-
2
-
-
0036466502
-
Dynamic process fault monitoring based on neural network and PCA
-
Chen, J. and C. Liao (2002). Dynamic process fault monitoring based on neural network and PCA. J. Process Control, 12, 277-289.
-
(2002)
J. Process Control
, vol.12
, pp. 277-289
-
-
Chen, J.1
Liao, C.2
-
3
-
-
0030269512
-
Identification of faulty sensors using principal component analysis
-
Dunia, R., S. Qin, T.F. Edgar and T.J. McAvoy (1996). Identification of faulty sensors using principal component analysis. AIChE Journal, 42, 2797-2812.
-
(1996)
AIChE Journal
, vol.42
, pp. 2797-2812
-
-
Dunia, R.1
Qin, S.2
Edgar, T.F.3
McAvoy, T.J.4
-
4
-
-
0028905904
-
Process analysis, monitoring and diagnosis, using multivariate projection methods
-
Kourti, T. and T.F. MacGregor (1995). Process analysis, monitoring and diagnosis, using multivariate projection methods. Chemometrics and Intelligent Laboratory Systems, 28, 3-21.
-
(1995)
Chemometrics and Intelligent Laboratory Systems
, vol.28
, pp. 3-21
-
-
Kourti, T.1
MacGregor, T.F.2
-
5
-
-
0026108818
-
Multivariate statistical monitoring of process operating performance
-
Kresta, J., J. MacGregor and T. Marlin (1991). Multivariate statistical monitoring of process operating performance. Canadian J. Chemical Engineering, 69, 35-47.
-
(1991)
Canadian J. Chemical Engineering
, vol.69
, pp. 35-47
-
-
Kresta, J.1
MacGregor, J.2
Marlin, T.3
-
6
-
-
18944388035
-
Frequency control on an island power system with increasing proportions of CCGTs
-
Bologna
-
Lalor, G. and M. O'Malley (2003). Frequency control on an island power system with increasing proportions of CCGTs, IEEE Powertech, Bologna.
-
(2003)
IEEE Powertech
-
-
Lalor, G.1
O'Malley, M.2
-
7
-
-
0034301495
-
Recursive PCA for adaptive process monitoring
-
Li, W., H.H. Yue, S. Valle-Cervantes and S.J. Qin (2000). Recursive PCA for adaptive process monitoring. J. Process Control, 10, 471-486.
-
(2000)
J. Process Control
, vol.10
, pp. 471-486
-
-
Li, W.1
Yue, H.H.2
Valle-Cervantes, S.3
Qin, S.J.4
-
8
-
-
79960702972
-
Integrated environment for power plant performance analysis and control design
-
Cancun, Mexico
-
Lu, S. and B.W. Hogg (1995). Integrated environment for power plant performance analysis and control design. IFAC Control of Power Plants and Power Systems, Cancun, Mexico, 37-42.
-
(1995)
IFAC Control of Power Plants and Power Systems
, pp. 37-42
-
-
Lu, S.1
Hogg, B.W.2
-
9
-
-
0029267381
-
Statistical process control of multivariate processes
-
MacGregor, J.F. and T. Kourti (1995). Statistical process control of multivariate processes. Control Engineering Practice, 3, 403-414.
-
(1995)
Control Engineering Practice
, vol.3
, pp. 403-414
-
-
MacGregor, J.F.1
Kourti, T.2
-
10
-
-
0028483476
-
Monitoring batch processes using multiway principal component analysis
-
Nomikos, P. and J.F. MacGregor (1994). Monitoring batch processes using multiway principal component analysis. AIChE Journal, 40, 1361-1375.
-
(1994)
AIChE Journal
, vol.40
, pp. 1361-1375
-
-
Nomikos, P.1
MacGregor, J.F.2
-
11
-
-
0031153341
-
Model-based learning for fault diagnosis in power transmission networks
-
Rayudu, R., S. Samarasinghe, D. Kulasiri and J. Ypsilantis (1997).'Model-based learning for fault diagnosis in power transmission networks', Engineering Intelligent Systems, 5, 63-73.
-
(1997)
Engineering Intelligent Systems
, vol.5
, pp. 63-73
-
-
Rayudu, R.1
Samarasinghe, S.2
Kulasiri, D.3
Ypsilantis, J.4
-
12
-
-
79960738564
-
Partial least squares for power plant performance monitoring
-
Seoul, Korea
-
Ritchie, J. and D. Flynn (2003). Partial least squares for power plant performance monitoring. IFAC Control of Power Plants and Power Systems, Seoul, Korea, 744-749.
-
(2003)
IFAC Control of Power Plants and Power Systems
, pp. 744-749
-
-
Ritchie, J.1
Flynn, D.2
-
13
-
-
0034661372
-
Knowledge discovery from process operational data for assessment and monitoring of operator's performance
-
Sebzalli, Y.M., R.F. Li, F.Z. Chen and X.Z. Wang (2000). Knowledge discovery from process operational data for assessment and monitoring of operator's performance. Computers and Chemical Engineering, 24, 409-414.
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 409-414
-
-
Sebzalli, Y.M.1
Li, R.F.2
Chen, F.Z.3
Wang, X.Z.4
-
14
-
-
0029322882
-
Reducing data dimensionality through optimizing neural network inputs
-
Tan, S. and L. Mavrovouniotis (1995). Reducing data dimensionality through optimizing neural network inputs, AIChE Journal, 41, 1471-1480.
-
(1995)
AIChE Journal
, vol.41
, pp. 1471-1480
-
-
Tan, S.1
Mavrovouniotis, L.2
-
15
-
-
84951601886
-
Cross-validatory estimation of the number of components in factor and principal components models
-
Wold, S. (1978). Cross-validatory estimation of the number of components in factor and principal components models. Technometrics, 20, 397-405.
-
(1978)
Technometrics
, vol.20
, pp. 397-405
-
-
Wold, S.1
-
16
-
-
1642475437
-
Integrated monitoring solution to start-up and run-time operations for continuous casting
-
Zhang, Y., M. Dudzic and V. Vaculik (2003). Integrated monitoring solution to start-up and run-time operations for continuous casting. Annual Rev. Control, 27, 141-149.
-
(2003)
Annual Rev. Control
, vol.27
, pp. 141-149
-
-
Zhang, Y.1
Dudzic, M.2
Vaculik, V.3
|