-
1
-
-
0037448855
-
The impact of ERP on supply chain management: Exploratory endings from a European Delphi study
-
Akkermans, H.A., et al., 2003. The impact of ERP on supply chain management: Exploratory endings from a European Delphi study. European Journal of Operational Research, 146 (2), 284-301.
-
(2003)
European Journal of Operational Research
, vol.146
, Issue.2
, pp. 284-301
-
-
Akkermans, H.A.1
-
2
-
-
0035322377
-
Capacitated multi-item inventory systems with random and seasonally fluctuating demands: Implications for postponement strategies
-
Aviv, Y. and Federgruen, A., 2001. Capacitated multi-item inventory systems with random and seasonally fluctuating demands: Implications for postponement strategies. Management Science, 47 (4), 512-531. (Pubitemid 34192779)
-
(2001)
Management Science
, vol.47
, Issue.4
, pp. 512-531
-
-
Aviv, Y.1
Federgruen, A.2
-
3
-
-
0031997369
-
Guided local search with shifting bottleneck for job shop scheduling
-
Balas, E. and Vazacopoulos, A., 1998. Guided local search with shifting bottleneck for job shop scheduling. Management Science, 44 (2), 262-275. (Pubitemid 128596865)
-
(1998)
Management Science
, vol.44
, Issue.2
, pp. 262-275
-
-
Balas, E.1
Vazacopoulos, A.2
-
4
-
-
33751255097
-
Ant algorithms for a time and space constrained assembly line balancing problem
-
Bautista, J. and Pereira, J., 2005. Ant algorithms for a time and space constrained assembly line balancing problem. European Journal of Operational Research, 177 (3), 2016-2032.
-
(2005)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2016-2032
-
-
Bautista, J.1
Pereira, J.2
-
5
-
-
0034612523
-
Inspiration for optimization from social insect behaviour
-
DOI 10.1038/35017500
-
Bonabeau, E., Dorigo, M., and Theraulaz, G., 2000. Inspiration for optimization from social insect behavior. Nature, 406 (6791), 39-42. (Pubitemid 30460201)
-
(2000)
Nature
, vol.406
, Issue.6791
, pp. 39-42
-
-
Bonabeau, E.1
Dorigo, M.2
Theraulaz, G.3
-
6
-
-
0034661221
-
A model predictive framework for planning and scheduling problems: A case study of consumer goods supply chain
-
DOI 10.1016/S0098-1354(00)00469-5, PII S0098135400004695
-
Bose, S. and Pekny, J.F., 2000. A model predictive framework for planning and scheduling problems: A case study of consumer goods supply chain. Computers and Chemical Engineering, 24 (2-7), 329-335. (Pubitemid 30608250)
-
(2000)
Computers and Chemical Engineering
, vol.24
, Issue.2-7
, pp. 329-335
-
-
Bose, S.1
Pekny, J.F.2
-
7
-
-
33744826037
-
Order assignment and scheduling in a supply chain
-
DOI 10.1287/opre.1060.0280
-
Chen, Z.L. and Pundoor, G., 2006. Order assignment and scheduling in a supply chain. Operational Research, 54 (3), 555-572. (Pubitemid 43838366)
-
(2006)
Operations Research
, vol.54
, Issue.3
, pp. 555-572
-
-
Chen, Z.-L.1
Pundoor, G.2
-
8
-
-
0141453026
-
Product customization and price competition on the Internet
-
Dewan, R., Jing, B., and Seidmann, A., 2003. Product customization and price competition on the Internet. Management Science, 49 (8), 1055-1070.
-
(2003)
Management Science
, vol.49
, Issue.8
, pp. 1055-1070
-
-
Dewan, R.1
Jing, B.2
Seidmann, A.3
-
9
-
-
0034325988
-
Approaches to mass customization: Configurations and empirical validation
-
Duray, R., Ward, P.T., and Milligan, G.W., 2000. Approaches to mass customization: Configurations and empirical validation. Journal of Operational Management, 18 (6), 605-625.
-
(2000)
Journal of Operational Management
, vol.18
, Issue.6
, pp. 605-625
-
-
Duray, R.1
Ward, P.T.2
Milligan, G.W.3
-
10
-
-
0042306179
-
A model predictive control strategy for supply chain optimization
-
DOI 10.1016/S0098-1354(03)00047-4
-
Edgar, P.L., Ydstie, B.E., and Grossmann, I.E., 2003. A model predictive control strategy for supply chain optimization. Computers and Chemical Engineering, 27 (8-9), 1201-1218. (Pubitemid 36897196)
-
(2003)
Computers and Chemical Engineering
, vol.27
, Issue.8-9
, pp. 1201-1218
-
-
Perea-Lopez, E.1
Ydstie, B.E.2
Grossmann, I.E.3
-
11
-
-
0033729541
-
Evaluation of supply chain structures through modularization and postponement
-
Ernst, R. and Kamrad, B., 2000. Evaluation of supply chain structures through modularization and postponement. European Journal of Operational Research, 124 (3), 495-510.
