-
1
-
-
0003422572
-
-
John Wiley & Sons, Inc.
-
Blischke R.W., and Murthy D.N.P. Reliability: Modeling, Prediction, and Optimization (2000), John Wiley & Sons, Inc.
-
(2000)
Reliability: Modeling, Prediction, and Optimization
-
-
Blischke, R.W.1
Murthy, D.N.P.2
-
3
-
-
0016510265
-
Probabilistic analysis of a single server n-unit system with (n - 1) warm standbys
-
Gopalan M.N. Probabilistic analysis of a single server n-unit system with (n - 1) warm standbys. Operations Research 23 (1975) 591-595
-
(1975)
Operations Research
, vol.23
, pp. 591-595
-
-
Gopalan, M.N.1
-
5
-
-
0024736085
-
Profit analysis of two unit priority standby system with administrative delay in repair
-
Gupta R., and Goel L.R. Profit analysis of two unit priority standby system with administrative delay in repair. International Journal of Systems Science 20 (1989) 1703-1712
-
(1989)
International Journal of Systems Science
, vol.20
, pp. 1703-1712
-
-
Gupta, R.1
Goel, L.R.2
-
6
-
-
0025464889
-
Cost benefit analysis of a two-unit parallel standby system with administrative delay in repair
-
Gupta R., and Goel L.R. Cost benefit analysis of a two-unit parallel standby system with administrative delay in repair. International Journal of Systems Science 21 (1990) 1369-1379
-
(1990)
International Journal of Systems Science
, vol.21
, pp. 1369-1379
-
-
Gupta, R.1
Goel, L.R.2
-
7
-
-
0027037908
-
A two-unit priority system subject to random shocks and Rayleigh failure time distributions
-
Gupta R., and Chaudhary A. A two-unit priority system subject to random shocks and Rayleigh failure time distributions. Microelectronics and Reliability 32 (1992) 1713-1723
-
(1992)
Microelectronics and Reliability
, vol.32
, pp. 1713-1723
-
-
Gupta, R.1
Chaudhary, A.2
-
8
-
-
1642292632
-
On the profit comparison of two stochastic models each pertaining to a two-unit standby system with fixed preparation time and hyperexponential repair time distributions
-
Gupta R., and Kishan R. On the profit comparison of two stochastic models each pertaining to a two-unit standby system with fixed preparation time and hyperexponential repair time distributions. International Journal of Systems Science 30 12 (1999) 1309-1317
-
(1999)
International Journal of Systems Science
, vol.30
, Issue.12
, pp. 1309-1317
-
-
Gupta, R.1
Kishan, R.2
-
9
-
-
0020765584
-
Quasi-stationary distribution of a two-unit warm-standby redundant system
-
Kalpakam S., and Hameed S.M.A. Quasi-stationary distribution of a two-unit warm-standby redundant system. Journal of Applied Probability 20 2 (1983) 429-435
-
(1983)
Journal of Applied Probability
, vol.20
, Issue.2
, pp. 429-435
-
-
Kalpakam, S.1
Hameed, S.M.A.2
-
10
-
-
0036864224
-
The reliability analysis of balking and reneging in a repairable system with warm standbys
-
Ke J.-C., and Wang K.-H. The reliability analysis of balking and reneging in a repairable system with warm standbys. Quality and Reliability Engineering International 18 (2002) 467-478
-
(2002)
Quality and Reliability Engineering International
, vol.18
, pp. 467-478
-
-
Ke, J.-C.1
Wang, K.-H.2
-
11
-
-
34247537964
-
A geometric process maintenance model with preventive repair
-
Lam Y. A geometric process maintenance model with preventive repair. European Journal of Operational Research 182 (2007) 806-819
-
(2007)
European Journal of Operational Research
, vol.182
, pp. 806-819
-
-
Lam, Y.1
-
13
-
-
0021128201
-
Comparison of two unit cold standby reliability models with three types of repair facilities
-
Murari K., and Goel V. Comparison of two unit cold standby reliability models with three types of repair facilities. Microelectronics and Reliability 24 (1984) 35-39
-
(1984)
Microelectronics and Reliability
, vol.24
, pp. 35-39
-
-
Murari, K.1
Goel, V.2
-
14
-
-
1642299839
-
A two unit parallel system supported by (n - 2) standbys with general and non-identical lifetimes
-
Papageorgiou E., and Kokolakis G. A two unit parallel system supported by (n - 2) standbys with general and non-identical lifetimes. International Journal of Systems Science 35 1 (2004) 1-12
-
(2004)
International Journal of Systems Science
, vol.35
, Issue.1
, pp. 1-12
-
-
Papageorgiou, E.1
Kokolakis, G.2
-
15
-
-
33749542575
-
A two unit general parallel system with (n - 2) cold standbys - Analytic and simulation approach
-
Papageorgiou E., and Kokolakis G. A two unit general parallel system with (n - 2) cold standbys - Analytic and simulation approach. European Journal of Operational Research 176 (2007) 1016-1032
-
(2007)
European Journal of Operational Research
, vol.176
, pp. 1016-1032
-
-
Papageorgiou, E.1
Kokolakis, G.2
-
16
-
-
33646578762
-
Reliability analysis of a three unit warm standby redundant system with repair
-
Srinivasan S.K., and Subramanian R. Reliability analysis of a three unit warm standby redundant system with repair. Annals of Operations Research 143 (2006) 227-235
-
(2006)
Annals of Operations Research
, vol.143
, pp. 227-235
-
-
Srinivasan, S.K.1
Subramanian, R.2
-
17
-
-
70349465873
-
Reliability and sensitivity analysis of a system with warm standbys and a repairable service station
-
Wang K.-H., Lai Y.-J., and Ke J.-B. Reliability and sensitivity analysis of a system with warm standbys and a repairable service station. International Journal of Operations Research 1 1 (2004) 61-70
-
(2004)
International Journal of Operations Research
, vol.1
, Issue.1
, pp. 61-70
-
-
Wang, K.-H.1
Lai, Y.-J.2
Ke, J.-B.3
-
18
-
-
34249071322
-
A deteriorating cold standby repairable system with priority in use
-
Zhang Y.-L., and Wang G.-J. A deteriorating cold standby repairable system with priority in use. European Journal of Operational Research 183 (2007) 278-295
-
(2007)
European Journal of Operational Research
, vol.183
, pp. 278-295
-
-
Zhang, Y.-L.1
Wang, G.-J.2
|