-
1
-
-
0026142478
-
Redundancy optimization of k-out-n systems with common cause failures
-
Bai, D.S., Yun, W.Y. and Chung, S.W. (1991) 'Redundancy optimization of k-out-n systems with common cause failures', IEEE Transactions on Reliability, Vol. 40, No. 1, pp.56-59.
-
(1991)
IEEE Transactions on Reliability
, vol.40
, Issue.1
, pp. 56-59
-
-
Bai, D.S.1
Yun, W.Y.2
Chung, S.W.3
-
2
-
-
74149091835
-
A standby system with two repair persons under arbitrary life-and repair times
-
Bieth, B., Hong, L. and Sarkar, J. (2010) 'A standby system with two repair persons under arbitrary life-and repair times', Mathematical and Computing Modeling, Vol. 51, Nos. 5-6, pp.756-767.
-
(2010)
Mathematical and Computing Modeling
, vol.51
, Issue.5-6
, pp. 756-767
-
-
Bieth, B.1
Hong, L.2
Sarkar, J.3
-
3
-
-
0028256677
-
Reliability and availability analysis of warm standby systems in the presence of chance with multiple critical errors
-
DOI 10.1016/0026-2714(94)90485-5
-
Chung, W.K. (1994) 'Reliability and availability analysis of warm standby systems in the presence of chance with multiple critical errors', Microelectronics and Reliability, Vol. 34, No. 1, pp.153-155. (Pubitemid 124015483)
-
(1994)
Microelectronics Reliability
, vol.34
, Issue.1
, pp. 153-155
-
-
Chung, W.K.1
-
4
-
-
44349101059
-
Reliability importance analysis of Markovian systems at steady state using perturbation analysis
-
DOI: 10.1016/j.orl.2008.09.004
-
Do Van, P. and Barros, A. (2008) 'Reliability importance analysis of Markovian systems at steady state using perturbation analysis', Reliability Engineering and System Safety, Vol. 93, No. 11, pp.1605-1615, DOI: 10.1016/j.orl.2008.09.004.
-
(2008)
Reliability Engineering and System Safety
, vol.93
, Issue.11
, pp. 1605-1615
-
-
Van, D.P.1
Barros, A.2
-
5
-
-
0027541436
-
Reliability and MTTF evaluation of a two duplex-unit standby system with two types of repair
-
DOI 10.1016/0026-2714(93)90014-P
-
Gupta, P.P. and Sharma, M.K. (1993) 'Reliability and MTTF evaluation of a two duplex-unit standby system with two types of repair', Microelectronics on Reliability, Vol. 33, No. 3, pp.291-295. (Pubitemid 23640684)
-
(1993)
Microelectronics Reliability
, vol.33
, Issue.3
, pp. 291-295
-
-
Gupta, P.P.1
Sharma, M.K.2
-
6
-
-
0030701438
-
Cost-benefit analysis of two-unit standby system with post-repair, activation time and correlated failures and repairs
-
Gupta, R., Tyagi, V. and Tyagi, P.K. (1997) 'Cost-benefit analysis of two-unit standby system with post-repair, activation time and correlated failures and repairs', Journal of Quality and Maintenance Engineering, Vol. 3, No. 1, pp.55-63.
-
(1997)
Journal of Quality and Maintenance Engineering
, vol.3
, Issue.1
, pp. 55-63
-
-
Gupta, R.1
Tyagi, V.2
Tyagi, P.K.3
-
7
-
-
77950900585
-
Cost analysis of a system involving common-cause failures and preventive maintenance
-
Haggag, M.Y. (2009) 'Cost analysis of a system involving common-cause failures and preventive maintenance', Journal of Mathematics and Statistics, Vol. 5, No. 4, pp.305-310.
-
(2009)
Journal of Mathematics and Statistics
, vol.5
, Issue.4
, pp. 305-310
-
-
Haggag, M.Y.1
-
8
-
-
59249106392
-
Multiple components series systems with imperfect repair
-
DOI: 10.1504/IJOR.2009.022596
-
Hajeeh, M. and Faten, J. (2009) 'Multiple components series systems with imperfect repair', Int. J. Operational Research, Vol. 4, No. 2, pp.125-141, DOI: 10.1504/IJOR.2009.022596.
-
(2009)
Int J. Operational Research
, vol.4
, Issue.2
, pp. 125-141
-
-
Hajeeh, M.1
Faten, J.2
-
9
-
-
57349152202
-
Optimal policy for bulk queue with multiple types of server breakdown
-
DOI: 10.1504/IJOR. 2009.021617
-
Jain, M. and Agrawal, P.K. (2009) 'Optimal policy for bulk queue with multiple types of server breakdown', Int. J. Operational Research, Vol. 4, No. 1, pp.35-54, DOI: 10.1504/IJOR. 2009.021617.