-
(2000)
European Journal of Operational Research
, vol.124
, Issue.3
, pp. 495-510
-
-
Ernst, R.1
Kamrad, B.2
-
12
-
-
0037905654
-
Defining the Internet-based supply chain system for mass customized markets
-
Ghiassi, M. and Spera, C., 2003. Defining the Internet-based supply chain system for mass customized markets. Computers and Industrial Engineering, 45 (1), 17-41.
-
(2003)
Computers and Industrial Engineering
, vol.45
, Issue.1
, pp. 17-41
-
-
Ghiassi, M.1
Spera, C.2
-
13
-
-
25144480454
-
Optimizing the supply chain configuration for new products
-
DOI 10.1287/mnsc.1050.0367
-
Graves, S.C. and Willems, S.P., 2005. Optimizing the supply chain configuration for new products. Management Science, 51 (8), 1165-1180. (Pubitemid 41344648)
-
(2005)
Management Science
, vol.51
, Issue.8
, pp. 1165-1180
-
-
Graves, S.C.1
Willems, S.P.2
-
14
-
-
2342539189
-
Supply chain scheduling: Batching and delivery
-
Hall, N.G. and Potts, C.N., 2003. Supply chain scheduling: Batching and delivery. Operational Research, 51 (4), 566-584.
-
(2003)
Operational Research
, vol.51
, Issue.4
, pp. 566-584
-
-
Hall, N.G.1
Potts, C.N.2
-
15
-
-
0041627447
-
Towards high value-added products and service: Mass customization and beyond
-
Jiao, J.X., Ma, Q.H., and Tseng, M.M., 2003. Towards high value-added products and service: Mass customization and beyond. Technovation, 23 (10), 809-821.
-
(2003)
Technovation
, vol.23
, Issue.10
, pp. 809-821
-
-
Jiao, J.X.1
Ma, Q.H.2
Tseng, M.M.3
-
16
-
-
0036642595
-
Advanced planning and scheduling with outsourcing in manufacturing supply chain
-
DOI 10.1016/S0360-8352(02)00079-7, PII S0360835202000797
-
Lee, Y.H., Jeong, C.S., and Moon, C., 2002. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering, 43 (2), 351-374. (Pubitemid 34551917)
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.1-2
, pp. 351-374
-
-
Lee, Y.H.1
Jeong, C.S.2
Moon, C.3
-
17
-
-
11844304127
-
Information distortion in a supply chain: The bullwhip effect
-
DOI 10.1287/mnsc.1040.0266
-
Lee, H.L., Padmanabhan, V., and Whang, S., 2004. Information distortion in a supply chain: The bullwhip effect. Management Science, 50 (12, Supplement), 1875-1886. (Pubitemid 40086735)
-
(2004)
Management Science
, vol.50
, Issue.12 SUPPL.
, pp. 1875-1886
-
-
Lee, H.L.1
Padmanabhan, V.2
Whang, S.3
-
18
-
-
0037810500
-
Fundamental modes of operation for mass customization
-
MacCarthy, B., Brabazon, P.G., and Bramham, J., 2003. Fundamental modes of operation for mass customization. International Journal of Production Economics, 85 (3), 289-304.
-
(2003)
International Journal of Production Economics
, vol.85
, Issue.3
, pp. 289-304
-
-
MacCarthy, B.1
Brabazon, P.G.2
Bramham, J.3
-
19
-
-
0035400792
-
Hopes for the future of operations management
-
DOI 10.1016/S0272-6963(01)00056-0, PII S0272696301000560
-
Meredith, J.R., 2001. Hopes for the future of operations management. Journal of Operational Management, 19 (4), 397-402. (Pubitemid 32451630)
-
(2001)
Journal of Operations Management
, vol.19
, Issue.4
, pp. 397-402
-
-
Meredith, J.R.1
-
20
-
-
0036642688
-
Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
-
DOI 10.1016/S0360-8352(02)00078-5, PII S0360835202000785
-
Moon, C., Kim, J.S., and Hur, S., 2002. Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain. Computers and Industrial Engineering, 43 (1), 331-349. (Pubitemid 34551916)
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.1-2
, pp. 331-349
-
-
Moon, C.1
Kim, J.2
Hur, S.3
-
22
-
-
3142674870
-
Mass customization in terms of the customer order decoupling point
-
Rudberg, M. and Wikner, J., 2004. Mass customization in terms of the customer order decoupling point. Production Planning and Control, 15 (4), 445-458.
-
(2004)
Production Planning and Control
, vol.15
, Issue.4
, pp. 445-458
-
-
Rudberg, M.1
Wikner, J.2
-
23
-
-
3142660217
-
Supply-chain configurations for mass customization
-
Salvador, F., Rungtusanatham, M., and Forza, C., 2004. Supply-chain configurations for mass customization. Production Planning and Control, 15 (4), 381-397.
