메뉴 건너뛰기




Volumn 22, Issue 4, 2011, Pages 541-558

An investigation into current production challenges facing the Libyan cement industry and the need for innovative total productive maintenance (TPM) strategy

Author keywords

Cements and concrete technology; Libya; Productive maintenance

Indexed keywords

CASE STUDY APPROACH; COMPARATIVE ANALYSIS; CONCRETE TECHNOLOGY; CURRENT PRODUCTION; DESIGN VALUE; DESIGN/METHODOLOGY/APPROACH; ENVIRONMENTAL ASPECTS; LIBYA; MANAGEMENT STRATEGIES; MIDDLE MANAGERS; PERSONAL DEVELOPMENT; PRODUCTION DATA; PRODUCTION LEVEL; PRODUCTION PROBLEMS; PRODUCTION STRATEGY; PRODUCTIVE MAINTENANCE; STRATEGIC FRAMEWORKS; SURVEY METHODOLOGY; TOTAL PRODUCTIVE MAINTENANCE;

EID: 79955693302     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410381111126445     Document Type: Article
Times cited : (45)

References (20)
  • 1
    • 38149094414 scopus 로고    scopus 로고
    • An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance
    • Ahuja, I.P.S. and Khamba, J.S. (2008), "An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance", International Journal of Quality & Reliability Management, Vol. 25 No. 2, pp. 147-72.
    • (2008) International Journal of Quality & Reliability Management , vol.25 , Issue.2 , pp. 147-172
    • Ahuja, I.P.S.1    Khamba, J.S.2
  • 2
    • 70249150079 scopus 로고    scopus 로고
    • Reviews and case studies a case study of total productive maintenance implementation at precision tube mills
    • Ahuja, I.P.S. and Kumar, P. (2009), "Reviews and case studies a case study of total productive maintenance implementation at precision tube mills", Internal of Quality in Maintenance Engineeing, Vol. 15 No. 3, pp. 241-58.
    • (2009) Internal of Quality in Maintenance Engineeing , vol.15 , Issue.3 , pp. 241-258
    • Ahuja, I.P.S.1    Kumar, P.2
  • 3
    • 79955698713 scopus 로고    scopus 로고
    • An evaluation of a heat transfer process using sensor fusion of thermocouples and infrared thermography
    • KingsCollege,Cambridge,UK, 18 July
    • Al-Habaibeh, A. and Parkin, R.M. (2005), "An evaluation of a heat transfer process using sensor fusion of thermocouples and infrared thermography", Proceedings of the International Conference on ConditionMonitoring 2005, KingsCollege,Cambridge,UK, 18 July, pp. 229-33.
    • (2005) Proceedings of the International Conference on ConditionMonitoring 2005 , pp. 229-233
    • Al-Habaibeh, A.1    Parkin, R.M.2
  • 6
    • 0036208272 scopus 로고    scopus 로고
    • Auditing of the maintenance system of Fuhais plant/Jordan Cement Factories Co.
    • DOI 10.1108/13552510210420595
    • Al-Muhaisen, M. and Santarisi, N. (2002), "Auditing of the maintenance system of Fuhais plant/Jordan Cement Factories Co", Journal of Quality in Maintenance Engineering, Vol. 8 No. 1, pp. 62-76. (Pubitemid 34278073)
    • (2002) Journal of Quality in Maintenance Engineering , vol.8 , Issue.1 , pp. 62-76
    • Al-Muhaisen, M.1    Santarisi, N.2
  • 7
    • 69249221297 scopus 로고    scopus 로고
    • Maintenance practices in Swedish industries: Survey results
    • Alsyouf, I. (2009), "Maintenance practices in Swedish industries: Survey results", International Journal of Production Economics, Vol. 121, pp. 212-23.
    • (2009) International Journal of Production Economics , vol.121 , pp. 212-223
    • Alsyouf, I.1
  • 8
    • 0032688919 scopus 로고    scopus 로고
    • Factors affecting successful implementation of total productive maintenance - A UK manufacturing case study perspective
    • Bamber, C.J., Sharp, J.M. and Hides, M.T. (1999), "Factors affecting successful implementation of total productive maintenance - a UK manufacturing case study perspective", Journal of Quality in Maintenance Engineering, Vol. 5 No. 3, pp. 162-81.
    • (1999) Journal of Quality in Maintenance Engineering , vol.5 , Issue.3 , pp. 162-181
    • Bamber, C.J.1    Sharp, J.M.2    Hides, M.T.3
  • 10
    • 10444282169 scopus 로고    scopus 로고
    • Implementation of total productive maintenance: A case study
    • Chan, F.T.S. (2005), "Implementation of total productive maintenance: A case study", International Journal of Production Economics, Vol. 95 No. 1, pp. 71-94.
    • (2005) International Journal of Production Economics , vol.95 , Issue.1 , pp. 71-94
    • Chan, F.T.S.1
  • 12
    • 51749119887 scopus 로고    scopus 로고
    • Investigation into the implementation stages of manufacturing and quality techniques and philosophies within the Libyan cement industry
    • Hokoma, R.A., Mohamed, K. and Khalid, H. (2008), "Investigation into the implementation stages of manufacturing and quality techniques and philosophies within the Libyan cement industry", Journal of Manufacturing Technology Management, Vol. 19 No. 7, pp. 893-907.
    • (2008) Journal of Manufacturing Technology Management , vol.19 , Issue.7 , pp. 893-907
    • Hokoma, R.A.1    Mohamed, K.2    Khalid, H.3
  • 14
    • 42149123891 scopus 로고
    • On-line machine process diagnostics
    • Kegg, R.L. (1984), "On-line machine process diagnostics", Ann CIRP, Vol. 32 No. 469, p. 1984.
    • (1984) Ann CIRP , vol.32 , Issue.469 , pp. 1984
    • Kegg, R.L.1
  • 17
    • 43149120470 scopus 로고    scopus 로고
    • Japanese context: An integrated management system
    • Rod, G., Ron, F. and Kaoru, K. (2008), "Japanese context: An integrated management system", Management Decision, Vol. 46 No. 4, pp. 565-79.
    • (2008) Management Decision , vol.46 , Issue.4 , pp. 565-579
    • Rod, G.1    Ron, F.2    Kaoru, K.3
  • 19
    • 33644598208 scopus 로고    scopus 로고
    • Manufacturing excellence through TPM implementation: A practical analysis
    • Sharma, R.K., Kumar, D. and Kumar, P. (2006), "Manufacturing excellence through TPM implementation: A practical analysis", Industrial Management & Data Systems, Vol. 106 No. 2, pp. 256-80.
    • (2006) Industrial Management & Data Systems , vol.106 , Issue.2 , pp. 256-280
    • Sharma, R.K.1    Kumar, D.2    Kumar, P.3
  • 20
    • 33947206478 scopus 로고    scopus 로고
    • Implementation of total productive maintenance in food industry: A case study
    • DOI 10.1108/13552510710735087
    • Tsarouhas, P. (2007), "Reviews and case studies implementation of total productive maintenance in food industry: A case study", Journal of Quality in Maintenance Engineering, Vol. 13 No. 1, pp. 5-18. (Pubitemid 46432519)
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , Issue.1 , pp. 5-18
    • Tsarouhas, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.