Volumn 35, Issue 1, 2011, Pages 95-103

A comprehensive bid/no-bid decision making framework for construction companies

Author keywords

Bid no bid; Contractor firm; Correlation; Framework

Indexed keywords

ANALYTICAL HIERARCHY PROCESS; BID/NO-BID; BIDDING BEHAVIOR; CONSTRUCTION COMPANIES; CORRELATION; DECISION MAKERS; DECISION MAKING MODELS; DECISION-MAKING METHOD; FRAMEWORK; LARGE SIZES; LINGUISTIC DESCRIPTIONS; LOGICAL DECISIONS; SIMPLE ADDITIVE WEIGHTING; SOUND DECISION; STRATEGIC DECISIONS;

EID: 79955808797     PISSN: 10286284     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (26)

References (28)
  • 4
    • 84950234637 scopus 로고
    • Factors affecting a contractor's mark-up size decision in Saudi Arabia
    • 1992
    • Shash, A. A. & Abdul-Hadi, N. H. (1992). Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10, 1992.
    • (1992) Construction Management and Economics , vol.10
    • Shash, A.A.1    Abdul-Hadi, N.H.2
  • 8
    • 85047681882 scopus 로고    scopus 로고
    • A survey of the bidding practices of Canadian civil engineering construction contractors
    • Fayek, A., Ghoshal, I. & AbouRizk, S. (1999). A survey of the bidding practices of Canadian civil engineering construction contractors. Canadian Journal of Civil Engineering, Vol. 26, No. 1.
    • (1999) Canadian Journal of Civil Engineering , vol.26 , Issue.1
    • Fayek, A.1    Ghoshal, I.2    AbouRizk, S.3
  • 13
    • 0036813520 scopus 로고    scopus 로고
    • The factors influencing bid mark-up decisions of large and medium-size contractors in Singapore
    • Dulaimi, M. F. & Shan, H. G. (2002). The factors influencing bid mark-up decisions of large and medium-size contractors in Singapore. Construction Management and Economics, Vol. 20.
    • (2002) Construction Management and Economics , vol.20
    • Dulaimi, M.F.1    Shan, H.G.2
  • 16
    • 33751297100 scopus 로고    scopus 로고
    • A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions
    • Egemen, M. & Mohamed, A. N. (2007). A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Building and Environment, Vol. 42.
    • (2007) Building and Environment , vol.42
    • Egemen, M.1    Mohamed, A.N.2
  • 17
    • 0036501546 scopus 로고    scopus 로고
    • Strategic implementation of infrastructure priority projects: Case study in palestine
    • Ziara, M., Nigim, K., Enshassi, A., Ayyub, B. M. (2002). Strategic Implementation of Infrastructure Priority Projects: Case Study in Palestine. ASCE, Journal of Infrastructure Systems, Vol. 8, No. 1.
    • (2002) ASCE, Journal of Infrastructure Systems , vol.8 , Issue.1
    • Ziara, M.1    Nigim, K.2    Enshassi, A.3    Ayyub, B.M.4
  • 19
    • 34548665502 scopus 로고    scopus 로고
    • Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China
    • Zhang, G. & Zou, P. X. (2007). Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China. Journal of Construction Engineering and Management, Vol. 133, No. 10.
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.10
    • Zhang, G.1    Zou, P.X.2
  • 20
    • 0003253168 scopus 로고    scopus 로고
    • Fuzzy logic for evaluating alternative construction technology
    • Li, C. (1998). Fuzzy logic for evaluating alternative construction technology. ASCE Journal of Construction Engineering and Management, Vol. 124, No. 4.
    • (1998) ASCE Journal of Construction Engineering and Management , vol.124 , Issue.4
    • Li, C.1
  • 23
    • 0002477667 scopus 로고
    • The magic number seven, plus or minus seven
    • Miller, G. A. (1965). The magic number seven, plus or minus seven. Psychological Review, Vol. 63.
    • (1965) Psychological Review , vol.63
    • Miller, G.A.1
  • 24
    • 0026106979 scopus 로고
    • Project risk assessment using the analytical hierarchy process
    • Mustafa, M. & Al-Bahar, J. (1991). Project risk assessment using the analytical hierarchy process. IEEE Trans. Eng. Manage.
    • (1991) IEEE Trans. Eng. Manage
    • Mustafa, M.1    Al-Bahar, J.2
  • 25
    • 0000958950 scopus 로고    scopus 로고
    • Priority setting in maintenance management: A modified multi-attribute approach using analytical hierarchy process
    • Shen, Q., Lo, K. & Wang, K. (1998). Priority setting in maintenance management: A modified multi-attribute approach using analytical hierarchy process. Constr. Manage. & Econ., Vol. 16, No. 6.
    • (1998) Constr. Manage. & Econ. , vol.16 , Issue.6
    • Shen, Q.1    Lo, K.2    Wang, K.3
  • 26
    • 0000365630 scopus 로고    scopus 로고
    • Project procurement system selection model
    • Alhazmi, T. & McCaffer, R. (2000). Project procurement system selection model. J. Constr. Eng. Manage., Vol. 126, No. 3.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.3
    • Alhazmi, T.1    McCaffer, R.2
  • 27
    • 0000272113 scopus 로고    scopus 로고
    • The use of multi-criteria decision analysis to support the search for less conflicting policy options in a multi-actor context: Case study
    • Carlos, A. & Costa, B. (2001). The use of multi-criteria decision analysis to support the search for less conflicting policy options in a multi-actor context: Case study. J. Multi-criteria Decision Analysis, Vol. 10, No. 2.
    • (2001) J. Multi-criteria Decision Analysis , vol.10 , Issue.2
    • Carlos, A.1    Costa, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.