-
1
-
-
0018998806
-
Improving motivation and productivity on large projects
-
0733-9364
-
Borcherding, J. D., Samelson, N. M., and Sebastian, S. M. (1980). Improving motivation and productivity on large projects.. J. Constr. Eng. Manage. 0733-9364, 106 (1), 73-89.
-
(1980)
J. Constr. Eng. Manage.
, vol.106
, Issue.1
, pp. 73-89
-
-
Borcherding, J.D.1
Samelson, N.M.2
Sebastian, S.M.3
-
2
-
-
0347186791
-
-
21st Ed., RSMeans Construction Publishers and Consultants, Kingston, MA
-
Means, R. S. (2007). Heavy construction cost data, 21st Ed., RSMeans Construction Publishers and Consultants, Kingston, MA.
-
(2007)
Heavy Construction Cost Data
-
-
Means, R.S.1
-
3
-
-
0034225578
-
Schedule acceleration, work flow, and labor productivity
-
0733-9364, , 10.1061/(ASCE)0733-9364(2000)126:4(261)
-
Thomas, H. R. (2000). Schedule acceleration, work flow, and labor productivity.. J. Constr. Eng. Manage. 0733-9364, 126 (4), 261-267. 10.1061/(ASCE)0733-9364(2000)126:4(261)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 261-267
-
-
Thomas, H.R.1
-
4
-
-
2342444111
-
-
Source Document 35, Construction Industry Institute, Austin, TX
-
Thomas, H. R., and Kramer, D. F. (1987). Construction productivity measurement and performance evaluation.. Source Document 35, Construction Industry Institute, Austin, TX
-
(1987)
Construction Productivity Measurement and Performance Evaluation
-
-
Thomas, H.R.1
Kramer, D.F.2
-
5
-
-
13944281185
-
Role of workforce management in bridge superstructure labor productivity
-
DOI 10.1061/(ASCE)0742-597X(2003)19:1(9)
-
Thomas, H. R., Minchin, R. E., and Chen, D. (2003). Role of workforce management in bridge substructure labor productivity.. J. Manage. Eng. 0742-597X, 19 (1), 9-16. 10.1061/(ASCE)0742-597X(2003)19:1(9) (Pubitemid 40329332)
-
(2003)
Journal of Management in Engineering
, vol.19
, Issue.1
, pp. 9-16
-
-
Thomas, H.R.1
Minchin Jr., R.E.2
Chen, D.3
-
6
-
-
0029361062
-
Quantitative effects of construction changes on labor productivity
-
0733-9364, , 10.1061/(ASCE)0733-9364(1995)121:3(290)
-
Thomas, H. R., and Napolitan, C. L. (1995). Quantitative effects of construction changes on labor productivity.. J. Constr. Eng. Manage. 0733-9364, 121 (3), 290-296. 10.1061/(ASCE)0733-9364(1995)121:3(290)
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.3
, pp. 290-296
-
-
Thomas, H.R.1
Napolitan, C.L.2
-
7
-
-
23044480533
-
Productivity and cost regression models for pile construction
-
DOI 10.1061/(ASCE)0733-9364(2005)131:7(779)
-
Zayed, T. M., and Halpin, D. W. (2005). Productivity and cost regression models for pile construction.. J. Constr. Eng. Manage. 0733-9364, 131 (7), 779-789. 10.1061/(ASCE)0733-9364(2005)131:7(779) (Pubitemid 41068299)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.7
, pp. 779-789
-
-
Zayed, T.M.1
Halpin, D.W.2
-
8
-
-
33947428682
-
Study on elastic modulus and recovery coefficient of cushioning materials in pile driving
-
DOI 10.1061/(ASCE)0899-1561(2007)19:4(313)
-
Zhou, L. (2007). Study on elastic modulus and recovery coefficient of cushioning materials in pile driving.. J. Mater. Civ. Eng. 0899-1561, 19 (4), 313-320. 10.1061/(ASCE)0899-1561(2007)19:4(313) (Pubitemid 46454863)
-
(2007)
Journal of Materials in Civil Engineering
, vol.19
, Issue.4
, pp. 313-320
-
-
Zhou, L.1
Chen, J.2
Lao, W.3
|