-
2
-
-
0034699449
-
Direct electrochemical reduction of titanium dioxide to titanium in molten calcium chloride
-
Chen, G. Z., Fray, D. J. and Farthing, T. W. 2000. Direct electrochemical reduction of titanium dioxide to titanium in molten calcium chloride, Nature, 407, 361-364.
-
(2000)
Nature
, vol.407
, pp. 361-364
-
-
Chen, G.Z.1
Fray, D.J.2
Farthing, T.W.3
-
3
-
-
23844466908
-
Electrochemistry at conductor/insulator/electrolyte three-phase interlines: A thin layer model
-
DOI 10.1021/jp044604r
-
Deng, Y., Wang, D. H., Xiao, W., Jin, X. B., Hu, X. H. and Chen, G. Z. 2005. Electrochemistry at conductor/insulator/electrolyte three-phase interlines: a thin layer model, J. Phys. Chem. B, 109B, 14043-14051. (Pubitemid 41163111)
-
(2005)
Journal of Physical Chemistry B
, vol.109
, Issue.29
, pp. 14043-14051
-
-
Deng, Y.1
Wang, D.2
Xiao, W.3
Jin, X.4
Hu, X.5
Chen, G.Z.6
-
4
-
-
41549157445
-
Effect of Fe addition on self-propagating hightemperature synthesis of Ti5Si3 in Fe-Ti-Si system
-
Guan, Q. L., Wang, H. Y., Li, S. L., Zhang, W. N., Lü , S. J. and Jiang, Q. C. 2008. Effect of Fe addition on self-propagating hightemperature synthesis of Ti5Si3 in Fe-Ti-Si system, J. Alloys Compd, 456, 79-84.
-
(2008)
J. Alloys Compd
, vol.456
, pp. 79-84
-
-
Guan, Q.L.1
Wang, H.Y.2
Li, S.L.3
Zhang, W.N.4
Lü, S.J.5
Jiang, Q.C.6
-
5
-
-
77951484073
-
Study on leaching Ti from Ti bearing blast furnace slag by sulphuric acid
-
Jiang, T., Dong, H. G., Guo, Y. F., Li, G. H. and Yang, Y. B. 2010. Study on leaching Ti from Ti bearing blast furnace slag by sulphuric acid, Miner. Process. Extract. Metall. (Trans. Inst. Miner. Metall. C), 119C, 33-38.
-
(2010)
Miner. Process. Extract. Metall. (Trans. Inst. Miner. Metall. C)
, vol.119 C
, pp. 33-38
-
-
Jiang, T.1
Dong, H.G.2
Guo, Y.F.3
Li, G.H.4
Yang, Y.B.5
-
6
-
-
33846887679
-
Solid oxide membrane (SOM) technology for environmentally sound production of tantalum metal and alloys from their oxide sources
-
Krishnan, A., Lu, X. G. and Pal, U. B. 2005a. Solid oxide membrane (SOM) technology for environmentally sound production of tantalum metal and alloys from their oxide sources, Scand. J. Metall., 34, 293-301.
-
(2005)
Scand. J. Metall.
, vol.34
, pp. 293-301
-
-
Krishnan, A.1
Lu, X.G.2
Pal, U.B.3
-
7
-
-
24744463926
-
Solid oxide membrane process for magnesium production directly from magnesium oxide
-
Krishnan, A., Lu, X. G. and Pal, U. B. 2005b. Solid oxide membrane process for magnesium production directly from magnesium oxide, Metall. Mater. Trans. B, 36B, 463-473. (Pubitemid 41290649)
-
(2005)
Metallurgical and Materials Transactions B: Process Metallurgy and Materials Processing Science
, vol.36
, Issue.4
, pp. 463-473
-
-
Krishnan, A.1
Lu, X.G.2
Pal, U.B.3
-
8
-
-
31744441851
-
Solid state reduction of a natural ilmenite
-
DOI 10.1016/j.mineng.2005.09.015, PII S0892687505003298
-
Kucukkaragoz, C. S. and Eric, R. H. 2006. Solid state reduction of a natural ilmenite, Miner. Eng., 19, 334-337. (Pubitemid 43177634)
-
(2006)
Minerals Engineering
, vol.19
, Issue.3 SPEC. ISS.
, pp. 334-337
-
-
Kucukkaragoz, C.S.1
Eric, R.H.2
-
9
-
-
0034317299
-
Kinetics of nonisothermal precipitation process of the perovskite phase in CaO- TiO2-SiO2-Al2O3-MgO system
-
Li, Y. H., Lou, T. P., Xia, Y. H. and Sui, Z. T. 2000. Kinetics of nonisothermal precipitation process of the perovskite phase in CaO- TiO2-SiO2-Al2O3-MgO system, J. Mater. Sci., 35, 5635-5637.
