-
1
-
-
0029517101
-
Multi-objective optimization of part-building orientation in stereolithography
-
W Cheng, J. Y. H. Fuh, A. Y. C. Nee, Y. S. Wong, H. T. Loh and T. Miyazawa, "Multi-objective optimization of part-building orientation in stereolithography", Rapid Prototyping Journal 1(4), pp. 12-33, 1995.
-
(1995)
Rapid Prototyping Journal
, vol.1
, Issue.4
, pp. 12-33
-
-
Cheng, W.1
Fuh, J.Y.H.2
Nee, A.Y.C.3
Wong, Y.S.4
Loh, H.T.5
Miyazawa, T.6
-
2
-
-
0030735110
-
Determination of fabrication orientations for rapid prototyping with stereolithography apparatus
-
P Lan, S. Chou, L. Chen and D. Gemmill, "Determination of fabrication orientations for rapid prototyping with stereolithography apparatus", Computer-Aided Design, 29(1), pp. 53-62, 1997.
-
(1997)
Computer-Aided Design
, vol.29
, Issue.1
, pp. 53-62
-
-
Lan, P.1
Chou, S.2
Chen, L.3
Gemmill, D.4
-
3
-
-
0001416654
-
Preferred direction of build for rapid prototyping processes
-
Dayton, Ohio, 12-15 June
-
D. Frank and G. Fadel, "Preferred direction of build for rapid prototyping processes", 5th International Conference on Rapid Prototyping, Dayton, Ohio, pp. 191-201, 12-15 June 1994.
-
(1994)
5th International Conference on Rapid Prototyping
, pp. 191-201
-
-
Frank, D.1
Fadel, G.2
-
4
-
-
0029394398
-
Concurrent intelligent rapid prototyping environment
-
S. H. Masood and B. S. Lim, "Concurrent intelligent rapid prototyping environment", Journal of Intelligent Manufacturing, 6, pp. 291-310, 1995.
-
(1995)
Journal of Intelligent Manufacturing
, vol.6
, pp. 291-310
-
-
Masood, S.H.1
Lim, B.S.2
-
5
-
-
0009362323
-
A genetic algorithm for optimizing multiple part placement to reduce build time
-
Dayton, Ohio, 12-15 June
-
J. Wodziak, G. Fadel and C. Kirschman, "A genetic algorithm for optimizing multiple part placement to reduce build time", Proceedings of the 5th International Conference on Rapid Prototyping, Dayton, Ohio, 12-15 June 1994.
-
(1994)
Proceedings of the 5th International Conference on Rapid Prototyping
-
-
Wodziak, J.1
Fadel, G.2
Kirschman, C.3
-
6
-
-
0345338472
-
A guide to prototyping
-
UK and International Press
-
D. T. Pham, S. S. Dimov and R. S. Gault, "A guide to prototyping", Prototyping Technology International '97, UK and International Press, pp. 15-19, 1997.
-
(1997)
Prototyping Technology International '97
, pp. 15-19
-
-
Pham, D.T.1
Dimov, S.S.2
Gault, R.S.3
-
7
-
-
3843123600
-
Support generation for rapid prototyping
-
Dayton, Ohio, 12-15 June
-
B. Swaelens, J. Pauwels and W. Vancraen, "Support generation for rapid prototyping", 6th International Conference on Rapid Prototyping, Dayton, Ohio, pp. 115-121, 12-15 June 1994.
-
(1994)
6th International Conference on Rapid Prototyping
, pp. 115-121
-
-
Swaelens, B.1
Pauwels, J.2
Vancraen, W.3
-
8
-
-
0344475774
-
How to estimate the building time for the Stereos 300
-
Stuttgart, 10-11 June
-
A. Osorio, "How to estimate the building time for the Stereos 300", Rapid Product Development Conference, Stuttgart, 10-11 June 1996.
-
(1996)
Rapid Product Development Conference
-
-
Osorio, A.1
-
9
-
-
0030392071
-
Predicting total build time and the resultant cure depth of the 3D stereolithography process
-
C. C. Chen and P. A. Sullivan, "Predicting total build time and the resultant cure depth of the 3D stereolithography process", Rapid Prototyping Journal, 2(4), pp. 27-40, 1996.
-
(1996)
Rapid Prototyping Journal
, vol.2
, Issue.4
, pp. 27-40
-
-
Chen, C.C.1
Sullivan, P.A.2
-
10
-
-
0344907273
-
A Procedure to Estimate Build Time for Stereolithography Machines
-
1425 Payne Rd, Schaumburg, IL 60173
-
K. Tata and D. Flynn, A Procedure to Estimate Build Time for Stereolithography Machines, Prototype Express, 1425 Payne Rd, Schaumburg, IL 60173, 1995.
-
(1995)
Prototype Express
-
-
Tata, K.1
Flynn, D.2
|