메뉴 건너뛰기




Volumn 8, Issue 2, 2011, Pages 230-250

Application of value stream mapping using simulation to decrease production lead time: A Malaysian manufacturing case

Author keywords

Lean manufacturing system; Simulation; Value stream mapping; VSM

Indexed keywords

LEAN PRODUCTION; MAPPING;

EID: 79960665817     PISSN: 17485037     EISSN: 17485045     Source Type: Journal    
DOI: 10.1504/IJISE.2011.041371     Document Type: Article
Times cited : (40)

References (28)
  • 1
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
    • DOI 10.1016/j.ijpe.2006.09.009, PII S0925527306002258, Building Core-Competence Through Operational Excellence
    • Abdulmalek, F.A. and Rajgopal, J. (2007) 'Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study', Int. J. Economics, Vol. 107, No. 1, pp.223-236. (Pubitemid 46241844)
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 2
    • 0038451291 scopus 로고    scopus 로고
    • Leaning the right way
    • Alavi, S. (2003) 'Leaning the right way', Manufacturing Engineer, Vol. 82, No. 3, pp.32-35.
    • (2003) Manufacturing Engineer , vol.82 , Issue.3 , pp. 32-35
    • Alavi, S.1
  • 3
    • 33746814817 scopus 로고    scopus 로고
    • A new value stream mapping approach for complex production systems
    • DOI 10.1080/00207540600690545, PII V80533272016Q178
    • Braglia, M., Carmignani, G. and Zammori, F. (2006) 'A new value stream mapping approach for complex production systems', Int. J. Production Research, Vol. 44, Nos. 18-19, pp.3929-3952. (Pubitemid 44181131)
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3929-3952
    • Braglia, M.1    Carmignani, G.2    Zammori, F.3
  • 5
    • 66149185213 scopus 로고    scopus 로고
    • From current state to future state: Mapping the steel to component supply chain
    • Brunt, D. (2000) 'From current state to future state: mapping the steel to component supply chain', Int. J. Logistics: Research and Applications, Vol. 3, No. 3, pp.259-271.
    • (2000) Int. J. Logistics: Research and Applications , vol.3 , Issue.3 , pp. 259-271
    • Brunt, D.1
  • 6
    • 61649128253 scopus 로고    scopus 로고
    • Agile manufacturing enablers for Finnish steel products network
    • Gore, A., Haapasalo, H. and Tahtinen, T. (2009) 'Agile manufacturing enablers for Finnish steel products network', Int. J. Industrial and Systems Engineering, Vol. 4, No. 3, pp.255-269.
    • (2009) Int. J. Industrial and Systems Engineering , vol.4 , Issue.3 , pp. 255-269
    • Gore, A.1    Haapasalo, H.2    Tahtinen, T.3
  • 8
    • 0032324907 scopus 로고    scopus 로고
    • Creating a lean supplier network: A distribution industry case
    • PII S096970129800015X
    • Hines, P., Rich, N. and Esain, A. (1998) 'Creating a lean supplier network: a distribution case', European Journal of Purchasing and Supply Management, Vol. 4, pp.235-246. (Pubitemid 128179858)
    • (1998) European Journal of Purchasing and Supply Management , vol.4 , Issue.4 , pp. 235-246
    • Hines, P.1    Rich, N.2    Esain, A.3
  • 12
    • 33750482244 scopus 로고    scopus 로고
    • A lean route to manufacturing survival
    • DOI 10.1108/01445150610705155
    • Lee-Mortimer, A. (2006) 'A lean route to manufacturing survival', Assembly Automation, Vol. 26, No. 4, pp.265-272. (Pubitemid 44650202)
    • (2006) Assembly Automation , vol.26 , Issue.4 , pp. 265-272
    • Lee-Mortimer, A.1
  • 14
    • 34249027911 scopus 로고    scopus 로고
    • Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
    • DOI 10.1080/00207540600791590, PII 778790434
    • Lian, Y-H. and Van Landeghem, H. (2007) 'Analysing the effects of lean manufacturing using a value stream mapping-based simulation generator', Int. J. Production Research, Vol. 45, No. 13, pp.3037-3058. (Pubitemid 46782039)
    • (2007) International Journal of Production Research , vol.45 , Issue.13 , pp. 3037-3058
    • Lian, Y.-H.1    Van Landeghem, H.2
  • 15
    • 33746857517 scopus 로고    scopus 로고
    • Utilizing simulation to enhance value stream mapping: A manufacturing case application
    • McDonald, T., Van Aken, E.M. and Rentes, A.F. (2002) 'Utilizing simulation to enhance value stream mapping: a manufacturing case application', Int. J. Logistics: Research and Applications, Vol. 5, No. 2, pp.213-232.