-
(2000)
J. Mater. Sci.
, vol.35
, pp. 5635-5637
-
-
Li, Y.H.1
Lou, T.P.2
Xia, Y.H.3
Sui, Z.T.4
-
11
-
-
33745615129
-
Extraction of titanium from different titania precursors by the FFC Cambridge process
-
DOI 10.1016/j.jallcom.2005.10.048, PII S0925838805016348
-
Ma, M., Wang, D. H., Wang, W. G., Hu, X. H., Jin, X. B. and Chen, G. Z. 2006. Extraction of titanium from different titania precursors by the FFC Cambridge process, J. Alloys Compd, 420, 37-45. (Pubitemid 43994420)
-
(2006)
Journal of Alloys and Compounds
, vol.420
, Issue.1-2
, pp. 37-45
-
-
Ma, M.1
Wang, D.2
Wang, W.3
Hu, X.4
Jin, X.5
Chen, G.Z.6
-
12
-
-
0043210943
-
Pinpoint and bulk electrochemical reduction of insulating silicon dioxide to silicon
-
Nohira, T., Yasuda, K. and Ito, Y. 2003. Pinpoint and bulk electrochemical reduction of insulating silicon dioxide to silicon, Nat. Mater., 2, 397-401.
-
(2003)
Nat. Mater.
, vol.2
, pp. 397-401
-
-
Nohira, T.1
Yasuda, K.2
Ito, Y.3
-
13
-
-
67449124704
-
A lower carbon footprint process for production of metals from their oxide sources
-
Pal, U. B. 2008. A lower carbon footprint process for production of metals from their oxide sources, JOM, 60, 43-47.
-
(2008)
JOM
, vol.60
, pp. 43-47
-
-
Pal, U.B.1
-
14
-
-
37249046544
-
The use of solid-oxide-membrane technology for electrometallurgy
-
DOI 10.1007/s11837-007-0064-x
-
Pal, U. B. and Powell IV, A. C. 2007. The use of solid-oxide- membrane technology for electrometallurgy, JOM, 59, 44-49. (Pubitemid 350267487)
-
(2007)
JOM
, vol.59
, Issue.5
, pp. 44-49
-
-
Pal, U.B.1
Powell IV, A.C.2
-
15
-
-
57949114665
-
Electrochemical conversion of oxide precursors to consolidated Zr and Zr-2?5Nb tubes
-
Peng, J. J., Jiang, K., Xiao, W., Wang, D. H., Jin, X. B. and Chen, G. Z. 2008. Electrochemical conversion of oxide precursors to consolidated Zr and Zr-2?5Nb tubes, Chem. Mater., 20, 7274-7280.
-
(2008)
Chem. Mater.
, vol.20
, pp. 7274-7280
-
-
Peng, J.J.1
Jiang, K.2
Xiao, W.3
Wang, D.H.4
Jin, X.B.5
Chen, G.Z.6
-
16
-
-
11344264705
-
Production of Fe-Ti-Si alloys from the ilmenite ore and their magnetic properties
-
DOI 10.1016/j.jallcom.2004.07.043, PII S0925838804009843
-
Saito, T., Wakabayashi, K., Yamashita, S. and Sasabe, M. 2005. Production of Fe-Ti-Si alloys from the ilmenite ore and their magnetic properties, J. Alloys Compd, 388, 258-261. (Pubitemid 40073382)
-
(2005)
Journal of Alloys and Compounds
, vol.388
, Issue.2
, pp. 258-261
-
-
Saito, T.1
Wakabayashi, K.2
Yamashita, S.3
Sasabe, M.4
-
17
-
-
0033115179
-
A pilotscale trial of an improved galvanic deoxidation process for refining molten copper
-
Soral, P., Pal, U. B., Larson, H. R. and Schroeder, B. 1999. A pilotscale trial of an improved galvanic deoxidation process for refining molten copper, Metall. Mater. Trans. B, 30B, 307-321.
-
(1999)
Metall. Mater. Trans. B
, vol.30 B
, pp. 307-321
-
-
Soral, P.1
Pal, U.B.2
Larson, H.R.3
Schroeder, B.4
-
18
-
-
48849106234
-
Solid oxide membrane technology for environmentally sound production of titanium
-
Suput, M., DeLucas, R., Pati, S., Ye, G., Pal, U. B. and Powell IV, A. C. 2008. Solid oxide membrane technology for environmentally sound production of titanium, Miner. Process. Extract. Metall. (Trans. Inst. Miner. Metall. C), 117C, 118-122.
