-
1
-
-
0004101786
-
-
Bureau of Public Roads, Washington, DC: US Department of Commerce, Urban Planning Division
-
Bureau of Public Roads, 1964. Traffic assignment manual. Washington, DC: US Department of Commerce, Urban Planning Division.
-
(1964)
Traffic Assignment Manual
-
-
-
2
-
-
80051872905
-
Building our way out of congestion?
-
Minneapolis, MN: Minnesota Department of Transportation, Technical Report, Mn/DOT 2002-01
-
Davis, G. and Sanderson, K., 2002. Building our way out of congestion? Highway capacity for the twin cities. Minneapolis, MN: Minnesota Department of Transportation, Technical Report, Mn/DOT 2002-01.
-
(2002)
Highway Capacity for the Twin Cities
-
-
Davis, G.1
Sanderson, K.2
-
3
-
-
80051873214
-
Wednesday: Colorado firm wins I-35W bridge contract
-
20 September [online], Available from, Accessed 23 July 2011
-
Kaszuba, M. and Foti, J., 2007. Wednesday: Colorado firm wins I-35W bridge contract. Star Tribune, 20 September [online]. Available from: http://www.startribune.com/local/11594166.html [Accessed 23 July 2011].
-
(2007)
Star Tribune
-
-
Kaszuba, M.1
Foti, J.2
-
4
-
-
0029332303
-
Contributions to logit assignment model
-
Leurent, F.M., 1995. Contributions to logit assignment model. Transportation Research Record, 1493, 207-212.
-
(1995)
Transportation Research Record
, vol.1493
, pp. 207-212
-
-
Leurent, F.M.1
-
5
-
-
80051880650
-
-
Minneapolis, MN: Minnesota Department of Transportation, Technical Report, Mn/DOT 2006-36 [online]. Available from, Accessed 23 July 2011
-
Levinson, D., de Oca, N.M., and Xie, F., 2006. Beyond business as usual: ensuring the network we want is the network we get. Minneapolis, MN: Minnesota Department of Transportation, Technical Report, Mn/DOT 2006-36 [online]. Available from: http://nexus.umn.edu/Projects/BBAU/BBAU-Final.pdf [Accessed 23 July 2011].
-
(2006)
Beyond Business as Usual: Ensuring the Network We Want is The Network We Get
-
-
Levinson, D.1
de Oca, N.M.2
Xie, F.3
-
6
-
-
84862700540
-
Forecasting and evaluating network growth
-
online, Available from, Accessed 23 July 2011
-
Levinson, D., Xie, F., and de Oca, N.M., 2009. Forecasting and evaluating network growth. Networks and Spatial Economics [online]. Available from: http://nexus.umn.edu/Papers/FENG.pdf [Accessed 23 July 2011].
-
(2009)
Networks and Spatial Economics
-
-
Levinson, D.1
Xie, F.2
de Oca, N.M.3
-
7
-
-
84924913130
-
-
Metropolitan Council, Minneapolis, MN: Metropolitan Council. Available from, Accessed 23 July 2011
-
Metropolitan Council, 2003. 2000 travel behavior inventory: home interview survey data and methodology, Technical Report. Minneapolis, MN: Metropolitan Council. Available from: http://www.metrocouncil.org/planning/transportation/TBI-2000.htm [Accessed 23 July 2011].
-
(2003)
2000 Travel Behavior Inventory: Home Interview Survey Data and Methodology, Technical Report
-
-
-
8
-
-
84879016050
-
Benefit-cost analysis for transportation projects
-
Minnesota Department of Transportation, online, Minneapolis, MN: Office of Investment Management. Available from, Accessed 23 July 2011
-
Minnesota Department of Transportation, 2005. Benefit-cost analysis for transportation projects. Technical report [online]. Minneapolis, MN: Office of Investment Management. Available from: http://www.dot.state.mn.us/planning/program/benefitcost.html [Accessed 23 July 2011].
-
(2005)
Technical Report
-
-
-
9
-
-
80051870628
-
Minnesota Department of Transportation
-
Minneapolis, MN: Office of Investment Management [online]. Available from, Accessed 23 July 2011
-
Minnesota Department of Transportation, 2007. Road-user cost due to unavailability of interstate 35W Mississippi river crossing at Minneapolis, Minnesota, Technical report. Minneapolis, MN: Office of Investment Management [online]. Available from: www.dot.state.mn.us/i35wbridge/rebuild/pdfs/I-35WMississippiRiverCrossingRoad-UserCost.pdf [Accessed 23 July 2011].
-
(2007)
Road-user Cost Due to Unavailability of Interstate 35W Mississippi River Crossing at Minneapolis, Minnesota, Technical Report
-
-
-
11
-
-
0030282883
-
Cost-of-delay studies for freeway closures caused by Northridge earthquake
-
Wesemann, L., et al., 1996. Cost-of-delay studies for freeway closures caused by Northridge earthquake. Transportation Research Record, 1559, 67-75.
-
(1996)
Transportation Research Record
, vol.1559
, pp. 67-75
-
-
Wesemann, L.1
-
12
-
-
85015924819
-
The use of road infrastructure data for urban transportation planning: Issues and opportunities
-
Washington, DC: American Society of Civil Engineers
-
Xie, F. and Levinson, D., 2008. The use of road infrastructure data for urban transportation planning: issues and opportunities. Civil infrastructure reporting and as-set management: best practices and opportunities. Washington, DC: American Society of Civil Engineers, 93-98.
-
(2008)
Civil Infrastructure Reporting and As-set Management: Best Practices and Opportunities
, pp. 93-98
-
-
Xie, F.1
Levinson, D.2
-
13
-
-
80051886198
-
-
Minneapolis, MN: Department of Civil Engineering, University of Minnesota [online]. Available from, Accessed 23 July 2011
-
Zhu, S. and Levinson, D., 2008. A review of research on planned and unplanned disruptions to transportation networks, Working paper. Minneapolis, MN: Department of Civil Engineering, University of Minnesota [online]. Available from: http://nexus.umn.edu/Papers/DisruptionReview.pdf [Accessed 23 July 2011].
-
(2008)
A Review of Research on Planned and Unplanned Disruptions to Transportation Networks, Working Paper
-
-
Zhu, S.1
Levinson, D.2
|