Volumn 53, Issue 7, 2010, Pages 1949-1956

Risk analysis of flood control operation mode with forecast information based on a combination of risk sources

Author keywords

flood control operation mode with forecast information; Monte Carlo simulation; risk analysis

Indexed keywords

DELAY CONTROL SYSTEMS; FLOOD CONTROL; FLOODS; FORECASTING; MONTE CARLO METHODS; PROBABILITY DISTRIBUTIONS; RESERVOIRS (WATER); RISK ASSESSMENT; UNCERTAINTY ANALYSIS; WATER LEVELS;

EID: 77955458639     PISSN: 16747321     EISSN: 18691900     Source Type: Journal    
DOI: 10.1007/s11431-010-3124-3     Document Type: Article
Times cited : (41)

References (20)
  • 1
    • 77955462838 scopus 로고    scopus 로고
    • Dalian University of Technology, Bureau of Rural HydropowerElectrification Development. China Waterpower Press Beijing
    • Dalian University of Technology, Bureau of Rural Hydropower and Electrification Development. Method and Application of Reservoir Flood Control Operation of Forecast Information. Beijing: China Waterpower Press, 1996
    • (1996) Method and Application of Reservoir Flood Control Operation of Forecast Information
  • 2
    • 67649607833 scopus 로고    scopus 로고
    • Dam safety risk assessment with uncertainty analysis
    • Chauhan S, Bowles D. Dam safety risk assessment with uncertainty analysis. Ancold Bulletin, 2004. 73-88
    • (2004) Ancold Bulletin , pp. 73-88
    • Chauhan, S.1    Bowles, D.2
  • 3
    • 3543089886 scopus 로고    scopus 로고
    • Application of stochastic differential equations in risk assessment for flood releases
    • 10.1080/02626669809492131
    • S. Jiang 1998 Application of stochastic differential equations in risk assessment for flood releases Hydrolog Sci J 43 3 349 360 10.1080/ 02626669809492131
    • (1998) Hydrolog Sci J , vol.43 , Issue.3 , pp. 349-360
    • Jiang, S.1
  • 4
    • 34547138953 scopus 로고    scopus 로고
    • Risk analysis for dam overtopping-feitsui reservoir as a case study
    • 10.1061/(ASCE)0733-9429(2007)133:8(955)
    • J. Kuo B. Yen Y. Hsu, et al. 2007 Risk analysis for dam overtopping-feitsui reservoir as a case study J Hydraul Eng-Asce 133 955 963 10.1061/(ASCE)0733-9429(2007)133:8(955)
    • (2007) J Hydraul Eng-Asce , vol.133 , pp. 955-963
    • Kuo, J.1    Yen, B.2    Hsu, Y.3
  • 5
    • 33646246393 scopus 로고    scopus 로고
    • Improvement of overtopping risk evaluations using probabilistic concepts for existing dams
    • 10.1007/s00477-005-0017-2 2297437
    • H. Kwon Y. Moon 2006 Improvement of overtopping risk evaluations using probabilistic concepts for existing dams Stoch Environ Res Risk Assess 20 4 223 237 10.1007/s00477-005-0017-2 2297437
    • (2006) Stoch Environ Res Risk Assess , vol.20 , Issue.4 , pp. 223-237
    • Kwon, H.1    Moon, Y.2
  • 6
    • 67649834030 scopus 로고    scopus 로고
    • Evaluation model for service life of dam based on time-varying risk probability
    • 05648344 10.1007/s11431-009-0151-z
    • H. Su Z. Wen J. Hu, et al. 2009 Evaluation model for service life of dam based on time-varying risk probability Sci China Ser E-Tech Sci 52 7 1966 1973 05648344 10.1007/s11431-009-0151-z
    • (2009) Sci China ser E-Tech Sci , vol.52 , Issue.7 , pp. 1966-1973
    • Su, H.1    Wen, Z.2    Hu, J.3
  • 10
    • 77955448582 scopus 로고
    • Study on hydraulic uncertainty model
    • X. Y. Chu 1992 Study on hydraulic uncertainty model J Water Resour Eng 5 33 38
    • (1992) J Water Resour Eng , vol.5 , pp. 33-38
    • Chu, X.Y.1
  • 11
    • 77955457787 scopus 로고
