메뉴 건너뛰기




Volumn 15, Issue 9, 1999, Pages 674-682

Part orientation in stereolithography

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER AIDED DESIGN; COMPUTER SIMULATION; DECISION SUPPORT SYSTEMS; FACTORY AUTOMATION; FEATURE EXTRACTION; OBJECT ORIENTED PROGRAMMING; PROBLEM SOLVING; PROCESS ENGINEERING; PRODUCT DESIGN; PRODUCT DEVELOPMENT; RAPID PROTOTYPING;

EID: 0032598851     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s001700050118     Document Type: Article
Times cited : (112)

References (11)
  • 2
    • 0030735110 scopus 로고    scopus 로고
    • Determination of fabrication orientations for rapid prototyping with stereolithography apparatus
    • P Lan, S. Chou, L. Chen and D. Gemmill, "Determination of fabrication orientations for rapid prototyping with stereolithography apparatus", Computer-Aided Design, 29(1), pp. 53-62, 1997.
    • (1997) Computer-Aided Design , vol.29 , Issue.1 , pp. 53-62
    • Lan, P.1    Chou, S.2    Chen, L.3    Gemmill, D.4
  • 3
    • 0001416654 scopus 로고
    • Preferred direction of build for rapid prototyping processes
    • Dayton, Ohio, 12-15 June
    • D. Frank and G. Fadel, "Preferred direction of build for rapid prototyping processes", 5th International Conference on Rapid Prototyping, Dayton, Ohio, pp. 191-201, 12-15 June 1994.
    • (1994) 5th International Conference on Rapid Prototyping , pp. 191-201
    • Frank, D.1    Fadel, G.2
  • 4
    • 0029394398 scopus 로고
    • Concurrent intelligent rapid prototyping environment
    • S. H. Masood and B. S. Lim, "Concurrent intelligent rapid prototyping environment", Journal of Intelligent Manufacturing, 6, pp. 291-310, 1995.
    • (1995) Journal of Intelligent Manufacturing , vol.6 , pp. 291-310
    • Masood, S.H.1    Lim, B.S.2
  • 8
    • 0344475774 scopus 로고    scopus 로고
    • How to estimate the building time for the Stereos 300
    • Stuttgart, 10-11 June
    • A. Osorio, "How to estimate the building time for the Stereos 300", Rapid Product Development Conference, Stuttgart, 10-11 June 1996.
    • (1996) Rapid Product Development Conference
    • Osorio, A.1
  • 9
    • 0030392071 scopus 로고    scopus 로고
    • Predicting total build time and the resultant cure depth of the 3D stereolithography process
    • C. C. Chen and P. A. Sullivan, "Predicting total build time and the resultant cure depth of the 3D stereolithography process", Rapid Prototyping Journal, 2(4), pp. 27-40, 1996.
    • (1996) Rapid Prototyping Journal , vol.2 , Issue.4 , pp. 27-40
    • Chen, C.C.1    Sullivan, P.A.2
  • 10
    • 0344907273 scopus 로고
    • A Procedure to Estimate Build Time for Stereolithography Machines
    • 1425 Payne Rd, Schaumburg, IL 60173
    • K. Tata and D. Flynn, A Procedure to Estimate Build Time for Stereolithography Machines, Prototype Express, 1425 Payne Rd, Schaumburg, IL 60173, 1995.
    • (1995) Prototype Express
    • Tata, K.1    Flynn, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.