-
1
-
-
54749092533
-
Feasibility analysis of applying 24h precipitation forecasts from the Central Meteorological Observatory (in Chinese)
-
B. D. Wang Y. Y. Zhu G. H. Zhang, et al. 2005 Feasibility analysis of applying 24h precipitation forecasts from the Central Meteorological Observatory (in Chinese) Hydrology 25 3 30 34
-
(2005)
Hydrology
, vol.25
, Issue.3
, pp. 30-34
-
-
Wang, B.D.1
Zhu, Y.Y.2
Zhang, G.H.3
-
2
-
-
76349124255
-
Dynamically control of reservoir normal level in flood season based on short-term rainfall forecast (in Chinese)
-
H. C. Zhou L. Q. Li J. Hu, et al. 2005 Dynamically control of reservoir normal level in flood season based on short-term rainfall forecast (in Chinese) Water Pow 31 8 22 26
-
(2005)
Water Pow
, vol.31
, Issue.8
, pp. 22-26
-
-
Zhou, H.C.1
Li, L.Q.2
Hu, J.3
-
3
-
-
51149102325
-
Study on real-time dynamic operation of reservoir level in flood season based on short-term rainfall forecast information (in Chinese)
-
J. X. Yuan B. D. Wang F. X. Wang, et al. 2008 Study on real-time dynamic operation of reservoir level in flood season based on short-term rainfall forecast information (in Chinese) J Hydroelectr Eng 27 4 15 19
-
(2008)
J Hydroelectr Eng
, vol.27
, Issue.4
, pp. 15-19
-
-
Yuan, J.X.1
Wang, B.D.2
Wang, F.X.3
-
6
-
-
5144230715
-
New idea for controlling the limited elevation of reservoirs in the flood season (in Chinese)
-
R. T. Qiu B. D. Wang H. C. Zhou 2004 New idea for controlling the limited elevation of reservoirs in the flood season (in Chinese) Adv Water Sci 15 1 68 72
-
(2004)
Adv Water Sci
, vol.15
, Issue.1
, pp. 68-72
-
-
Qiu, R.T.1
Wang, B.D.2
Zhou, H.C.3
-
7
-
-
21144450722
-
Available approach to controlling dynamically the limited level of reservoirs during the flood season
-
B. Gao Y. X. Wu F. X. Shen, et al. 2005 Available approach to controlling dynamically the limited level of reservoirs during the flood season (in Chinese) Adv Water Sci 16 3 406 411 (Pubitemid 40881314)
-
(2005)
Shuikexue Jinzhan/Advances in Water Science
, vol.16
, Issue.3
, pp. 406-411
-
-
Gao, B.1
Wu, Y.-X.2
Shen, F.-X.3
Hu, S.-Y.4
-
8
-
-
33747041975
-
Study of combined flood control forecast operation manner and limited elevation in reservoir group (in Chinese)
-
H. C. Zhou S. H. Dong B. D. Wang, et al. 2006 Study of combined flood control forecast operation manner and limited elevation in reservoir group (in Chinese) J Dalian Univ Technol 46 3 401 406
-
(2006)
J Dalian Univ Technol
, vol.46
, Issue.3
, pp. 401-406
-
-
Zhou, H.C.1
Dong, S.H.2
Wang, B.D.3
-
9
-
-
43449129442
-
Sigh. Multiple duration limited water level and dynamic limited water level for flood control with implications on water supply
-
10.1016/j.jhydrol.2008.03.003
-
R. Yun P. Vijay 2008 Sigh. Multiple duration limited water level and dynamic limited water level for flood control with implications on water supply J Hydrol 354 160 170 10.1016/j.jhydrol.2008.03.003
-
(2008)
J Hydrol
, vol.354
, pp. 160-170
-
-
Yun, R.1
Vijay, P.2
-
10
-
-
77956191833
-
Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty
-
10.1016/j.jhydrol.2010.07.011
-
X. Li S. L. Guo P. Liu, et al. 2010 Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty J Hydrol 391 124 132 10.1016/j.jhydrol.2010.07.011
-
(2010)
J Hydrol
, vol.391
, pp. 124-132
-
-
Li, X.1
Guo, S.L.2
Liu, P.3
-
11
-
-
77955462838
-
-
Dalian University of Technology, Bureau of Rural HydropowerElectrification Development. China WaterPower Press Beijing
-
Dalian University of Technology, Bureau of Rural Hydropower and Electrification Development. Method and Application of Reservoir Flood Control Operation of Forecast Information. (in Chinese). Beijing: China WaterPower Press, 1996
-
(1996)
Method and Application of Reservoir Flood Control Operation of Forecast Information
-
-
-
12
-
-
77952764535
-
Research of flood control operation mode based on forecast information and risk analysis for Baiguishan Reservoir (in Chinese)
-
J. X. Yuan B. D. Wang L. Tian 2010 Research of flood control operation mode based on forecast information and risk analysis for Baiguishan Reservoir (in Chinese) J Hydroelectr Eng 29 2 132 138
-
(2010)
J Hydroelectr Eng
, vol.29
, Issue.2
, pp. 132-138
-
-
Yuan, J.X.1
Wang, B.D.2
Tian, L.3
-
13
-
-
33645793076
-
Risk analysis for flood control based on hydrological process (in Chinese)
-
H. C. Zhou S. H. Dong C. L. Deng, et al. 2006 Risk analysis for flood control based on hydrological process (in Chinese) J Hydraul Eng. 37 2 227 232
-
(2006)
J Hydraul Eng.