-
(2004)
Production Planning and Control
, vol.15
, Issue.4
, pp. 381-397
-
-
Salvador, F.1
Rungtusanatham, M.2
Forza, C.3
-
24
-
-
0035252503
-
Impact of time-based manufacturing practices on mass customization and value to customer
-
DOI 10.1016/S0272-6963(00)00056-5
-
Tu, Q., Vonderembse, M.A., and Ragu-Nathan, T.S., 2001. The impact of time-based manufacturing practices on mass customization and value to customer. Journal of Operational Management, 19 (2), 201-217. (Pubitemid 32130381)
-
(2001)
Journal of Operations Management
, vol.19
, Issue.2
, pp. 201-217
-
-
Tu, Q.1
Vonderembse, M.A.2
Ragu-Nathan, T.S.3
-
25
-
-
0037310041
-
An evaluation of freight consolidation policies in global third party logistics
-
DOI 10.1016/S0305-0483(02)00094-4, PII S0305048302000944
-
Tyan, J.C., Wang, F.K., and Timon, C.D., 2003. An evaluation of freight consolidation policies in global third party logistics. Omega, 31 (1), 55-62. (Pubitemid 36153365)
-
(2003)
Omega
, vol.31
, Issue.1
, pp. 55-62
-
-
Tyan, J.C.1
Wang, F.-K.2
Du, T.C.3
-
26
-
-
58049215328
-
Optimization analysis of supply chain scheduling in mass customization
-
Yao, J.M. and Liu, L.W., 2009. Optimization analysis of supply chain scheduling in mass customization. International Journal of Production Economics, 117 (1), 197-211.
-
(2009)
International Journal of Production Economics
, vol.117
, Issue.1
, pp. 197-211
-
-
Yao, J.M.1
Liu, L.W.2
-
27
-
-
78049335481
-
Analysis on ant optimization algorithm for supply chain dynamic scheduling in mass customization
-
(in Chinese)
-
Yao, J.M., Liu, L.W., and Pu, Y., 2007. Analysis on ant optimization algorithm for supply chain dynamic scheduling in mass customization. Management Science Journal of China, 10 (3), 7-14 (in Chinese).
-
(2007)
Management Science Journal of China
, vol.10
, Issue.3
, pp. 7-14
-
-
Yao, J.M.1
Liu, L.W.2
Pu, Y.3
-
28
-
-
78650854694
-
Scheduling optimization of supply chain in mass customization based on dynamic production ability restriction
-
(in Chinese)
-
Yao, J.M. and Pu, Y., 2005. Scheduling optimization of supply chain in mass customization based on dynamic production ability restriction. System Engineering, 23 (2), 25-30 (in Chinese).
-
(2005)
System Engineering
, vol.23
, Issue.2
, pp. 25-30
-
-
Yao, J.M.1
Pu, Y.2
-
29
-
-
58049203125
-
Research on time threshold theory of mass customization in supply chain environment
-
(in Chinese)
-
Yao, J.M., Pu, Y., and Zhang, X.M., 2005a. Research on time threshold theory of mass customization in supply chain environment. Industrial Engineering and Management, 10 (2), 64-70 (in Chinese).
-
(2005)
Industrial Engineering and Management
, vol.10
, Issue.2
, pp. 64-70
-
-
Yao, J.M.1
Pu, Y.2
Zhang, X.M.3
-
30
-
-
58049191653
-
Scheduling optimization of supply chain in mass customization based on profits preference decision
-
(in Chinese)
-
Yao, J.M., Pu, Y., and Zhang, X.M., 2005b. Scheduling optimization of supply chain in mass customization based on profits preference decision. Chinese Journal of Management Science, 13 (5), 54-60 (in Chinese).
-
(2005)
Chinese Journal of Management Science
, vol.13
, Issue.5
, pp. 54-60
-
-
Yao, J.M.1
Pu, Y.2
Zhang, X.M.3
-
31
-
-
40649118705
-
Dynamic supply chain scheduling based on improved ant algorithm
-
(in Chinese)
-
Yao, J.M., Zhang, X.M., and Liu, L.W., 2006. Dynamic supply chain scheduling based on improved ant algorithm. Chinese Journal of Management Science, 3 (14), 20-26 (in Chinese).
-
(2006)
Chinese Journal of Management Science
, vol.3
, Issue.14
, pp. 20-26
-
-
Yao, J.M.1
Zhang, X.M.2
Liu, L.W.3
-
32
-
-
58049217711
-
Analysis of supply chain plan and scheduling optimization in mass customization
-
(in Chinese)
-
Yao, J.M. and Zhou, G.H., 2003. Analysis of supply chain plan and scheduling optimization in mass customization. Management Science Journal of China, 6 (5), 58-64 (in Chinese).
-
(2003)
Management Science Journal of China
, vol.6
, Issue.5
, pp. 58-64
-
-
Yao, J.M.1
Zhou, G.H.2
|