several key technical problems in realization of smart grid[J]. Power System Protection and Control, 2009, 37(19): 1-4.
    • (2009) Power System Protection and Control , vol.37 , Issue.19 , pp. 1-4
    • Shi, J.1    Ai, Q.2
  • 3
    • 80052496367 scopus 로고    scopus 로고
    • Research on equipment life cycle cost and application
    • Nanjing: Nanjing University of Aeronautics and Astronautics
    • WANG Shu-peng. Research on equipment life cycle cost and application[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2007.
    • (2007)
    • Wang, S.-P.1
  • 4
    • 80053061734 scopus 로고    scopus 로고
    • Life cycle cost theory in construction project and the application research
    • Shanghai: Tongji University
    • GAO Jiao-yin. Life cycle cost theory in construction project and the application research[D]. Shanghai: Tongji University, 2008.
    • (2008)
    • Gao, J.-Y.1
  • 5
    • 0032046060 scopus 로고    scopus 로고
    • Product life cycle cost analysis: State of the art review
    • Asiedu Y. Product life cycle cost analysis: state of the art review[J]. International Journal of Production Research, 1998, 36(4): 883-908.
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 883-908
    • Asiedu, Y.1
  • 7
    • 1842772010 scopus 로고
    • A design and implementation model for life cycle cost management system
    • Ahmed N U. A design and implementation model for life cycle cost management system[J]. Information and Management, 1995, 28: 216-269.
    • (1995) Information and Management , vol.28 , pp. 216-269
    • Ahmed, N.U.1
  • 8
    • 0024479022 scopus 로고
    • STEP: A tool for estimating avionics life cycle costs
    • Curry E E. STEP: a tool for estimating avionics life cycle costs[J]. IEEE Aerospace and Electronic Systems Magazine, 1989, 4(1): 30-32.
    • (1989) IEEE Aerospace and Electronic Systems Magazine , vol.4 , Issue.1 , pp. 30-32
    • Curry, E.E.1
  • 9
    • 0030385615 scopus 로고    scopus 로고
    • Fundamental requirements of life cycle costing: Projecting life cycle costs for electronic system modernization
    • Nov. 4-6
    • Stephen Sanford Chafee. Fundamental requirements of life cycle costing: projecting life cycle costs for electronic system modernization[C]. // Northcon/96, Nov. 4-6, 1996: 41-46.
    • (1996) Northcon/96 , pp. 41-46
    • Chafee, S.S.1
  • 14
    • 0037862092 scopus 로고    scopus 로고
    • A life cycle engineering approach to development of flexible manufacturing systems
    • Yan Pingtao, Zhou Mengchu. A life cycle engineering approach to development of flexible manufacturing systems[J]. IEEE Transactions on Robotics and Automation, 2003, 19(3): 465-473.
    • (2003) IEEE Transactions on Robotics and Automation , vol.19 , Issue.3 , pp. 465-473
    • Yan, P.1    Zhou, M.2
  • 16
    • 80053075108 scopus 로고    scopus 로고
    • Analysis of LCC management in Shanghai electric power system
    • ZHANG Yi, TENG Le-tian, LING Ping. Analysis of LCC management in Shanghai electric power system[J]. Shanghai Electric Power, 2004, 3: 179-181.
    • (2004) Shanghai Electric Power , vol.3 , pp. 179-181
    • Zhang, Y.1    Teng, L.-T.2    Ling, P.3
  • 18
    • 33745600369 scopus 로고    scopus 로고
    • LCC analysis of different resonant circuits and solid-state circuit breakers for medium-voltage grids
    • Meyer Christoph, De Doncker R W. LCC analysis of different resonant circuits and solid-state circuit breakers for medium-voltage grids[J]. IEEE Transactions on Power Delivery, 2006, 21(3): 1414-1420.
    • (2006) IEEE Transactions on Power Delivery , vol.21 , Issue.3 , pp. 1414-1420
    • Meyer, C.1    de Doncker, R.W.2
  • 19
    • 77952220957 scopus 로고    scopus 로고
    • Study of LCC for power transformer in modification of transformer substation
    • CUI Xin-qi, Yin Lai-bin, FAN Chun-ju, et al. Study of LCC for power transformer in modification of transformer substation[J]. Power System Protection and Control, 2010, 38(7): 69-73.
    • (2010) Power System Protection and Control , vol.38 , Issue.7 , pp. 69-73
    • Cui, X.-Q.1    Yin, L.-B.2    Fan, C.-J.3
  • 20
    • 0031257375 scopus 로고    scopus 로고
    • Reliability and life cycle cost estimate of 400 kV substation layouts
    • Dan Karlsson, Hans-Erik Olovsson. Reliability and life cycle cost estimate of 400 kV substation layouts[J]. IEEE Transactions on Power Delivery, 1997, 12(4): 1486-1492.
    • (1997) IEEE Transactions on Power Delivery , vol.12 , Issue.4 , pp. 1486-1492
    • Karlsson, D.1    Olovsson, H.-E.2
  • 21
    • 33750093404 scopus 로고    scopus 로고
    • Calculation of stress-dependent life cycle costs of a substation subsystem-demonstrated for controlled energization of unloaded power transformers
    • Diego Politano, Klaus Fröhlich. Calculation of stress-dependent life cycle costs of a substation subsystem-demonstrated for controlled energization of unloaded power transformers[J]. IEEE Transactions on Power Delivery, 2006, 21(4): 2032-2038.
