메뉴 건너뛰기




Volumn 53, Issue 1-4, 2011, Pages 35-46

Production control in a failure-prone manufacturing network using discrete event simulation and automated response surface methodology

Author keywords

Automated response surface methodology; Discrete event simulation; Experimental design; Failure prone manufacturing system

Indexed keywords

ANALYTICAL SOLUTIONS; AUTOMATED RESPONSE; COMPLEX SYSTEMS; CONTROL POLICY; CONTROL PROBLEMS; DEMAND RATES; DEPENDENT FAILURE; EXPERIMENTAL DESIGN; FAILURE-PRONE MANUFACTURING SYSTEM; HEDGING POINT; MAINTENANCE POLICY; MULTIPLE PRODUCTS; PRODUCTION RATES; PRONE MANUFACTURING; STOCHASTIC OPTIMAL CONTROL; WORK IN PROCESS;

EID: 79955615622     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2814-0     Document Type: Article
Times cited : (50)

References (25)
  • 1
    • 84908300343 scopus 로고
    • Time operational part-routing in manufacturing system with failure prone machines
    • Albuquerque, NW
    • Older GJ, Suri R (1980) Time operational part-routing in manufacturing system with failure prone machines. In: Proc. 19th conf. decis. control, Albuquerque, NW
    • (1980) Proc. 19th Conf. Decis. Control
    • Older, G.J.1    Suri, R.2
  • 3
    • 0020915621 scopus 로고
    • An algorithm for the computer control of production in felxible manufacturing system
    • Kimemia JG, Gershwin SB (1983) An algorithm for the computer control of production in felxible manufacturing system. IIE Trans 15:353-362
    • (1983) IIE Trans , vol.15 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 4
    • 0016498087 scopus 로고
    • Control of systems with jump Markov disturbances
    • Rishel R (1975) Control of systems with jump Markov disturbances. IEEE Trans Automat Contr 20:241-244
    • (1975) IEEE Trans Automat Contr , vol.20 , pp. 241-244
    • Rishel, R.1
  • 5
    • 0022667867 scopus 로고
    • OPTIMAL CONTROL OF PRODUCTION RATE IN A FAILURE PRONE MANUFACTURING SYSTEM.
    • Akella PR, Kumar PR (1986) Optimal control of production rate in a failure prone manufacturing system. IEEE Trans Automat Contr AC-31(2):116-126 (Pubitemid 16575324)
    • (1986) IEEE Transactions on Automatic Control , vol.AC-31 , Issue.2 , pp. 116-126
    • Akella Ramakrishna1    Kumar, P.R.2
  • 6
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bielecki T, Kumar PR (1988) Optimality of zero-inventory policies for unreliable manufacturing systems, operations research archives. 36(4):532-541
    • (1988) Operations Research Archives , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 7
    • 0024048635 scopus 로고
    • Production control of manufacturing system with multiple machine states
    • Sharifnia A (1988) Production control of manufacturing system with multiple machine states. IEEE Trans Automat Contr 33(7)
    • (1988) IEEE Trans Automat Contr , vol.33 , Issue.7
    • Sharifnia, A.1
  • 9
    • 0030171583 scopus 로고    scopus 로고
    • Optimal control of manufacturing flow and preventive maintenance
    • PII S0018928696037221
    • Boukas EK, Yang H (1996) Manufacturing flow control and preventive maintenance: a stochastic control approach. IEEE Trans Automat Contr 41(6):881-885 (Pubitemid 126767940)
    • (1996) IEEE Transactions on Automatic Control , vol.41 , Issue.6 , pp. 881-885
    • Boukas, E.K.1    Yang, H.2
  • 10
    • 0031140208 scopus 로고    scopus 로고
    • Control policy simulation based on machine age in a failure prone one-machine, one-product manufacturing system
    • Kenne JP, Gharbi A, Boukas EK (1997) Control policy simulation based on machine age in a failure prone onemachine, one-product manufacturing system. Int J Prod Res 35(5):1431-1445 (Pubitemid 127549675)
    • (1997) International Journal of Production Research , vol.35 , Issue.5 , pp. 1431-1445
    • Kenne, J.P.1    Gharbi, A.2    Boukas, E.K.3
  • 11
