메뉴 건너뛰기




Volumn 133, Issue 1, 2011, Pages 439-450

An iterative approach to item-level tactical production and inventory planning

Author keywords

Hierarchical planning; Inventory; Production; Supply chain management

Indexed keywords

HIERARCHICAL PLANNING; INVENTORY; ITEM-LEVEL; ITERATION ALGORITHMS; ITERATIVE APPROACH; PRODUCTION AND INVENTORY; PRODUCTION PLANNING; SAFETY STOCK PLACEMENT; SUFFICIENT CONDITIONS; SUPPLY CHAIN NETWORK; TWO STAGE;

EID: 79958184747     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2010.07.011     Document Type: Conference Paper
Times cited : (28)

References (25)
  • 3
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained mrp systems: Review, formulation and problem Reduction
    • P.J. Billington, J.O. McClain, and L.J. Thomas Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction Management Science 29 1983 1126 1141 (Pubitemid 14468571)
    • (1983) Management Science , vol.39 , Issue.10 , pp. 1126-1141
    • Billington Peter, J.1    McClain John, O.2    Thomas L.Joseph3
  • 5
    • 0019590377 scopus 로고
    • Hierarchical production planning: A single stage system
    • G.R. Bitran, E.A. Haas, and A.C. Hax Hierarchical production planning: a single stage system Operations Research 29 1981 717 743
    • (1981) Operations Research , vol.29 , pp. 717-743
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 6
    • 0020103083 scopus 로고
    • Hierarchical production planning: A two-stage system
    • G.R. Bitran, E.A. Haas, and A.C. Hax Hierarchical production planning: a two-stage system Operations Research 30 1982 232 251
    • (1982) Operations Research , vol.30 , pp. 232-251
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 7
    • 38849119144 scopus 로고    scopus 로고
    • A periodic-review modeling approach for guaranteed service supply chains
    • J.M. Bossert, and S.P. Willems A periodic-review modeling approach for guaranteed service supply chains Interfaces 37 2007 420 435
    • (2007) Interfaces , vol.37 , pp. 420-435
    • Bossert, J.M.1    Willems, S.P.2
  • 8
    • 0033325198 scopus 로고    scopus 로고
    • Simultaneous planning of production, capacity, and inventory in seasonal demand environments
    • J.R. Bradley, and B.C. Arntzen The simultaneous planning of production, capacity, and inventory in seasonal demand environments Operations Research 47 1999 795 806 (Pubitemid 30594279)
    • (1999) Operations Research , vol.47 , Issue.6 , pp. 795-806
    • Bradley, J.R.1    Arntzen, B.C.2
  • 11
    • 33748884885 scopus 로고    scopus 로고
    • Simultaneous lot sizing and scheduling for multi-product multi-level production
    • DOI 10.1016/j.ijpe.2005.04.011, PII S0925527305002240
    • G. Fandel, and C. Stammen-Hegene Simultaneous lot sizing and scheduling for multi-product multi-level production International Journal of Production Economics 104 2006 308 316 (Pubitemid 44425413)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 308-316
    • Fandel, G.1    Stammen-Hegene, C.2
  • 13
    • 0008599904 scopus 로고
    • Hierarchical model for production planning in the case of uncertain demand
    • H. Gfrerer, and G. Zapfel Hierarchical model for production planning in the case of uncertain demand European Journal of Operational Research 86 1995 142 161
    • (1995) European Journal of Operational Research , vol.86 , pp. 142-161
    • Gfrerer, H.1    Zapfel, G.2
  • 16
    • 0017320423 scopus 로고
    • Hierarchical integration of production planning and scheduling
    • A.C. Hax, and H.C. Meal Hierarchical integration of production planning and scheduling M. Geisler, TIMS Studies in Management Science 1975 North-Holland Amsterdam 53 69
    • (1975) TIMS Studies in Management Science , pp. 53-69
    • Hax, A.C.1    Meal, H.C.2
  • 20
    • 0042023222 scopus 로고
    • Decomposition and iterative aggregation in hierarchical and decentralized planning structures
    • K. Jornsten, and R. Leisten Decomposition and iterative aggregation in hierarchical and decentralized planning structures European Journal of Operational Research 86 1995 120 141
    • (1995) European Journal of Operational Research , vol.86 , pp. 120-141
    • Jornsten, K.1    Leisten, R.2
  • 21
    • 8744283651 scopus 로고    scopus 로고
    • Control-oriented approaches to supply chain management in semiconductor manufacturing
    • Kempf, K.G.; Control-oriented approaches to supply chain management in semiconductor manufacturing. In: Proceedings of the American Control Conference, 2004, pp. 45634576.
    • (2004) Proceedings of the American Control Conference , pp. 4563-4576
    • Kempf, K.G.1
  • 22
    • 0035929278 scopus 로고    scopus 로고
    • Extended model for a hybrid production planning approach
    • DOI 10.1016/S0925-5273(00)00172-9, PII S0925527300001729
    • B. Kim, and S. Kim Extended model for a hybrid production planning approach International Journal of Production Economics 73 2001 165 173 (Pubitemid 32903551)
    • (2001) International Journal of Production Economics , vol.73 , Issue.2 , pp. 165-173
    • Kim, B.1    Kim, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.