-
(2008)
Miner. Process. Extract. Metall. (Trans. Inst. Miner. Metall. C)
, vol.117 C
, pp. 118-122
-
-
Suput, M.1
DeLucas, R.2
Pati, S.3
Ye, G.4
Pal, U.B.5
Powell IV, A.C.6
-
19
-
-
33846484466
-
Direct reduction processes for titanium oxide in molten salt
-
DOI 10.1007/s11837-007-0014-7
-
Suzuki, R. O. 2007. Direct reduction processes for titanium oxide in molten salt, JOM, 59, 68-71. (Pubitemid 46165051)
-
(2007)
JOM
, vol.59
, Issue.1
, pp. 68-71
-
-
Suzuki, R.O.1
-
21
-
-
63649156853
-
Synthesis of FeTi from mixed oxide precursors
-
Tan, S., Örs, T., Aydýnol, M. K., Öztürk, T. and Karakaya, I. 2009. Synthesis of FeTi from mixed oxide precursors, J. Alloys Compd, 475, 368-372.
-
(2009)
J. Alloys Compd
, vol.475
, pp. 368-372
-
-
Tan, S.1
Örs, T.2
Aydýnol, M.K.3
Öztürk, T.4
Karakaya, I.5
-
22
-
-
41949083620
-
Isothermal precipitation and growth process of perovskite phase in oxidized titanium bearing slag
-
Wang, M. Y., Wang, X. W., He, Y. H., Lou, T. P. and Sui, Z. T. 2008. Isothermal precipitation and growth process of perovskite phase in oxidized titanium bearing slag, Trans. Nonferrous Met. China, 18, (4), 459-462.
-
(2008)
Trans. Nonferrous Met. China
, vol.18
, Issue.4
, pp. 459-462
-
-
Wang, M.Y.1
Wang, X.W.2
He, Y.H.3
Lou, T.P.4
Sui, Z.T.5
-
23
-
-
33745640045
-
2 and precipitation behavior of perovskite phase in titania bearing slag
-
DOI 10.1016/S1003-6326(06)60072-1
-
2 and precipitation behavior of perovskite phase in titania bearing slag, Trans. Nonferrous Met. China, 16, (2), 421-425. (Pubitemid 43968911)
-
(2006)
Transactions of Nonferrous Metals Society of China (English Edition)
, vol.16
, Issue.2
, pp. 421-425
-
-
Wang, M.-Y.1
Zhang, L.-N.2
Zhang, L.3
Sui, Z.-T.4
Tu, G.-F.5
-
24
-
-
33748160050
-
2
-
2, ChemPhysChem, 7, 1750-1758.
-
(2006)
ChemPhysChem
, vol.7
, pp. 1750-1758
-
-
Xiao, W.1
Jin, X.B.2
Deng Y.Wang, D.H.3
Hu, X.B.4
Chen, G.Z.5
-
25
-
-
79955116937
-
Preparation of Ti-Fe based hydrogen storage alloy by SOM method
-
Ye, X. S., Lu, X. G., Li, C. H., Ding, W. Z., Zou, X. L., Gao, Y. H. and Zhong, Q. D. 2010. Preparation of Ti-Fe based hydrogen storage alloy by SOM method, Int. J. Hydrog. Energy.
-
(2010)
Int. J. Hydrog. Energy
-
-
Ye, X.S.1
Lu, X.G.2
Li, C.H.3
Ding, W.Z.4
Zou, X.L.5
Gao, Y.H.6
Zhong, Q.D.7
-
26
-
-
33646574673
-
A new process for comprehensive utilization of complex titania ore
-
Yuan, Z. F., Wang, X. Q., Xu, C., Li, W. B. and Kwauk, M. 2006. A new process for comprehensive utilization of complex titania ore, Miner. Eng., 19, 975-978.
-
(2006)
Miner. Eng.
, vol.19
, pp. 975-978
-
-
Yuan, Z.F.1
Wang, X.Q.2
Xu, C.3
Li, W.B.4
Kwauk, M.5
-
27
-
-
77953132997
-
A direct electrochemical route from oxides to Ti-Si intermetallics
-
Zou, X. L., Lu, X. G., Li, C. H. and Zhou, Z. F. 2010. A direct electrochemical route from oxides to Ti-Si intermetallics, Electrochim. Acta, 55, 5173-5179.
-
(2010)
Electrochim. Acta
, vol.55
, pp. 5173-5179
-
-
Zou, X.L.1
Lu, X.G.2
Li, C.H.3
Zhou, Z.F.4
|