메뉴 건너뛰기




Volumn 31, Issue 2, 2011, Pages 118-129

A particle swarm optimization algorithm for balancing assembly lines

Author keywords

Assembly lines; Balancing; Process efficiency; Programming and algorithm theory

Indexed keywords

AGGREGATION METHODS; ASSEMBLY LINE; BI-CRITERIA; BICRITERIA OPTIMIZATION; COMBINATORIAL OPTIMIZATION ALGORITHM; CYCLE TIME; DELAY TIME; DESIGN/METHODOLOGY/APPROACH; LINE BALANCING; MULTI OBJECTIVE; MULTIPLE TEST; NP-HARD; PARETO OPTIMAL SOLUTIONS; PARTICLE SWARM OPTIMIZATION ALGORITHM; PERFORMANCE CRITERION; POTENTIAL SOLUTIONS; PROCESS EFFICIENCY; PRODUCTION AND OPERATIONS MANAGEMENT; PROGRAMMING AND ALGORITHM THEORY; PSO ALGORITHMS; REPRESENTATION MECHANISM; SIMPLE ASSEMBLY LINE BALANCING; WEIGHT COEFFICIENTS; WEIGHTED METHOD;

EID: 79955704004     PISSN: 01445154     EISSN: None     Source Type: Journal    
DOI: 10.1108/01445151111117700     Document Type: Article
Times cited : (31)