-
(2009)
Int J. Operational Research
, vol.4
, Issue.1
, pp. 35-54
-
-
Jain, M.1
Agrawal, P.K.2
-
10
-
-
67349235286
-
Optimizing replacement policy for a cold-standby system with waiting repair times
-
DOI: 10.1016/j.amc.2009.03.064
-
Jia, J. and Wu, S. (2009) 'Optimizing replacement policy for a cold-standby system with waiting repair times', Applied Mathematics and Computation, Vol. 214, No. 1, pp.133-141, DOI: 10.1016/j.amc.2009.03.064.
-
(2009)
Applied Mathematics and Computation
, vol.214
, Issue.1
, pp. 133-141
-
-
Jia, J.1
Wu, S.2
-
11
-
-
53349091918
-
Reliability-based measure for a system with standbys subjected to switching failures
-
DOI: 10.1108/02644400810899979
-
Ke, J-B., Lee, W-C. and Ke, J-C. (2008) 'Reliability-based measure for a system with standbys subjected to switching failures', Engineering Computations, Vol. 25, No. 7, pp.694-706, DOI: 10.1108/02644400810899979.
-
(2008)
Engineering Computations
, vol.25
, Issue.7
, pp. 694-706
-
-
Ke, J.-B.1
Lee, W.-C.2
Ke, J.-C.3
-
12
-
-
34247631639
-
Comparative analysis of availability for a redundant repairable system
-
DOI 10.1016/j.amc.2006.09.123, PII S0096300306013567
-
Ke, J-C. and Chu, Y-K. (2007) 'Comparative analysis of availability for redundant repairable system', Applied Mathematics and Computation, Vol. 188, No. 1, pp.332-338, DOI: 10.1016/ j.amc.2006.09.123. (Pubitemid 46686727)
-
(2007)
Applied Mathematics and Computation
, vol.188
, Issue.1
, pp. 332-338
-
-
Ke, J.-C.1
Chu, Y.-K.2
-
13
-
-
74449085047
-
Simulation inferences for an availability system with general repair distribution and imperfect fault coverage
-
DOI: 10.1016/j.simpat.2009.12.001
-
Ke, J-C., Su, Z-L. and Wang, K-H. (2010) 'Simulation inferences for an availability system with general repair distribution and imperfect fault coverage', Simulation Modeling Practice and Theory, Vol. 18, No. 3, pp.338-347, DOI: 10.1016/j.simpat.2009.12.001.
-
(2010)
Simulation Modeling Practice and Theory
, vol.18
, Issue.3
, pp. 338-347
-
-
Ke, J.-C.1
Su, Z.-L.2
Wang, K.-H.3
-
14
-
-
65349193910
-
Analysis of an M/M/N queue with Bernoulli service schedule
-
DOI: 10.1504/IJOR.2009. 024529
-
Kumar, B.K. and Madheswari, S.P. (2009) 'Analysis of an M/M/N queue with Bernoulli service schedule', Int. J. Operational Research, Vol. 5, No. 1, pp.48-72, DOI: 10.1504/IJOR.2009. 024529.
-
(2009)
Int J. Operational Research
, vol.5
, Issue.1
, pp. 48-72
-
-
Kumar, B.K.1
Madheswari, S.P.2
-
15
-
-
0022136521
-
Graph theory concepts in frequency and availability analysis
-
Kumar, S.R. and Billinton, R. (1985) 'Graph theory concepts in frequency and availability analysis', IEEE Transactions on Reliability, Vol. 34, No. 4, pp.290-294. (Pubitemid 16508951)
-
(1985)
IEEE Transactions on Reliability
, vol.R-34
, Issue.4
, pp. 290-294
-
-
Kumar Sudhir1
Billinton Roy2
-
16
-
-
67650757771
-
Reliability and cost analysis of electricity collection systems of a marine current farm
-
Lee, M.Q., Lu, C.N. and Huang, H.S. (2009) 'Reliability and cost analysis of electricity collection systems of a marine current farm', Renewable and Sustainable Energy, Vol. 13, No. 8, pp.2012-2021.
-
(2009)
Renewable and Sustainable Energy
, vol.13
, Issue.8
, pp. 2012-2021
-
-
Lee, M.Q.1
Lu, C.N.2
Huang, H.S.3
-
17
-
-
0035720641
-
Incorporating common-cause failures into nonrepairable multistate series-parallel system analysis
-
DOI 10.1109/24.983398, PII S0018952901113539
-
Levitin, G. (2001) 'Incorporating common cause failures into non-repairable multistate seriesparallel system analysis', IEEE Transaction on Reliability, Vol. 50, No 4, pp.380-388. (Pubitemid 34191856)
-
(2001)
IEEE Transactions on Reliability
, vol.50
, Issue.4
, pp. 380-388
-
-
Levitin, G.1
-
18
-
-
58049102812
-
Evaluating a warm standby system with components having proportional hazard rates
-
Li, X., Yan, R. and Zuo, M.J. (2009) 'Evaluating a warm standby system with components having proportional hazard rates', Operations Research Letters, Vol. 37, No. 1, pp.56-60.
