-
1
-
-
0032597105
-
Layered supervisory control architecture for reconfigurable automation
-
Brian L. H and Chris R. E. (1999) Layered Supervisory Control Architecture for Reconfigurable Automation, Production Planning and Control, Vol. 10, No, 7, 659-670.
-
(1999)
Production Planning and Control
, vol.10
, Issue.7
, pp. 659-670
-
-
Brian, L.H.1
Chris, R.E.2
-
2
-
-
0029530111
-
Experimental investigation of the performance of a reconfigurable fixturing system
-
Bijan S and Yong T. (1995) Experimental Investigation of the Performance of a Reconfigurable Fixturing System, INT. J. ADV. MANUF. TECHNOL, 10:330-341.
-
(1995)
Int. J. Adv. Manuf. Technol
, vol.10
, pp. 330-341
-
-
Bijan, S.1
Yong, T.2
-
5
-
-
0025665871
-
A computer based production scheduling architecture suitable for driving a reconfigurable manufacturing system
-
Donald H. L and Brian L. H. (1990) A Computer Based Production Scheduling Architecture Suitable for Driving a Reconfigurable Manufacturing System, Computer IND. ENGNG, Vol. 19, Nos. 1-4, 1-5.
-
(1990)
Computer Ind. Engng
, vol.19
, Issue.1-4
, pp. 1-5
-
-
Donald, H.L.1
Brian, L.H.2
-
7
-
-
0033340198
-
Reconfigurable manufacturing systems
-
Koren Y. et al. (1999) Reconfigurable Manufacturing Systems, Annals of the CIRP, Vol. 48/2, 27-40.
-
(1999)
Annals of the CIRP
, vol.48
, Issue.2
, pp. 27-40
-
-
Koren, Y.1
-
8
-
-
0030682544
-
Reconfigurability consideration design of components and manufacturing systems
-
Lee G. H. (1997) Reconfigurability Consideration Design of Components and Manufacturing Systems, Int J Adv Manuf. Technol, 13:376-386.
-
(1997)
Int J Adv Manuf. Technol
, vol.13
, pp. 376-386
-
-
Lee, G.H.1
-
9
-
-
0031603119
-
Technology, competencies, and competitive ness: The case for reconfigurable and flexible strategies
-
Marilyn E. B and George P. (1998) Technology, Competencies, and Competitive ness: The Case for Reconfigurable and Flexible Strategies, Journal of Business Research, 41, 29-40.
-
(1998)
Journal of Business Research
, vol.41
, pp. 29-40
-
-
Marilyn, E.B.1
George, P.2
-
10
-
-
0033327837
-
A reconfigurable robot platform
-
Masahiro F. et al. (1999) A Reconfigurable Robot Platform, Robotics and Autonomous System, 29, 119-132.
-
(1999)
Robotics and Autonomous System
, vol.29
, pp. 119-132
-
-
Masahiro, F.1
-
11
-
-
0034250590
-
Reconfigurable manufacturing systems: Key to future manufacturing
-
Mehrabi M. G. (2000) Reconfigurable Manufacturing Systems: Key to Future Manufacturing, Journal of Intelligent Manufacturing, 2000, 11, 403-419.
-
(2000)
Journal of Intelligent Manufacturing, 2000
, vol.11
, pp. 403-419
-
-
Mehrabi, M.G.1
-
13
-
-
0033706894
-
1A generic event control framework for modular flexible manufacturing systems
-
1A Generic Event Control Framework for Modular Flexible Manufacturing Systems, Computers & Industrial Engineering, 38:107-123.
-
(2000)
Computers & Industrial Engineering
, vol.38
, pp. 107-123
-
-
Park, J.1
-
14
-
-
0033363101
-
Reconfigurable, component-based systems and the role of enterprise engineering concepts
-
Weston R. H. (1999) Reconfigurable, Component-based Systems and the Role of Enterprise Engineering Concepts, Computers in Industry, 40, 321-343.
-
(1999)
Computers in Industry
, vol.40
, pp. 321-343
-
-
Weston, R.H.1
-
15
-
-
0034631276
-
A stochastic model of reconfigurable manufacturing system part 1: A framework
-
Zhao X., Wang J and Lao Z. (2000) A Stochastic Model of Reconfigurable Manufacturing System Part 1: A Framework, INT. J. PROD. RES., VOL.38, NO. 10, 2273-2285.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.10
, pp. 2273-2285
-
-
Zhao, X.1
Wang, J.2
Lao, Z.3
-
16
-
-
0034664159
-
A stochastic model of reconfigurable manufacturing system part 2: Optimal configurations
-
Zhao X., Wang J and Lao Z. (2000) A Stochastic Model of Reconfigurable Manufacturing System Part 2: Optimal Configurations, INT. J. PROD. RES., VOL.38, NO. 12, 2829-2842.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.12
, pp. 2829-2842
-
-
Zhao, X.1
Wang, J.2
Lao, Z.3
|