메뉴 건너뛰기




Volumn 189, Issue 1, 2011, Pages 25-42

Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology

Author keywords

[No Author keywords available]

Indexed keywords


EID: 80052381461     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-011-0940-1     Document Type: Article
Times cited : (13)

References (28)
  • 1
    • 17444384857 scopus 로고    scopus 로고
    • Application of the Cross-Entropy method to the buffer allocation problem in a simulation-based environment
    • Alon, G., Kroese, D. P., Raviv, T., & Rubinstein, R. Y. (2005). Application of the Cross-Entropy method to the buffer allocation problem in a simulation-based environment. Annals of Operations Research, 134, 137-151.
    • (2005) Annals of Operations Research , vol.134 , pp. 137-151
    • Alon, G.1    Kroese, D.P.2    Raviv, T.3    Rubinstein, R.Y.4
  • 2
    • 17744363105 scopus 로고    scopus 로고
    • Global likelihood optimization via the cross-entropy method with an application to mixture models
    • R. G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters (Eds.), New York: IEEE Press
    • Botev, Z., & Kroese, D. P. (2004). Global likelihood optimization via the cross-entropy method with an application to mixture models. In R. G. Ingalls, M. D. Rossetti, J. S. Smith, & B. A. Peters (Eds.), Proceedings of the 2004 winter simulation conference (pp. 529-535). New York: IEEE Press.
    • (2004) Proceedings of the 2004 Winter Simulation Conference , pp. 529-535
    • Botev, Z.1    Kroese, D.P.2
  • 3
    • 0030683050 scopus 로고    scopus 로고
    • Activity delay in stochastic project networks
    • Buss, A. H., & Rosenblatt, M. J. (1997). Activity delay in stochastic project networks. Operations Research, 45(1), 126-139.
    • (1997) Operations Research , vol.45 , Issue.1 , pp. 126-139
    • Buss, A.H.1    Rosenblatt, M.J.2
  • 4
    • 17444420771 scopus 로고    scopus 로고
    • Managing stochastic, finite capacity, multi-project systems through the Cross-Entropy methodology
    • Cohen, I., Golany, B., & Shtub, A. (2005). Managing stochastic, finite capacity, multi-project systems through the Cross-Entropy methodology. Annals of Operations Research, 134, 189-199.
    • (2005) Annals of Operations Research , vol.134 , pp. 189-199
    • Cohen, I.1    Golany, B.2    Shtub, A.3
  • 8
    • 0035546163 scopus 로고    scopus 로고
    • On the optimal release time of jobs with random processing times, with extensions to other criteria
    • Elmaghraby, S. E. (2001). On the optimal release time of jobs with random processing times, with extensions to other criteria. International Journal of Production Economics, 74, 103-113.
    • (2001) International Journal of Production Economics , vol.74 , pp. 103-113
    • Elmaghraby, S.E.1
  • 10
    • 72249103373 scopus 로고
    • Program evaluation and review technique
    • Fazar, W. (1959). Program evaluation and review technique. American Statistician, 13(2), 10.
    • (1959) American Statistician , vol.13 , Issue.2 , pp. 10
    • Fazar, W.1
  • 11
    • 0033362571 scopus 로고    scopus 로고
    • Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process
    • Golany, B., Dar-El, E. M., & Zeev, N. (1999). Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process. IIE Transactions, 31, 771-781.
    • (1999) IIE Transactions , vol.31 , pp. 771-781
    • Golany, B.1    Dar-El, E.M.2    Zeev, N.3
  • 12
  • 13
    • 0004269080 scopus 로고    scopus 로고
    • Boston: PWS Publishing Company
    • Heragu, S. (1997). Facilities design. Boston: PWS Publishing Company.
    • (1997) Facilities Design
    • Heragu, S.1
  • 14
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: survey and research potentials
    • Herroelen, W. S., & Leus, R. (2005). Project scheduling under uncertainty: survey and research potentials. European Journal of Operational Research, 165, 289-306.
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.S.1    Leus, R.2
  • 18
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolish, R., & Padman, R. (2001). An integrated survey of deterministic project scheduling. Omega, 29, 249-272.
    • (2001) Omega , vol.29 , pp. 249-272
    • Kolish, R.1    Padman, R.2
  • 19
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolish, R., Sprecher, A., & Drexl, A. (1995). Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41(10), 1693-1703.
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolish, R.1    Sprecher, A.2    Drexl, A.3
  • 20
    • 72249090755 scopus 로고
    • Technical Report, Michigan Univ., Dept. of Industrial Engineering, Ann-Arbor, MI, USA
    • Krishnamoorthy, M. (1968). Critical path method: a review. Technical Report, Michigan Univ., Dept. of Industrial Engineering, Ann-Arbor, MI, USA.
    • (1968) Critical Path Method: A Review
    • Krishnamoorthy, M.1
  • 22
    • 0001501655 scopus 로고
    • Application of a technique for research and development of program evaluation
    • Malcom, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959). Application of a technique for research and development of program evaluation. Operations Research, 7, 646-669.
    • (1959) Operations Research , vol.7 , pp. 646-669
    • Malcom, D.G.1    Roseboom, J.H.2    Clark, C.E.3    Fazar, W.4
  • 23
    • 0033896225 scopus 로고    scopus 로고
    • Critical chain: the theory of constraints applied to project management
    • Rand, G. K. (2000). Critical chain: the theory of constraints applied to project management. International Journal of Project Management, 18, 173-177.
    • (2000) International Journal of Project Management , vol.18 , pp. 173-177
    • Rand, G.K.1
  • 26
    • 64049093897 scopus 로고    scopus 로고
    • Scheduling projects with stochastic activity duration to maximize expected net present value
    • Sobel, M. J., Szmerekovsky, J. G., & Tilson, V. (2009). Scheduling projects with stochastic activity duration to maximize expected net present value. European Journal of Operational Research, 198(3), 697-705.
    • (2009) European Journal of Operational Research , vol.198 , Issue.3 , pp. 697-705
    • Sobel, M.J.1    Szmerekovsky, J.G.2    Tilson, V.3
  • 28
    • 30844459257 scopus 로고    scopus 로고
    • Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result
    • Trietsch, D. (2006b). Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result. International Journal of Production Research, 44, 627-637.
    • (2006) International Journal of Production Research , vol.44 , pp. 627-637
    • Trietsch, D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.