-
1
-
-
0037279916
-
Rapid prototyping and rapid tooling - The key enablers for rapid manufacturing
-
Pham DT and Dimov SS, 2003, "Rapid Prototyping and Rapid Tooling - the Key Enablers for Rapid Manufacturing", Proceedings of the ImechE, Vol 217, Part C, pp 1 - 23
-
(2003)
Proceedings of the ImechE
, vol.217
, Issue.PART C
, pp. 1-23
-
-
Pham, D.T.1
Dimov, S.S.2
-
4
-
-
79955496808
-
Cost benefit analysis of production injection mould tools manufactured through indirect SLS
-
October 10-11, Cardiff, UK
-
Delgarno KW, Stewart TD, Childs THC & Bridge E, 2000, "Cost Benefit Analysis of Production Injection Mould Tools Manufactured through Indirect SLS", Time Compression Technologies Conference, October 10-11, Cardiff, UK, pp 181 - 186
-
(2000)
Time Compression Technologies Conference
, pp. 181-186
-
-
Delgarno, K.W.1
Stewart, T.D.2
Childs, T.H.C.3
Bridge, E.4
-
5
-
-
78649827203
-
-
DTM Corporation DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754
-
DTM Corporation, 2001, "SLS - Selective Laser Sintering", DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754
-
(2001)
SLS - Selective Laser Sintering
-
-
-
6
-
-
0001663199
-
Quantification of errors in rapid prototyping processes, and determination of preferred orientation of parts
-
Bablani M and Bagchi A, 1995, "Quantification of Errors in Rapid Prototyping Processes, and Determination of Preferred Orientation of Parts", Transactions of the North American Manufacturing Research Institute of the Society of Manufacturing Engineers, Vol. 23, pp. 319 - 324
-
(1995)
Transactions of the North American Manufacturing Research Institute of the Society of Manufacturing Engineers
, vol.23
, pp. 319-324
-
-
Bablani, M.1
Bagchi, A.2
-
7
-
-
0031701699
-
The development of a CAD environment to determine the preferred build-up direction for layered manufacturing
-
Hur J and Lee K, 1998, "The Development of a CAD Environment to Determine the Preferred Build-up Direction for Layered Manufacturing", International Journal of Advanced Manufacturing Technology, Vol. 14, pp. 247 - 254 (Pubitemid 128570897)
-
(1998)
International Journal of Advanced Manufacturing Technology
, vol.14
, Issue.4
, pp. 247-254
-
-
Hur, J.1
Lee, K.2
-
8
-
-
0030735110
-
Determining fabrication orientations for rapid prototyping with stereolithography apparatus
-
PII S0010448596000498
-
Lan, P, Chou S, Chen L and Gemmill D, 1997, "Determination of Fabrication Orientations for Rapid Prototyping with Stereolithography Apparatus", Computer Aided Design, Vol. 29, 1, pp 53 - 62 (Pubitemid 127425560)
-
(1997)
CAD Computer Aided Design
, vol.29
, Issue.1
, pp. 53-62
-
-
Lan, P.-T.1
Chou, S.-Y.2
Chen, L.-L.3
Gemmill, D.4
-
9
-
-
0001416654
-
Preferred direction of build for rapid prototyping processes
-
Dayton, Ohio, June 12 - 15
-
Frank D and Fadel G, 1994, "Preferred Direction of Build for Rapid Prototyping Processes", 5th International Conference on Rapid Prototyping, Dayton, Ohio, June 12 - 15, pp 191 - 201
-
(1994)
5th International Conference on Rapid Prototyping
, pp. 191-201
-
-
Frank, D.1
Fadel, G.2
-
10
-
-
0029517101
-
Multi-objective optimization of part-building orientation in stereolithography
-
Cheng W, Fuh JYH, Nee AYC, Wong YS, Loh HT and Miyazawa T, 1995, "Multi-objective Optimization of Part-building Orientation in Stereolithography", Rapid Prototyping Journal, Vol. 1, Number 4, pp 12 - 23
-
(1995)
Rapid Prototyping Journal
, vol.1
, Issue.4
, pp. 12-23
-
-
Cheng, W.1
Fuh, J.Y.H.2
Nee, A.Y.C.3
Wong, Y.S.4
Loh, H.T.5
Miyazawa, T.6
-
12
-
-
0031353284
-
Optimal orientation with variable slicing in stereolithography
-
Xu F, Wong YS, Loh HT, Fuh JYH and Miyazawa T, 1997, "Optimal Orientation with Variable Slicing in Stereolithography", Rapid Prototyping Journal, Vol. 3, Number 3, pp. 76 - 88 (Pubitemid 127656612)
-
(1997)
Rapid Prototyping Journal
, vol.3
, Issue.3
, pp. 76-88
-
-
Xu, F.1
Wong, Y.S.2
Loh, H.T.3
Fuh, J.Y.H.4
Miyazawa, T.5
-
13
-
-
0032598851
-
Part orientation in stereolithography
-
Pham DT, Dimov SS and Gault RS, 1999, "Part Orientation in Stereolithography", International Journal of Advanced Manufacturing Technology, Vol. 15, pp. 674 - 682
-
(1999)
International Journal of Advanced Manufacturing Technology
, vol.15
, pp. 674-682
-
-
Pham, D.T.1
Dimov, S.S.2
Gault, R.S.3
-
15
-
-
79955487020
-
-
accessed 24/04/03
-
2003, http://www.3dsystems.com/products/index.asp, accessed 24/04/03
-
(2003)
-
-
-
16
-
-
0344907273
-
A procedure to estimate build time for stereolithography machines
-
1425 Payne Rd, Schaumburg IL 60173
-
Tata K and Flynn D, 1995, "A Procedure to Estimate Build Time For Stereolithography Machines" Prototype Express, 1425 Payne Rd, Schaumburg IL 60173
-
(1995)
Prototype Express
-
-
Tata, K.1
Flynn, D.2
-
17
-
-
79955489531
-
-
Private Communication, DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754
-
Private Communication, DTM Corporation, 1611 Headway Circle, Building 2, Austin, Texas 78754
-
-
-
|