    • Hydraulic uncertainties and their effects on risk analysis of levee or spillway systems
    • M. Jin 1991 Hydraulic uncertainties and their effects on risk analysis of levee or spillway systems J Hohai U 19 1 40 45
    • (1991) J Hohai U , vol.19 , Issue.1 , pp. 40-45
    • Jin, M.1
  • 12
    • 33746415101 scopus 로고    scopus 로고
    • Overall risk model of reservoir flood control
    • C. B. Xie H. Y. Yuan 1997 Overall risk model of reservoir flood control J Wuhan Univ Hydr & Elec Eng 30 2 71 74
    • (1997) J Wuhan Univ Hydr & Elec Eng , vol.30 , Issue.2 , pp. 71-74
    • Xie, C.B.1    Yuan, H.Y.2
  • 13
    • 0037004715 scopus 로고    scopus 로고
    • Risk analysis for flood prevention and safety of dam
    • Y. D. Mei G. M. Tan 2002 Risk analysis for flood prevention and safety of dam Eng J Wuhan Univ 35 6 11 15
    • (2002) Eng J Wuhan Univ , vol.35 , Issue.6 , pp. 11-15
    • Mei, Y.D.1    Tan, G.M.2
  • 14
    • 27744563394 scopus 로고    scopus 로고
    • Risk analysis on overtopping for operation management of reservoir
    • Y. Sun W. J. Huang 2005 Risk analysis on overtopping for operation management of reservoir J Water Resour Eng 36 10 1153 1157
    • (2005) J Water Resour Eng , vol.36 , Issue.10 , pp. 1153-1157
    • Sun, Y.1    Huang, W.J.2
  • 15
    • 0004105727 scopus 로고
    • Tianjin Science and Technology Press Tianjin
    • He Z X. Fuzzy Sets and Applications. Tianjin: Tianjin Science and Technology Press, 1983
    • (1983) Fuzzy Sets and Applications
    • He, Z.X.1
  • 16
    • 33747453440 scopus 로고    scopus 로고
    • Risk analysis on limited water level of reservoirs in flood season and flood control system in midstream and downstream of Yellow River
    • Z. N. Wu C. H. Hu B. Y. Wang, et al. 2006 Risk analysis on limited water level of reservoirs in flood season and flood control system in midstream and downstream of Yellow River J Water Resour Eng 37 6 641 648
    • (2006) J Water Resour Eng , vol.37 , Issue.6 , pp. 641-648
    • Wu, Z.N.1    Hu, C.H.2    Wang, B.Y.3
  • 17
    • 17644364004 scopus 로고    scopus 로고
    • Discussion on state-of-the-art of risk analysis in flood control system
    • 1032.15010
    • D. Wang Y. S. Zhu 2003 Discussion on state-of-the-art of risk analysis in flood control system Hydrology 23 2 15 20 1032.15010
    • (2003) Hydrology , vol.23 , Issue.2 , pp. 15-20
    • Wang, D.1    Zhu, Y.S.2
  • 18
    • 0018468345 scopus 로고
    • A comparison of three methods for selecting values of input variables in the analysis of output from a computer code
    • McKay M, Beckman R, Conover W. A comparison of three methods for selecting values of input variables in the analysis of output from a computer code. Technometrics, 1979(2): 239-245
    • (1979) Technometrics , Issue.2 , pp. 239-245
    • McKay, M.1    Beckman, R.2    Conover, W.3
  • 20
    • 77955433631 scopus 로고    scopus 로고
    • Henan prospecting and designing institute of water conservancy, Baiguishan reservoir administration of Henan province
    • Dalian University of Technology
    • Dalian University of Technology, Henan prospecting and designing institute of water conservancy, Baiguishan reservoir administration of Henan province. Report on the design and implementation of the limited water level of Baiguishan reservoir in Henan province, 2004
    • (2004) Report on the Design and Implementation of the Limited Water Level of Baiguishan Reservoir in Henan Province


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.