-
1
-
-
84908300343
-
Time operational part-routing in manufacturing system with failure prone machines
-
Albuquerque, NW
-
Older GJ, Suri R (1980) Time operational part-routing in manufacturing system with failure prone machines. In: Proc. 19th conf. decis. control, Albuquerque, NW
-
(1980)
Proc. 19th Conf. Decis. Control
-
-
Older, G.J.1
Suri, R.2
-
3
-
-
0020915621
-
An algorithm for the computer control of production in felxible manufacturing system
-
Kimemia JG, Gershwin SB (1983) An algorithm for the computer control of production in felxible manufacturing system. IIE Trans 15:353-362
-
(1983)
IIE Trans
, vol.15
, pp. 353-362
-
-
Kimemia, J.G.1
Gershwin, S.B.2
-
4
-
-
0016498087
-
Control of systems with jump Markov disturbances
-
Rishel R (1975) Control of systems with jump Markov disturbances. IEEE Trans Automat Contr 20:241-244
-
(1975)
IEEE Trans Automat Contr
, vol.20
, pp. 241-244
-
-
Rishel, R.1
-
5
-
-
0022667867
-
OPTIMAL CONTROL OF PRODUCTION RATE IN A FAILURE PRONE MANUFACTURING SYSTEM.
-
Akella PR, Kumar PR (1986) Optimal control of production rate in a failure prone manufacturing system. IEEE Trans Automat Contr AC-31(2):116-126 (Pubitemid 16575324)
-
(1986)
IEEE Transactions on Automatic Control
, vol.AC-31
, Issue.2
, pp. 116-126
-
-
Akella Ramakrishna1
Kumar, P.R.2
-
6
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki T, Kumar PR (1988) Optimality of zero-inventory policies for unreliable manufacturing systems, operations research archives. 36(4):532-541
-
(1988)
Operations Research Archives
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
7
-
-
0024048635
-
Production control of manufacturing system with multiple machine states
-
Sharifnia A (1988) Production control of manufacturing system with multiple machine states. IEEE Trans Automat Contr 33(7)
-
(1988)
IEEE Trans Automat Contr
, vol.33
, Issue.7
-
-
Sharifnia, A.1
-
9
-
-
0030171583
-
Optimal control of manufacturing flow and preventive maintenance
-
PII S0018928696037221
-
Boukas EK, Yang H (1996) Manufacturing flow control and preventive maintenance: a stochastic control approach. IEEE Trans Automat Contr 41(6):881-885 (Pubitemid 126767940)
-
(1996)
IEEE Transactions on Automatic Control
, vol.41
, Issue.6
, pp. 881-885
-
-
Boukas, E.K.1
Yang, H.2
-
10
-
-
0031140208
-
Control policy simulation based on machine age in a failure prone one-machine, one-product manufacturing system
-
Kenne JP, Gharbi A, Boukas EK (1997) Control policy simulation based on machine age in a failure prone onemachine, one-product manufacturing system. Int J Prod Res 35(5):1431-1445 (Pubitemid 127549675)
-
(1997)
International Journal of Production Research
, vol.35
, Issue.5
, pp. 1431-1445
-
-
Kenne, J.P.1
Gharbi, A.2
Boukas, E.K.3
-
11
-
-
78651413353
-
Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay
-
Mourania I, Hennequina S, Xie X (2006) Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay. International of Production Economics
-
(2006)
International of Production Economics
-
-
Mourania, I.1
Hennequina, S.2
Xie, X.3
-
12
-
-
0033079907
-
Experimental design in the production and maintenance control problem of a single machine, single product manufacturing system
-
Kenne JP, Gharbi A (1999) Experimental design in the production and maintenance control problem of a single machine, single product manufacturing system. Int J Prod Res 37(3):621-637
-
(1999)
Int J Prod Res
, vol.37
, Issue.3
, pp. 621-637
-
-
Kenne, J.P.1
Gharbi, A.2
-
13
-
-
33750995575
-
Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale
-
DOI 10.1016/j.ejor.2006.01.029, PII S0377221706000695
-
