메뉴 건너뛰기




Volumn , Issue , 2007, Pages 829-834

Rolling horizon procedure for large-scale job-shop scheduling problems

Author keywords

Job shop scheduling problem; Large scale; Release times; RHP; SBP

Indexed keywords

COMPUTATIONAL METHODS; PROBLEM SOLVING;

EID: 40649090205     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICAL.2007.4338679     Document Type: Conference Paper
Times cited : (7)

References (8)
  • 1
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic Job-shop scheduling: Past, present and future
    • A.-S. Jain, S. Meeran, "Deterministic Job-shop scheduling: past, present and future," European Journal of Operational Research, vol.113, pp.390-434, 1999.
    • (1999) European Journal of Operational Research , vol.113 , pp. 390-434
    • Jain, A.-S.1    Meeran, S.2
  • 2
    • 0034155381 scopus 로고    scopus 로고
    • Decomposition methods for large Job shops
    • M. Singer, "Decomposition methods for large Job shops," Computers & Operations Research, vol.28, no3, pp. 193-207, 2001.
    • (2001) Computers & Operations Research , vol.28 , Issue.NO3 , pp. 193-207
    • Singer, M.1
  • 4
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for Job shop scheduling
    • J. Adams, E. Balas, and D.Zawack, "The shifting bottleneck procedure for Job shop scheduling," Management Science," vol.34, no.3, pp.391-401, 1988.
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 5
    • 13844266916 scopus 로고    scopus 로고
    • Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem
    • B. Wang, Y.-G. Xi and H.-Y. Gu, "Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem," Computers and Operations Research, vol.32, no.11, pp.3059-3072, 2005.
    • (2005) Computers and Operations Research , vol.32 , Issue.11 , pp. 3059-3072
    • Wang, B.1    Xi, Y.-G.2    Gu, H.-Y.3
  • 6
    • 33645790304 scopus 로고    scopus 로고
    • Two-level rolling procedure based on dummy schedule for dynamic scheduling problem with incomplete global information
    • B. Wang, Y.-G Xi, "Two-level rolling procedure based on dummy schedule for dynamic scheduling problem with incomplete global information," ACTA AUTOMATICA SINICA, vol.32, no. 1, pp.9-14, 2006.
    • (2006) ACTA AUTOMATICA SINICA , vol.32 , Issue.1 , pp. 9-14
    • Wang, B.1    Xi, Y.-G.2
  • 7
    • 40649128150 scopus 로고    scopus 로고
    • Rolling horizon scheduling procedure and performance analysis,
    • Ph. D. Dissertation of Shanghai Jiaotong University, March
    • B. Wang, "Rolling horizon scheduling procedure and performance analysis," Ph. D. Dissertation of Shanghai Jiaotong University, March 2005.
    • (2005)
    • Wang, B.1
  • 8
    • 26844462197 scopus 로고
    • Supplement to Resource constrained project scheduling: An experimental investigation of heuristic scheduling techniques
    • Carnegie-Mellon University, October
    • S. Lawrence, "Supplement to "Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques," GSIA, Carnegie-Mellon University, October 1984.
    • (1984) GSIA
    • Lawrence, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.