    • 78651413353 scopus 로고    scopus 로고
    • Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay
    • Mourania I, Hennequina S, Xie X (2006) Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay. International of Production Economics
    • (2006) International of Production Economics
    • Mourania, I.1    Hennequina, S.2    Xie, X.3
  • 12
    • 0033079907 scopus 로고    scopus 로고
    • Experimental design in the production and maintenance control problem of a single machine, single product manufacturing system
    • Kenne JP, Gharbi A (1999) Experimental design in the production and maintenance control problem of a single machine, single product manufacturing system. Int J Prod Res 37(3):621-637
    • (1999) Int J Prod Res , vol.37 , Issue.3 , pp. 621-637
    • Kenne, J.P.1    Gharbi, A.2
  • 13
    • 33750995575 scopus 로고    scopus 로고
    • Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale
    • DOI 10.1016/j.ejor.2006.01.029, PII S0377221706000695
    • Kenne JP, Gharbi A, Beit M (2007) Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale. Eur J Oper Res 178: 408-420 (Pubitemid 44750478)
    • (2007) European Journal of Operational Research , vol.178 , Issue.2 , pp. 408-420
    • Kenne, J.-P.1    Gharbi, A.2    Beit, M.3
  • 14
    • 0034562974 scopus 로고    scopus 로고
    • Average cost optimality for an unreliable two-machine flowshop with limited internal buffer
    • Presman EL, Seti SP, Zhang H (2000) Average cost optimality for an unreliable two-machine flowshop with limited internal buffer. Ann Oper Res 98:333-351
    • (2000) Ann Oper Res , vol.98 , pp. 333-351
    • Presman, E.L.1    Seti, S.P.2    Zhang, H.3
  • 15
    • 0035252464 scopus 로고    scopus 로고
    • Markovian approximation for manufacturing systems of unreliable machines in tandem
    • DOI 10.1002/1520-6750(200102)48:1<65::AID-NAV4>3.0.CO;2-5
    • ChingWK (2001) Markovian approximation for manufacturing systems of unreliablemachines in tandem. Nav Res Logist 48:65-78 (Pubitemid 32137149)
    • (2001) Naval Research Logistics , vol.48 , Issue.1 , pp. 65-78
    • Ching, W.K.1
  • 16
    • 15344350551 scopus 로고    scopus 로고
    • Maintenance scheduling and production control of multiple-machine manufacturing systems
    • DOI 10.1016/j.cie.2004.12.007, PII S0360835204001858, Selected Papers from the 30th International Conference on Computers and Industrial Engineering
    • Gharbi A, Kenne JP (2005) Maintenance scheduling and production control of multiple-machine manufacturing systems. Comput Ind Eng 48:693-707 (Pubitemid 40391491)
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.4 , pp. 693-707
    • Gharbi, A.1    Kenne, J.-P.2
  • 17
    • 0033737583 scopus 로고    scopus 로고
    • Production and preventive maintenance rates control for manufacturing system: An experimental design approach
    • Gharbi A, Kenne JP (2000) Production and preventive maintenance rates control for manufacturing system: an experimental design approach. Int J Prod Econ 65:275-287
    • (2000) Int J Prod Econ , vol.65 , pp. 275-287
    • Gharbi, A.1    Kenne, J.P.2
  • 18
    • 0025481509 scopus 로고
    • Manufacturing flow control and preventive maintenance: A stochastic control approach
    • Boukas EK, HaurieA(1990) Manufacturing flow control and preventive maintenance: a stochastic control approach. IEEE Trans Automat Contr 33(9):1024-1031
    • (1990) IEEE Trans Automat Contr , vol.33 , Issue.9 , pp. 1024-1031
    • Boukas, E.K.1    Haurie, A.2
  • 24
    • 0002363078 scopus 로고
    • On the experimental attainment of optimum conditions
    • discussion, 38-45
    • Box, GEP, Wilson KB (1951) On the experimental attainment of optimum conditions. J R Stat Soc B13:1-38, discussion, 38-45
    • (1951) J R Stat Soc , vol.B13 , pp. 1-38
    • Box, G.E.P.1    Wilson, K.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.