메뉴 건너뛰기




Volumn 17, Issue 4, 2011, Pages 236-246

Proposal and evaluation of a KBE-RM selection system

Author keywords

Knowledge engineering; Manufacturing systems; Rapid prototypes

Indexed keywords

ALTERNATIVE PROCESS; ARTIFICIAL INTELLIGENCE TOOLS; COST ESTIMATIONS; DESIGN SPECIFICATION; DESIGN/METHODOLOGY/APPROACH; EQUIPMENT DESIGN; KNOWLEDGE-BASED ENGINEERING; LOGICAL PLANNING; LOW-VOLUME PRODUCTION; MACHINERY DESIGN; MANUFACTURING SYSTEM; MATERIALS SELECTION; MECHANICAL PARTS; MODULAR DESIGNS; PARAMETRIC METHOD; PART COST; PROCESS SELECTION; PRODUCT COSTING; RAPID PROTOTYPE; RELATIONAL DATABASE; SELECTION SYSTEMS;

EID: 79959626535     PISSN: 13552546     EISSN: None     Source Type: Journal    
DOI: 10.1108/13552541111138351     Document Type: Article
Times cited : (20)

References (25)
  • 1
    • 54949126413 scopus 로고    scopus 로고
    • Spanish Rapid Manufacturing Association
    • available at:, (accessed December 2009)
    • ASERM (2006), “Spanish Rapid Manufacturing Association”, available at: www.aserm.net (accessed December 2009).
    • (2006)
  • 2
    • 27844584763 scopus 로고    scopus 로고
    • Knowledge-based system for the choice of rapid prototyping process
    • August
    • Bernard, A. (1999), “Knowledge-based system for the choice of rapid prototyping process”, Solid Freeform Fabrication Proceedings, August, pp. 39-45.
    • (1999) Solid Freeform Fabrication Proceedings , pp. 39-45
    • Bernard, A.1
  • 4
    • 0032598807 scopus 로고    scopus 로고
    • Development of a rapid prototyping design advice system
    • Bibb, R., Taha, Z., Brown, R. and Wright, D. (1999), “Development of a rapid prototyping design advice system”, Journal of Intelligent Manufacturing, Vol. 10 Nos 3-4, pp. 331-9.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , Issue.3-4 , pp. 331-339
    • Bibb, R.1    Taha, Z.2    Brown, R.3    Wright, D.4
  • 5
    • 0030212970 scopus 로고    scopus 로고
    • Creating a database of rapid prototyping system capabilities
    • Campbell, R.I. and Bernie, M.R.N. (1996), “Creating a database of rapid prototyping system capabilities”, Journal of Materials Processing Technology, Vol. 61 Nos 1-2, pp. 163-7.
    • (1996) Journal of Materials Processing Technology , vol.61 , Issue.1-2 , pp. 163-167
    • Campbell, R.I.1    Bernie, M.R.N.2
  • 7
    • 84992953125 scopus 로고    scopus 로고
    • Estudio de prospectiva sobre bienes de equipo para la fabricación de piezas unitarias
    • 2015. F. OPTI
    • García-Berro, M. (2001), Estudio de prospectiva sobre bienes de equipo para la fabricación de piezas unitarias. 2015. F. OPTI.
    • (2001)
    • García-Berro, M.1
  • 8
    • 54949083095 scopus 로고    scopus 로고
    • RP selector
    • Helsinki University of Technology (2002), “RP selector”, available at: www.ltk.hut.fi/RP-Selector.
    • (2002)
  • 10
    • 54949083909 scopus 로고    scopus 로고
    • RP selector
    • Ivf Sweden (2005), “RP selector”, available at: http://extra.ivf.se/rp-selector/Demo-selector/index.htm.
    • (2005)
  • 11
    • 0033717643 scopus 로고    scopus 로고
    • Selection and evaluation of rapid tooling process chain with protocol
    • Kaschka, U. and Auerbach, P. (2000), “Selection and evaluation of rapid tooling process chain with protocol”, Rapid Prototyping Journal, Vol. 6 No. 1, pp. 60-5.