    • (2006) IEEE Transactions on Power Delivery , vol.21 , Issue.4 , pp. 2032-2038
    • Politano, D.1    Fröhlich, K.2
  • 22
    • 77955014170 scopus 로고    scopus 로고
    • Research of application schemes of smart substation based on whole-life cycle management
    • YI Yong-hui, WANG Kun, WANG Zhen-xue, et al. Research of application schemes of smart substation based on whole-life cycle management[J]. Power System Protection and Control, 2010, 38(13): 99-103.
    • (2010) Power System Protection and Control , vol.38 , Issue.13 , pp. 99-103
    • Yi, Y.-H.1    Wang, K.2    Wang, Z.-X.3
  • 23
    • 33947708442 scopus 로고    scopus 로고
    • Maintenance management of wind power systems using condition monitoring systems-life cycle cost analysis for two case studies
    • Julia Nilsson, Lina Bertling. Maintenance management of wind power systems using condition monitoring systems-life cycle cost analysis for two case studies[J]. IEEE Transactions on Energy Conversion, 2007, 22(1): 223-229.
    • (2007) IEEE Transactions on Energy Conversion , vol.22 , Issue.1 , pp. 223-229
    • Nilsson, J.1    Lina, B.2
  • 24
    • 13844309981 scopus 로고    scopus 로고
    • Implications of on-site distributed generation for commercial/industrial facilities
    • Manisa Pipattanasomporn, Michael Willinghan, Saifur Rahman. Implications of on-site distributed generation for commercial/industrial facilities[J]. IEEE Transactions on Power Systems, 2005, 20(1): 206-212.
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.1 , pp. 206-212
    • Pipattanasomporn, M.1    Willinghan, M.2    Rahman, S.3
  • 25
    • 14644394271 scopus 로고    scopus 로고
    • Uncertainty estimation by Monte Carlo simulation applied to life cycle inventory of cordless phones and microscale metallization processes
    • Andr A S G, Möller Patrik, Anderson J, et al. Uncertainty estimation by Monte Carlo simulation applied to life cycle inventory of cordless phones and microscale metallization processes[J]. IEEE Transactions on Electronics Packaging Manufacturing, 2004, 27(4): 233-245.
    • (2004) IEEE Transactions on Electronics Packaging Manufacturing , vol.27 , Issue.4 , pp. 233-245
    • Andr, A.S.G.1    Patrik, M.2    Anderson, J.3
  • 26
    • 52249119546 scopus 로고    scopus 로고
    • Life cycle cost technique and mian points concerning its application
    • WU Yi-liang, JIN Jia-shan, GU Jian, et al. Life cycle cost technique and mian points concerning its application[J]. Shanghai Electric Power, 2004, (4): 273-280.
    • (2004) Shanghai Electric Power , Issue.4 , pp. 273-280
    • Wu, Y.-L.1    Jin, J.-S.2    Gu, J.3
  • 27
    • 80053067410 scopus 로고    scopus 로고
    • Research and application of LCC management technique as in overseas electric power system
    • HAN Tian-xiang, HUANG Hua-wei, LU Yi-chun. Research and application of LCC management technique as in overseas electric power system[J]. Shanghai Electric Power, 2004, 3: 192-194.
    • (2004) Shanghai Electric Power , vol.3 , pp. 192-194
    • Han, T.-X.1    Huang, H.-W.2    Lu, Y.-C.3
  • 28
    • 80053076546 scopus 로고    scopus 로고
    • Life cycle cost of insulation design scheme policy decision on ±500 kV DC transmission lines
    • SHAO Chang-li, QIAO Guang-lin. Life cycle cost of insulation design scheme policy decision on ±500 kV DC transmission lines[J]. Jilin Electric Power, 2006, 34(2): 5-7.
    • (2006) Jilin Electric Power , vol.34 , Issue.2 , pp. 5-7
    • Shao, C.-L.1    Qiao, G.-L.2
  • 29
    • 80053082434 scopus 로고    scopus 로고
    • LCC model of 220 kV GIS equipments of Taihe substation and computation
    • TENG Le-tian, LING Ping, HUANG Yu, et al. LCC model of 220 kV GIS equipments of Taihe substation and computation[J]. Shanghai Electric Power, 2004, 3: 182-187.
    • (2004) Shanghai Electric Power , vol.3 , pp. 182-187
    • Teng, L.-T.1    Ling, P.2    Huang, Y.3
  • 30
    • 84997418411 scopus 로고    scopus 로고
    • The economic evaluation of 500 kV substation using LCC method
    • HAN Tian-xiang, LI Li-hua, YU Ying-hui. The economic evaluation of 500 kV substation using LCC method[J]. China Plant Engineering, 2008, 3: 14-16.
    • (2008) China Plant Engineering , vol.3 , pp. 14-16
    • Han, T.-X.1    Li, L.-H.2    Yu, Y.-H.3
  • 31
    • 80053078702 scopus 로고    scopus 로고
    • LCC research of operation modes for pumped storage power stations
    • ZHOU Xi-jun, HUANG Hua-wei, GE Jing, et al. LCC research of operation modes for pumped storage power stations[J]. East China Electric Power, 2006, 34(7): 67-70.
    • (2006) East China Electric Power , vol.34 , Issue.7 , pp. 67-70
    • Zhou, X.-J.1    Huang, H.-W.2    Ge, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.