-
(2009)
Operations Research Letters
, vol.37
, Issue.1
, pp. 56-60
-
-
Li, X.1
Yan, R.2
Zuo, M.J.3
-
19
-
-
0029342894
-
Comparing the MTBF of four systems with standby components
-
Meng, F.C. (1995) 'Comparing the MTBF of four systems with standby components', Microelectronics and Reliability, Vol. 35, pp.1031-1035.
-
(1995)
Microelectronics and Reliability
, vol.35
, pp. 1031-1035
-
-
Meng, F.C.1
-
20
-
-
79960665530
-
Stochastic behavior of redundant complex system with two types of failure
-
Mokaddis, G.S., El-Sherbeny, M.S. and Al-Esayeh, E. (2009) 'Stochastic behavior of redundant complex system with two types of failure', Journal of Mathematics and Statistics, Vol. 5, No. 2, pp.112-117.
-
(2009)
Journal of Mathematics and Statistics
, vol.5
, Issue.2
, pp. 112-117
-
-
Mokaddis, G.S.1
El-Sherbeny, M.S.2
Al-Esayeh, E.3
-
21
-
-
41249087549
-
Tabu search for the redundancy allocation problem of homogenous series-parallel multi-state systems
-
DOI 10.1016/j.ress.2007.06.004, PII S0951832007001639
-
Ouzineb, M., Nourelfath, M. and Gendreau, M. (2008) 'Tabu search for the redundancy allocation problem of homogenous series-parallel multi-state systems', Reliability Engineering and System Safety, Vol. 93, pp.1257-1272. (Pubitemid 351444813)
-
(2008)
Reliability Engineering and System Safety
, vol.93
, Issue.8
, pp. 1257-1272
-
-
Ouzineb, M.1
Nourelfath, M.2
Gendreau, M.3
-
22
-
-
70349453779
-
Reliability analysis of a two-unit general parallel system with (n-2) warm standbys
-
DOI:10.1016/j.ejor.2009.04.016
-
Papageorgiou, E. and Kokolakis, G.. (2010) 'Reliability analysis of a two-unit general parallel system with (n-2) warm standbys', European Journal of Operational Research, Vol. 201, No. 3, pp.821-827, DOI:10.1016/j.ejor.2009.04. 016.
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.3
, pp. 821-827
-
-
Papageorgiou, E.1
Kokolakis, G.2
-
23
-
-
0033149977
-
Reliability study of two engineering models using LU decomposition
-
Qamber, I.S. (1999) 'Reliability study of two engineering models using LU decomposition', Reliability Engineering and System Safety, Vol. 64, No. 3, pp.359-364.
-
(1999)
Reliability Engineering and System Safety
, vol.64
, Issue.3
, pp. 359-364
-
-
Qamber, I.S.1
-
24
-
-
34250348131
-
Optimization of system reliability in the presence of common cause failures
-
DOI 10.1016/j.ress.2006.09.004, PII S0951832006001992
-
Ramirez-Marquez, J.E. and Coit, D.W. (2007) 'Optimization of system reliability in the presence of common cause failures', Reliability Engineering and System Safety, Vol. 92, pp.1421-1434. (Pubitemid 46915558)
-
(2007)
Reliability Engineering and System Safety
, vol.92
, Issue.10
, pp. 1421-1434
-
-
Ramirez-Marquez, J.E.1
Coit, D.W.2
-
25
-
-
0024878188
-
Economic analysis of the M/M/R machine repair problem with warm standbys
-
Sivazlian, D.D. and Wang, K-H. (1989) 'Economic analysis of the M/M/R machine repair problem with warm standbys', Microelectronics and Reliability, Vol. 29, pp.25-35.
-
(1989)
Microelectronics and Reliability
, vol.29
, pp. 25-35
-
-
Sivazlian, D.D.1
Wang, K.-H.2
-
26
-
-
33646578762
-
Reliability analysis of a three unit warm standby redundant system with repair
-
DOI 10.1007/s10479-006-7384-z
-
Srinivasan, S. and Subramanian, R. (2006) 'Reliability analysis of a three warm standby redundant system with repair', Annals of Operations Research, Vol. 143, No. 1, pp.227-235, DOI: 10.1007/s10479-006-7384-z. (Pubitemid 43724005)
-
(2006)
Annals of Operations Research
, vol.143
, Issue.1
, pp. 227-235
-
-
Srinivasan, S.K.1
Subramanian, R.2
-
27
-
-
77950460818
-
Unreliable M/G/1 retrial queue with geometric loss and random reserved time
-
DOI: 10.1504/IJOR.2010.030802
-
Taleb, S., Saggou, H. and Aissani, A. (2010) 'Unreliable M/G/1 retrial queue with geometric loss and random reserved time', Int. J. Operational Research, Vol. 7, No. 2, pp.171-191, DOI: 10.1504/IJOR.2010.030802.
-
(2010)
Int J. Operational Research
, vol.7
, Issue.2
, pp. 171-191
-
-
Taleb, S.1
Saggou, H.2
Aissani, A.3
|