References (30)
  • 1
    • 33749548509 scopus 로고    scopus 로고
    • Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
    • DOI 10.1080/00207540600621029, PII J0534L5672T6N812
    • Allahverdi, A. and Al-Anzi, F.S. (2006), "Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times", International Journal of Production Research, Vol. 44 No. 22, pp. 4713-35. (Pubitemid 44536479)
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4713-4735
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 3
    • 0022768294 scopus 로고
    • SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM.
    • Baybars, I. (1986), "A survey of exact algorithms for the simple assembly line balancing problem", Management Science, Vol. 32, pp. 909-32. (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars Ilker1
  • 4
    • 0001096735 scopus 로고
    • Genetics and random keys for sequencing and optimization
    • Bean, J. (1994), "Genetics and random keys for sequencing and optimization", ORSA Journal on Computing, Vol. 6 No. 2, pp. 154-60.
    • (1994) ORSA Journal on Computing , vol.6 , Issue.2 , pp. 154-160
    • Bean, J.1
  • 5
    • 37349007853 scopus 로고    scopus 로고
    • Assembly line balancing: Which model to use when?
    • DOI 10.1016/j.ijpe.2007.02.026, PII S0925527307000965
    • Boysen, N., Fliedner, M. and Scholl, A. (2008), "Assembly line balancing: Which model to use when?", International Journal of Production Economics, Vol. 111 No. 2, pp. 509-28. (Pubitemid 350299150)
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 509-528
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 6
    • 0036464756 scopus 로고    scopus 로고
    • The particle swarm-explosion, stability, and convergence in a multidimensional complex space
    • DOI 10.1109/4235.985692, PII S1089778X02022099
    • Clerc, M. and Kennedy, J. (2002), "The particle swarmexplosion, stability, and convergence in a multidimensional complex space", IEEE Transactions on Evolutionary Computation, Vol. 6 No. 1, pp. 58-73. (Pubitemid 34404564)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.1 , pp. 58-73
    • Clerc, M.1    Kennedy, J.2
  • 7
    • 33644861570 scopus 로고    scopus 로고
    • Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
    • DOI 10.1016/j.ijpe.2005.02.007, PII S0925527305000630
    • Ding, F.-Y., Zhu, J. and Sun, H. (2006), "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives", International Journal of Production Economics, Vol. 102 No. 1, pp. 108-31. (Pubitemid 43374571)
    • (2006) International Journal of Production Economics , vol.102 , Issue.1 , pp. 108-131
    • Ding, F.-Y.1    Zhu, J.2    Sun, H.3
  • 9
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini, R., Grassi, A. and Rimini, B. (2006), "A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem", International Journal of Production Economics, Vol. 102 No. 2, pp. 226-43.
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 11
    • 74149092231 scopus 로고    scopus 로고
    • Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line
    • Giard, V. and Jeunet, J. (2010), "Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line", International Journal of Production Economics, Vol. 123 No. 2, pp. 290-300.
    • (2010) International Journal of Production Economics , vol.123 , Issue.2 , pp. 290-300
    • Giard, V.1    Jeunet, J.2
  • 12
    • 37049013963 scopus 로고    scopus 로고
    • The Behavior of Particles
    • Evolutionary Programming VII
    • Kennedy, J. (1998), "The behavior of particles", in Porto, V.W., Saravanan, N., Waagen, D. and Eiben, A.E. (Eds), Evolutionary Programming VII, Springer, Berlin, pp. 581-90. (Pubitemid 128118968)
    • (1998) LECTURE NOTES IN COMPUTER SCIENCE , Issue.1447 , pp. 581-590
    • Kennedy, J.1
  • 13
    • 0030192703 scopus 로고    scopus 로고
    • Genetic algorithms for assembly line balancing with various objectives
    • DOI 10.1016/0360-8352(96)00009-5
    • Kim, Y.K., Kim, Y.-J. and Kim, Y. (1996), "Genetic algorithms for assembly line balancing with various objectives", Computers Industrial Engineering, Vol. 30 No. 3, pp. 397-409. (Pubitemid 126393347)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.3 SPEC. ISS. , pp. 397-409
    • Kim, Y.K.1    Kim, Y.J.2    Kim, Y.3
  • 14
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • DOI 10.1016/S0360-8352(01)00029-8, PII S0360835201000298
    • Lee, T.O., Kim, Y. and Kim, Y.K. (2001), "Two-sided assembly line balancing to maximize work relatedness and slackness", Computers & Industrial Engineering, Vol. 40 No. 3, pp. 273-92. (Pubitemid 32573629)
    • (2001) Computers and Industrial Engineering , vol.40 , Issue.3 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 15
    • 33644523720 scopus 로고    scopus 로고
    • Order-planning model and algorithm for manufacturing steel sheets
    • Liu, S., Tang, J. and Song, J. (2006), "Order-planning model and algorithm for manufacturing steel sheets", International Journal of Production Economics, Vol. 100 No. 1, pp. 30-43.
    • (2006) International Journal of Production Economics , vol.100 , Issue.1 , pp. 30-43
    • Liu, S.1    Tang, J.2    Song, J.3
  • 16
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • McMullen, P.R. and Frazier, G.V. (1998), "Using simulated annealing to solve multi-objective assembly line balancing problem with parallel workstations", International Journal of Production Research, Vol. 36, pp. 2717-41. (Pubitemid 128553169)
    • (1998) International Journal of Production Research , vol.36 , Issue.10 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 18
    • 0030241820 scopus 로고    scopus 로고
    • Multi-objective genetic algorithm and its applications to flowshop scheduling
    • DOI 10.1016/0360-8352(96)00045-9
    • Murata, T., Ishibuchi, H. and Tanaka, H. (1996), "Multiobjective genetic algorithms and its application to flowshop scheduling", Computers & Industrial Engineering, Vol. 30 No. 4, pp. 957-68. (Pubitemid 126375906)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 19
    • 31844453012 scopus 로고    scopus 로고
    • Meta-heuristics from nature for the loop layout design problem
    • DOI 10.1016/j.ijpe.2005.02.001, PII S0925527305000484
    • Nearchou, A.C. (2006), "Meta-heuristics from nature for the loop layout design problem", International Journal of Production Economics, Vol. 101 No. 2, pp. 312-28. (Pubitemid 43180017)
    • (2006) International Journal of Production Economics , vol.101 , Issue.2 , pp. 312-328
    • Nearchou, A.C.1
  • 20
    • 39449130408 scopus 로고    scopus 로고
    • Multi-objective balancing of assembly lines by population heuristics
    • DOI 10.1080/00207540600988089, PII 771182681
    • Nearchou, A.C. (2008), "Multi-objective balancing of assembly lines by population heuristics", International Journal of Production Research, Vol. 46 No. 8, pp. 2275-97. (Pubitemid 351272741)
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2275-2297
    • Nearchou, A.C.1
  • 21
    • 0344291226 scopus 로고    scopus 로고
    • Recent approaches to global optimization problems through particle swarm optimization
    • Parsopoulos, K.E. and Vrahatis, M.N. (2002), "Recent approaches to global optimization problems through particle swarm optimization", Natural Computing, Vol. 1, pp. 235-306.
    • (2002) Natural Computing , vol.1 , pp. 235-306
    • Parsopoulos, K.E.1    Vrahatis, M.N.2
  • 23
  • 26
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.022, PII S0377221704004795, Balancing Assembly and Transfer Lines
    • Scholl, A. and Becker, C. (2006), "State of the art exact and heuristic solution procedures for simple assembly line balancing", European Journal of Operational Research, Vol. 168 No. 3, pp. 666-93. (Pubitemid 41336586)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 27
    • 69249217757 scopus 로고    scopus 로고
    • Particle swarm optimization: A study of particle displacement for solving continuous and combinatorial optimization problems
    • Tchomté, S.K. and Gourgand, M. (2009), "Particle swarm optimization: A study of particle displacement for solving continuous and combinatorial optimization problems", International Journal of Production Economics, Vol. 121 No. 1, pp. 57-67.
    • (2009) International Journal of Production Economics , vol.121 , Issue.1 , pp. 57-67
    • Tchomté, S.K.1    Gourgand, M.2
  • 28
    • 46849083916 scopus 로고    scopus 로고
    • A multiple objective particle swarm optimization approach for inventory classification
    • Tsai, C.-Y. and Yeh, S.-W. (2008), "A multiple objective particle swarm optimization approach for inventory classification", International Journal of Production Economics, Vol. 114 No. 2, pp. 656-66.
    • (2008) International Journal of Production Economics , vol.114 , Issue.2 , pp. 656-666
    • Tsai, C.-Y.1    Yeh, S.-W.2
  • 29
    • 34250843217 scopus 로고    scopus 로고
    • Optimisation of business process designs: An algorithmic approach with multiple objectives
    • DOI 10.1016/j.ijpe.2006.12.032, PII S0925527306003562
    • Vergidis, K., Tiwari, A., Majeed, B. and Roy, R. (2007), "Optimisation of business process designs: An algorithmic approach with multiple objectives", International Journal of Production Economics, Vol. 109 Nos 1/2, pp. 105-21. (Pubitemid 46977202)
    • (2007) International Journal of Production Economics , vol.109 , Issue.1-2 , pp. 105-121
    • Vergidis, K.1    Tiwari, A.2    Majeed, B.3    Roy, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.