메뉴 건너뛰기




Volumn , Issue , 2003, Pages

Part orientation in selective laser sintering

Author keywords

Materials; Orientation; Selective laser sintering

Indexed keywords

BUILD TIME; INTELLIGENT DECISION SUPPORT; ORIENTATION; PART ORIENTATION; SELECTIVE LASER SINTERING;

EID: 79955514220     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (17)
  • 1
    • 0037279916 scopus 로고    scopus 로고
    • Rapid prototyping and rapid tooling - The key enablers for rapid manufacturing
    • Pham DT and Dimov SS, 2003, "Rapid Prototyping and Rapid Tooling - the Key Enablers for Rapid Manufacturing", Proceedings of the ImechE, Vol 217, Part C, pp 1 - 23
    • (2003) Proceedings of the ImechE , vol.217 , Issue.PART C , pp. 1-23
    • Pham, D.T.1    Dimov, S.S.2
  • 4
    • 79955496808 scopus 로고    scopus 로고
    • Cost benefit analysis of production injection mould tools manufactured through indirect SLS
    • October 10-11, Cardiff, UK
    • Delgarno KW, Stewart TD, Childs THC & Bridge E, 2000, "Cost Benefit Analysis of Production Injection Mould Tools Manufactured through Indirect SLS", Time Compression Technologies Conference, October 10-11, Cardiff, UK, pp 181 - 186
    • (2000) Time Compression Technologies Conference , pp. 181-186
    • Delgarno, K.W.1    Stewart, T.D.2    Childs, T.H.C.3    Bridge, E.4
  • 5
    • 78649827203 scopus 로고    scopus 로고
    • DTM Corporation DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754
    • DTM Corporation, 2001, "SLS - Selective Laser Sintering", DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754
    • (2001) SLS - Selective Laser Sintering
  • 7
    • 0031701699 scopus 로고    scopus 로고
    • The development of a CAD environment to determine the preferred build-up direction for layered manufacturing
    • Hur J and Lee K, 1998, "The Development of a CAD Environment to Determine the Preferred Build-up Direction for Layered Manufacturing", International Journal of Advanced Manufacturing Technology, Vol. 14, pp. 247 - 254 (Pubitemid 128570897)
    • (1998) International Journal of Advanced Manufacturing Technology , vol.14 , Issue.4 , pp. 247-254
    • Hur, J.1    Lee, K.2
  • 8
    • 0030735110 scopus 로고    scopus 로고
    • Determining fabrication orientations for rapid prototyping with stereolithography apparatus
    • PII S0010448596000498
    • Lan, P, Chou S, Chen L and Gemmill D, 1997, "Determination of Fabrication Orientations for Rapid Prototyping with Stereolithography Apparatus", Computer Aided Design, Vol. 29, 1, pp 53 - 62 (Pubitemid 127425560)
    • (1997) CAD Computer Aided Design , vol.29 , Issue.1 , pp. 53-62
    • Lan, P.-T.1    Chou, S.-Y.2    Chen, L.-L.3    Gemmill, D.4
  • 9
    • 0001416654 scopus 로고
    • Preferred direction of build for rapid prototyping processes
    • Dayton, Ohio, June 12 - 15
    • Frank D and Fadel G, 1994, "Preferred Direction of Build for Rapid Prototyping Processes", 5th International Conference on Rapid Prototyping, Dayton, Ohio, June 12 - 15, pp 191 - 201
    • (1994) 5th International Conference on Rapid Prototyping , pp. 191-201
    • Frank, D.1    Fadel, G.2
  • 11
    • 0029394398 scopus 로고
    • Concurrent intelligent rapid prototyping environment
    • Masood SH and Lim BS, 1995 "Concurrent Intelligent Rapid Prototyping Environment" Journal of Intelligent Manufacturing, Vol. 6, pp 291-310
    • (1995) Journal of Intelligent Manufacturing , vol.6 , pp. 291-310
    • Masood, S.H.1    Lim, B.S.2
  • 12
    • 0031353284 scopus 로고    scopus 로고
    • Optimal orientation with variable slicing in stereolithography
    • Xu F, Wong YS, Loh HT, Fuh JYH and Miyazawa T, 1997, "Optimal Orientation with Variable Slicing in Stereolithography", Rapid Prototyping Journal, Vol. 3, Number 3, pp. 76 - 88 (Pubitemid 127656612)
    • (1997) Rapid Prototyping Journal , vol.3 , Issue.3 , pp. 76-88
    • Xu, F.1    Wong, Y.S.2    Loh, H.T.3    Fuh, J.Y.H.4    Miyazawa, T.5
  • 15
    • 79955487020 scopus 로고    scopus 로고
    • accessed 24/04/03
    • 2003, http://www.3dsystems.com/products/index.asp, accessed 24/04/03
    • (2003)
  • 16
    • 0344907273 scopus 로고
    • A procedure to estimate build time for stereolithography machines
    • 1425 Payne Rd, Schaumburg IL 60173
    • Tata K and Flynn D, 1995, "A Procedure to Estimate Build Time For Stereolithography Machines" Prototype Express, 1425 Payne Rd, Schaumburg IL 60173
    • (1995) Prototype Express
    • Tata, K.1    Flynn, D.2
  • 17
    • 79955489531 scopus 로고    scopus 로고
    • Private Communication, DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754
    • Private Communication, DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.