, vol.37
, Issue.2
, pp. 227-232
-
-
Zhou, H.C.1
Dong, S.H.2
Deng, C.L.3
-
14
-
-
67650512308
-
Risk analysis of reservoir operation with considering flood forecast error (in Chinese)
-
P. Feng X. G. Xu T. F. Wen, et al. 2009 Risk analysis of reservoir operation with considering flood forecast error (in Chinese) J Hydroelectr Eng 28 3 47 51
-
(2009)
J Hydroelectr Eng
, vol.28
, Issue.3
, pp. 47-51
-
-
Feng, P.1
Xu, X.G.2
Wen, T.F.3
-
15
-
-
69249094829
-
Risk analysis for reservoir flood forecast operation based on flood forecast information (in Chinese)
-
Q. Huang Z. Liu L. Yan Zh, et al. 2008 Risk analysis for reservoir flood forecast operation based on flood forecast information (in Chinese) J N&W Agric For Univ (Nat Sci Ed) 36 6 200 204
-
(2008)
J N&W Agric for Univ (Nat Sci Ed)
, vol.36
, Issue.6
, pp. 200-204
-
-
Huang, Q.1
Liu, Z.2
Yan Zh, L.3
-
16
-
-
0026614508
-
Risk-based parameter selection for short-term reservoir operation
-
10.1016/0022-1694(92)90222-H
-
S. Simonovic H. Venema D. Burn 1992 Risk-based parameter selection for short-term reservoir operation J Hydrol 131 269 291 10.1016/0022-1694(92)90222-H
-
(1992)
J Hydrol
, vol.131
, pp. 269-291
-
-
Simonovic, S.1
Venema, H.2
Burn, D.3
-
17
-
-
77955458639
-
Risk analysis of flood control operation mode with forecast information based on a combination of risk sources
-
10.1007/s11431-010-3124-3
-
Y. F. Diao B. D. Wang 2010 Risk analysis of flood control operation mode with forecast information based on a combination of risk sources Sci China Tech Sci 53 7 1949 1956 10.1007/s11431-010-3124-3
-
(2010)
Sci China Tech Sci
, vol.53
, Issue.7
, pp. 1949-1956
-
-
Diao, Y.F.1
Wang, B.D.2
-
19
-
-
34347227114
-
Study on distribution of flood forecasting errors by the method based on maximum entropy
-
Y. F. Diao B. D. Wang J. Liu 2007 Study on distribution of flood forecasting errors by the method based on maximum entropy (in Chinese) J Hydraul Eng 38 5 591 595 (Pubitemid 47007075)
-
(2007)
Shuili Xuebao/Journal of Hydraulic Engineering
, vol.38
, Issue.5
, pp. 591-595
-
-
Diao, Y.-F.1
Wang, B.-D.2
Liu, J.3
-
21
-
-
0015432901
-
Principle of maximum entropy in hydrologic frequency analysis
-
10.1016/0022-1694(72)90003-0
-
J. O. Sonuga 1972 Principle of maximum entropy in hydrologic frequency analysis J Hydrol 17 177 191 10.1016/0022-1694(72)90003-0
-
(1972)
J Hydrol
, vol.17
, pp. 177-191
-
-
Sonuga, J.O.1
|