Kenne JP, Gharbi A, Beit M (2007) Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale. Eur J Oper Res 178: 408-420 (Pubitemid 44750478)
-
(2007)
European Journal of Operational Research
, vol.178
, Issue.2
, pp. 408-420
-
-
Kenne, J.-P.1
Gharbi, A.2
Beit, M.3
-
14
-
-
0034562974
-
Average cost optimality for an unreliable two-machine flowshop with limited internal buffer
-
Presman EL, Seti SP, Zhang H (2000) Average cost optimality for an unreliable two-machine flowshop with limited internal buffer. Ann Oper Res 98:333-351
-
(2000)
Ann Oper Res
, vol.98
, pp. 333-351
-
-
Presman, E.L.1
Seti, S.P.2
Zhang, H.3
-
15
-
-
0035252464
-
Markovian approximation for manufacturing systems of unreliable machines in tandem
-
DOI 10.1002/1520-6750(200102)48:1<65::AID-NAV4>3.0.CO;2-5
-
ChingWK (2001) Markovian approximation for manufacturing systems of unreliablemachines in tandem. Nav Res Logist 48:65-78 (Pubitemid 32137149)
-
(2001)
Naval Research Logistics
, vol.48
, Issue.1
, pp. 65-78
-
-
Ching, W.K.1
-
16
-
-
15344350551
-
Maintenance scheduling and production control of multiple-machine manufacturing systems
-
DOI 10.1016/j.cie.2004.12.007, PII S0360835204001858, Selected Papers from the 30th International Conference on Computers and Industrial Engineering
-
Gharbi A, Kenne JP (2005) Maintenance scheduling and production control of multiple-machine manufacturing systems. Comput Ind Eng 48:693-707 (Pubitemid 40391491)
-
(2005)
Computers and Industrial Engineering
, vol.48
, Issue.4
, pp. 693-707
-
-
Gharbi, A.1
Kenne, J.-P.2
-
17
-
-
0033737583
-
Production and preventive maintenance rates control for manufacturing system: An experimental design approach
-
Gharbi A, Kenne JP (2000) Production and preventive maintenance rates control for manufacturing system: an experimental design approach. Int J Prod Econ 65:275-287
-
(2000)
Int J Prod Econ
, vol.65
, pp. 275-287
-
-
Gharbi, A.1
Kenne, J.P.2
-
18
-
-
0025481509
-
Manufacturing flow control and preventive maintenance: A stochastic control approach
-
Boukas EK, HaurieA(1990) Manufacturing flow control and preventive maintenance: a stochastic control approach. IEEE Trans Automat Contr 33(9):1024-1031
-
(1990)
IEEE Trans Automat Contr
, vol.33
, Issue.9
, pp. 1024-1031
-
-
Boukas, E.K.1
Haurie, A.2
-
20
-
-
84871799513
-
A frame work for response surface methodology for simulation optimization
-
Orlando, Florida, 10-13 December 2000
-
Neddermeijer HG, Gerrit J, Oortmarssen V, Piersma N, Dekker R (2000) A frame work for response surface methodology for simulation optimization. In: Proceedings of the 32nd conference on winter simulation, Orlando, Florida, 10-13 December 2000
-
(2000)
Proceedings of the 32nd Conference on Winter Simulation
-
-
Neddermeijer, H.G.1
Gerrit, J.2
Oortmarssen, V.3
Piersma, N.4
Dekker, R.5
-
21
-
-
17744374816
-
Automated response surface methodology for stochastic optimization models with unknown variance
-
Washington, D.C., 5-8 December 2004
-
Nicolai RP, Dekker R, Piersma N, Oortmarssen JG (2004) Automated response surface methodology for stochastic optimization models with unknown variance. In: Proceedings of the 36th winter simulation conference,Washington, D.C., 5-8 December 2004
-
(2004)
Proceedings of the 36th Winter Simulation Conference
-
-
Nicolai, R.P.1
Dekker, R.2
Piersma, N.3
Oortmarssen, J.G.4
-
24
-
-
0002363078
-
On the experimental attainment of optimum conditions
-
discussion, 38-45
-
Box, GEP, Wilson KB (1951) On the experimental attainment of optimum conditions. J R Stat Soc B13:1-38, discussion, 38-45
-
(1951)
J R Stat Soc
, vol.B13
, pp. 1-38
-
-
Box, G.E.P.1
Wilson, K.B.2
|