    • (2002) Int. J. Logistics: Research and Applications , vol.5 , Issue.2 , pp. 213-232
    • McDonald, T.1    Van Aken, E.M.2    Rentes, A.F.3
  • 16
  • 17
    • 84952955816 scopus 로고    scopus 로고
    • A review of literature on manufacturing systems productivity measurement and improvement
    • Muthiah, K.M.N. and Huang, S.H. (2006) 'A review of literature on manufacturing systems productivity measurement and improvement', Int. J. Industrial and Systems Engineering,Vol. 1, No. 4, pp.461-484.
    • (2006) Int. J. Industrial and Systems Engineering , vol.1 , Issue.4 , pp. 461-484
    • Muthiah, K.M.N.1    Huang, S.H.2
  • 20
    • 61649109796 scopus 로고    scopus 로고
    • Developing a value stream map to evaluate breakdown maintenance operations
    • Sawhney, R., Kannan, S. and Li, X. (2009) 'Developing a value stream map to evaluate breakdown maintenance operations', Int. J. Industrial and Systems Engineering, Vol. 4, No. 3, pp.229-240.
    • (2009) Int. J. Industrial and Systems Engineering , vol.4 , Issue.3 , pp. 229-240
    • Sawhney, R.1    Kannan, S.2    Li, X.3
  • 21
    • 46649112970 scopus 로고    scopus 로고
    • Evaluation of value stream mapping in manufacturing system redesign
    • Serrano, I., Ochoa, C. and De Castro, D. (2008) 'Evaluation of value stream mapping in manufacturing system redesign', Int. J. Production Research, Vol. 46, No. 16, pp.4409-4430.
    • (2008) Int. J. Production Research , vol.46 , Issue.16 , pp. 4409-4430
    • Serrano, I.1    Ochoa, C.2    De Castro, D.3
  • 22
    • 27844589388 scopus 로고    scopus 로고
    • Application of value stream mapping for lean operations and cycle time reduction: An Indian case study
    • DOI 10.1080/09537280512331325281
    • Seth, D. and Guptaj, V. (2005) 'Application of value stream mapping for lean operations and cycle time reduction: an Indian case study', Production Planning and Control, Vol. 16, No. 1, pp.44-59. (Pubitemid 41647053)
    • (2005) Production Planning and Control , vol.16 , Issue.1 , pp. 44-59
    • Seth, D.1    Gupta, V.2
  • 23
    • 43049145528 scopus 로고    scopus 로고
    • Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context
    • DOI 10.1108/17410380810869950, Special Issue on Emerging Issues in Management of Networked Manufacturing Enterprises
    • Seth, D., Seth, N. and Goel, D. (2008) 'Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context', Journal of Manufacturing Technology Management, Vol. 19, No. 4, pp.529-550. (Pubitemid 351630006)
    • (2008) Journal of Manufacturing Technology Management , vol.19 , Issue.4 , pp. 529-550
    • Seth, D.1    Seth, N.2    Goel, D.3
  • 24
    • 70350291357 scopus 로고    scopus 로고
    • Value stream mapping as a versatile tool for lean implementation: An Indian case study of a manufacturing firm
    • Singh, B. and Sharma, S.K. (2009) 'Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm', Measuring Business Excellence Journal, Vol. 13, No. 3, pp.58-68.
    • (2009) Measuring Business Excellence Journal , vol.13 , Issue.3 , pp. 58-68
    • Singh, B.1    Sharma, S.K.2
  • 25
    • 18844459872 scopus 로고    scopus 로고
    • Improving processes in a small health-care network: A value-mapping case study
    • DOI 10.1108/14637150510578755
    • Snyder, K.D., Paulson, P. and McGrath, P. (2005) 'Improving processes in a small health-care network. A value-mapping case study', Business Process Management Journal, Vol. 11, No. 1, pp.87-99. (Pubitemid 40688926)
    • (2005) Business Process Management Journal , vol.11 , Issue.1 , pp. 87-99
    • Snyder, K.D.1    Paulson, P.2    McGrath, P.3
  • 26
    • 0036609510 scopus 로고    scopus 로고
    • Equipment replacement decisions and lean manufacturing
    • DOI 10.1016/S0736-5845(02)00016-9, PII S0736584502000169
    • Sullivan, W.G., McDonald, T.N. and Van Aken, E.M. (2002) 'Equipment replacement decisions and lean manufacturing', Robotics and Computer Integrated Manufacturing, Vol. 18, No. 3, pp.255-265. (Pubitemid 34704284)
    • (2002) Robotics and Computer-Integrated Manufacturing , vol.18 , Issue.3-4 , pp. 255-265
    • Sullivan, W.G.1    McDonald, T.N.2    Van Aken, E.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.