-
3
-
-
79959943561
-
-
and Washington D.C., March 17-18.
-
Kavicky J. Portante E. Folga S. Fisher R. Workshop on Grand Challenges in Modeling, Simulation, and Analysis for Homeland Security 2010, and Washington D.C., March 17-18.
-
(2010)
Workshop on Grand Challenges in Modeling, Simulation, and Analysis for Homeland Security
-
-
Kavicky, J.1
Portante, E.2
Folga, S.3
Fisher, R.4
-
7
-
-
79959975801
-
-
North American Electric Reliability Council, Reliability Assessment 2001-2011: The Reliability of Bulk Electric Systems in North America.
-
2002, North American Electric Reliability Council, Reliability Assessment 2001-2011: The Reliability of Bulk Electric Systems in North America.
-
(2002)
-
-
-
11
-
-
0842309857
-
Natural gas and electricity optimal power flow
-
An S. Li Q. Gedra T.W. Natural gas and electricity optimal power flow. Proceedings of IEEE/PES Transmission and Distribution Conference and Exposition, Dallas, Texas, September, 2003 1:7. and in Vol. p.
-
Proceedings of IEEE/PES Transmission and Distribution Conference and Exposition, Dallas, Texas, September, 2003
, vol.1
, pp. 7
-
-
An, S.1
Li, Q.2
Gedra, T.W.3
-
12
-
-
77957374827
-
Application of augmented Lagrangian relaxation to coordinated scheduling of interdependent hydrothermal power and natural gas systems
-
10.1049/iet-gtd.2010.0151
-
Liu C. Shahidehpour M. Wang J. Application of augmented Lagrangian relaxation to coordinated scheduling of interdependent hydrothermal power and natural gas systems. IET Gener. Transm. Distrib. 2010, 4:1314. 10.1049/iet-gtd.2010.0151.
-
(2010)
IET Gener. Transm. Distrib.
, vol.4
, pp. 1314
-
-
Liu, C.1
Shahidehpour, M.2
Wang, J.3
-
15
-
-
0013029738
-
-
(Wiley, New York, NY, ).
-
Shahidehpour M. Yamin H. Li Z. Market Operations in Electric Power Systems 2002, and (Wiley, New York, NY, ).
-
(2002)
Market Operations in Electric Power Systems
-
-
Shahidehpour, M.1
Yamin, H.2
Li, Z.3
-
22
-
-
84973468442
-
Different transient models-Limitations, advantages, and disadvantages
-
in , San Francisco, CA, USA, Oct.23-25,.
-
Osiadacz A.J. Different transient models-Limitations, advantages, and disadvantages. Proceedings of the PSIG, 28th Annual Meeting 1996, in San Francisco, CA, USA, Oct.23-25,.
-
(1996)
Proceedings of the PSIG, 28th Annual Meeting
-
-
Osiadacz, A.J.1
-
23
-
-
0034073292
-
-
10.1016/S1385-8947(99)00122-9
-
Ke S.L. Ti H.C. Chem. Eng. J. 2000, 76:169. 10.1016/S1385-8947(99)00122-9, and.
-
(2000)
Chem. Eng. J.
, vol.76
, pp. 169
-
-
Ke, S.L.1
Ti, H.C.2
-
27
-
-
79960029467
-
-
ISO New England, CIGRE 2008 Case Study: Electric and Natural Gas Market Interdependencies within New England .
-
2008, ISO New England, CIGRE 2008 Case Study: Electric and Natural Gas Market Interdependencies within New England.
-
(2008)
-
-
-
31
-
-
0347739119
-
-
10.1287/mnsc.46.11.1454.12087
-
Wolf D. Smeers Y. Manage. Sci. 2000, 46:1454. 10.1287/mnsc.46.11.1454.12087, and.
-
(2000)
Manage. Sci.
, vol.46
, pp. 1454
-
-
Wolf, D.1
Smeers, Y.2
|