메뉴 건너뛰기




Volumn 17, Issue 1 PART 1, 2008, Pages

Complete modification rescheduling method and its application for steelmaking and continuous casting

Author keywords

Job and activity scheduling; Logistics in manufacturing; Procedures for process planning

Indexed keywords

COMPUTING ALGORITHMS; DELAYED PROCESSING; DYNAMIC SCHEDULING; HYBRID FLOW SHOP; JOB AND ACTIVITY SCHEDULING; MACHINE FAILURE; MULTIOBJECTIVE MODELS; OPTIMAL SCHEDULING; PRACTICAL PRODUCTION; PROCEDURES FOR PROCESS PLANNING; PRODUCTION PLANS; QUICK RESPONSE; RESCHEDULING PROBLEM; STEEL PLANT; THREE STAGES;

EID: 79961018886     PISSN: 14746670     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.3182/20080706-5-KR-1001.2705     Document Type: Conference Paper
Times cited : (6)

References (10)
  • 2
    • 33846601882 scopus 로고    scopus 로고
    • Scheduling a hybrid flowshop with batch production at the last stage
    • Hua Xuan, Lixin Tang (2007). Scheduling a hybrid flowshop with batch production at the last stage. Computer and Operation Research, 34, pp.2718-2733.
    • (2007) Computer and Operation Research , vol.34 , pp. 2718-2733
    • Xuan, H.1    Tang, L.2
  • 3
    • 0033892353 scopus 로고    scopus 로고
    • A Mathematical Programming Model for Scheduling Steelmaking Continuous Casting Production
    • Lixin Tang, Jiyin Liu, Aiying Rong (2000). A Mathematical Programming Model for Scheduling Steelmaking Continuous Casting Production. European Journal of Operational Research, 120, pp.423-C435.
    • (2000) European Journal of Operational Research , vol.120
    • Tang, L.1    Liu, J.2    Rong, A.3
  • 5
    • 0036604832 scopus 로고    scopus 로고
    • Using real time information for effective dynamic scheduling
    • DOI 10.1016/S0377-2217(01)00355-1, PII S0377221701003551
    • Peter Cowling, Marcus Johansson (2002). Using real time information for effective dynamic scheduling. European journal of operational research, 139, pp.230-244. (Pubitemid 34201236)
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.1    Johansson, M.2
  • 6
    • 0141919583 scopus 로고    scopus 로고
    • A multi-agent architecture for dynamic scheduling of steel hot rolling
    • Peter Cowling, Djamila Ouelhadj, Sanja Petrovic (2003). A multi-agent architecture for dynamic scheduling of steel hot rolling. Journal of intelligent manufacturing, 14, pp.457-470.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 457-470
    • Cowling, P.1    Ouelhadj, D.2    Petrovic, S.3
  • 9
    • 33745001447 scopus 로고    scopus 로고
    • Auction-based approach to resolve the scheduling problem in the steel making process
    • DOI 10.1080/00207540500434713, PII PX442140357
    • VIKAS KUMAR, SHASHI KUMAR, M.K.TIWARI, et al (2006). Aucton-based approach to resolve the scheduling problem in the steel making process. International journal of production research, 44, pp.1503-1522. (Pubitemid 43860519)
    • (2006) International Journal of Production Research , vol.44 , Issue.8 , pp. 1503-1522
    • Kumar, V.1    Kumar, S.2    Tiwari, M.K.3    Chan, F.T.S.4
  • 10
    • 70349397793 scopus 로고    scopus 로고
    • Steel-casting dynamic scheduling subsystem and its application
    • Xinfu Pang, Binlin Zheng, Tianyou Chai (2006). Steel-casting dynamic scheduling subsystem and its application. Metallurgical industry automation of china, 30, pp.8-12.
    • (2006) Metallurgical Industry Automation of China , vol.30 , pp. 8-12
    • Pang, X.1    Zheng, B.2    Chai, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.