    • (2000) Rapid Prototyping Journal , vol.6 , Issue.1 , pp. 60-65
    • Kaschka, U.1    Auerbach, P.2
  • 13
    • 0036609438 scopus 로고    scopus 로고
    • A rule based expert system for rapid prototyping system selection
    • Masood, S.H. and Soo, A. (2002), “A rule based expert system for rapid prototyping system selection”, Robotics and Computer-Integrated Manufacturing, Vol. 18, p. 267.
    • (2002) Robotics and Computer-Integrated Manufacturing , vol.18 , pp. 267
    • Masood, S.H.1    Soo, A.2
  • 17
    • 44349163362 scopus 로고    scopus 로고
    • Pursuing successful rapid manufacturing: a users' best-practices approach
    • Munguia, J., de Ciurana, J.J. and Riba Romeva, C. (2008), “Pursuing successful rapid manufacturing: a users' best-practices approach”, Rapid Prototyping Journal, Vol. 14 No. 3, pp. 173-9.
    • (2008) Rapid Prototyping Journal , vol.14 , Issue.3 , pp. 173-179
    • Munguia, J.1    de Ciurana, J.J.2    Riba Romeva, C.3
  • 18
    • 79959574805 scopus 로고    scopus 로고
    • Observatorio de Prospectiva Tecnológica Industrial
    • OPTI, F. (2008), “Observatorio de Prospectiva Tecnológica Industrial”, available at: www.opti.org/index/publicaciones.asp.
    • (2008)
    • OPTI, F.1
  • 19
    • 79959577871 scopus 로고    scopus 로고
    • El sector de bienes de equipo en 2006
    • Panero, J. (2007), “El sector de bienes de equipo en 2006”, Boletín ICE económico N 2922, available at: www.revistasice.com/RevistasICE/portadahtm?in=0.
    • (2007) Boletín ICE económico N 2922
    • Panero, J.1
  • 21
    • 34247111346 scopus 로고    scopus 로고
    • Cost estimation for rapid manufacturing – laser sintering production for low to medium volumes
    • Ruffo, M., Tuck, C. and Hague, R.J.M. (2006), “Cost estimation for rapid manufacturing – laser sintering production for low to medium volumes”, Proceedings IMECHE Part B – Journal of Engineering Manufacture, Vol. 220 No. 9, pp. 1417-27.
    • (2006) Proceedings IMECHE Part B – Journal of Engineering Manufacture , vol.220 , Issue.9 , pp. 1417-1427
    • Ruffo, M.1    Tuck, C.2    Hague, R.J.M.3
  • 23
    • 0036002218 scopus 로고    scopus 로고
    • The IRIS rapid prototyping system selector for educational and manufacturing users
    • Masood, S.H. and Al-Alawi, M. (2002), “The IRIS rapid prototyping system selector for educational and manufacturing users”, International Journal of Engineering Education, Vol. 18 No. 1, pp. 66-77.
    • (2002) International Journal of Engineering Education , vol.18 , Issue.1 , pp. 66-77
    • Masood, S.H.1    Al-Alawi, M.2
  • 25
    • 38149094357 scopus 로고    scopus 로고
    • Cost estimation for rapid manufacturing – simultaneous production components using laser of mixed sintering
    • Ruffo, M. and Hague, R. (2007), “Cost estimation for rapid manufacturing – simultaneous production components using laser of mixed sintering”, Proceedings IMECHE Part B – Journal of Engineering Manufacture, Vol. 221 No. 11, pp. 1585-91.
    • (2007) Proceedings IMECHE Part B – Journal of Engineering Manufacture , vol.221 , Issue.11 , pp. 1585-1591
    • Ruffo, M.1    Hague, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.