메뉴 건너뛰기




Volumn 27, Issue 6, 2011, Pages 860-870

Online scheduling of workflow applications in grid environments

Author keywords

Grid; Mixed parallel; Online scheduling; Workflow

Indexed keywords

CONCURRENT WORKFLOWS; DATA PARALLEL; GRID; GRID ENVIRONMENTS; MIXED-PARALLEL; NP COMPLETE PROBLEMS; ONLINE SCHEDULING; SIMULATION EXPERIMENTS; WORK-FLOWS; WORKFLOW; WORKFLOW APPLICATIONS;

EID: 79953211843     PISSN: 0167739X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.future.2010.10.015     Document Type: Conference Paper
Times cited : (82)

References (26)
  • 1
    • 59849095285 scopus 로고    scopus 로고
    • Workflows and e-science: An overview of workflow system features and capabilities
    • E. Deelman, D. Gannon, M. Shields, and I. Taylor Workflows and e-science: an overview of workflow system features and capabilities Future Gener. Comput. Syst. 25 5 2009 528 540
    • (2009) Future Gener. Comput. Syst. , vol.25 , Issue.5 , pp. 528-540
    • Deelman, E.1    Gannon, D.2    Shields, M.3    Taylor, I.4
  • 3
    • 70349973875 scopus 로고    scopus 로고
    • Three fundamental dimensions of scientific workflow interoperability: Model of computation, language, and execution
    • E. Elmroth, F. Hernndez, and J. Tordsson Three fundamental dimensions of scientific workflow interoperability: model of computation, language, and execution Future Gener. Comput. Syst. 26 2 2010 245 256
    • (2010) Future Gener. Comput. Syst. , vol.26 , Issue.2 , pp. 245-256
    • Elmroth, E.1    Hernndez, F.2    Tordsson, J.3
  • 4
    • 33751091161 scopus 로고    scopus 로고
    • Montage: A grid enabled image mosaic service for the national virtual observatory
    • G. Singh, E. Deelman, and G.B. Berriman Montage: a grid enabled image mosaic service for the national virtual observatory Astron. Data Anal. Softw. Syst. 13 2003
    • (2003) Astron. Data Anal. Softw. Syst. , vol.13
    • Singh, G.1    Deelman, E.2    Berriman, G.B.3
  • 5
    • 0033377664 scopus 로고    scopus 로고
    • EMAN: Semiautomated software for high-resolution single-particle reconstructions
    • DOI 10.1006/jsbi.1999.4174
    • S. Ludtke, P. Baldwin, and W. Chiu EMAN: semiautomated software for high resolution single-particle reconstructions J. Struct. Biol. 128 1999 82 97 (Pubitemid 30013436)
    • (1999) Journal of Structural Biology , vol.128 , Issue.1 , pp. 82-97
    • Ludtke, S.J.1    Baldwin, P.R.2    Chiu, W.3
  • 7
    • 0016518855 scopus 로고
    • NP-complete scheduling problems
    • J.D. Ullman NP-complete scheduling problems J. Comput. Syst. Sci. 10 1975 384 393
    • (1975) J. Comput. Syst. Sci. , vol.10 , pp. 384-393
    • Ullman, J.D.1
  • 10
    • 0030142084 scopus 로고    scopus 로고
    • Dynamic critical-path scheduling: An effective technique for allocating task graphs to multiprocessors
    • Y. Kwok, and I. Ahmad Dynamic critical-path scheduling: an effective technique for allocation task graphs to multi-processors IEEE Trans. Parallel Distrib. Syst. 7 5 1996 506 521 (Pubitemid 126782383)
    • (1996) IEEE Transactions on Parallel and Distributed Systems , vol.7 , Issue.5 , pp. 506-521
    • Kwok, Y.-K.1    Ahmad, I.2
  • 11
    • 0027542932 scopus 로고
    • A compile-time scheduling heuristic for interconnection-constrained heterogeneous processor architectures
    • G.C. Sih, and E.A. Lee A compile-time scheduling heuristic for interconnection-constrained heterogeneous processor architectures IEEE Trans. Parallel Distrib. Syst. 4 2 1993 175 186
    • (1993) IEEE Trans. Parallel Distrib. Syst. , vol.4 , Issue.2 , pp. 175-186
    • Sih, G.C.1    Lee, E.A.2
  • 12
    • 0025440941 scopus 로고
    • Scheduling parallel program tasks onto arbitrary target machines
    • DOI 10.1016/0743-7315(90)90042-N
    • H. EI-Rewini, and T.G. Lewis Scheduling parallel program tasks onto arbitrary target machines J. Parallel Distrib. Comput. 9 1990 138 153 (Pubitemid 20729738)
    • (1990) Journal of Parallel and Distributed Computing , vol.9 , Issue.2 , pp. 138-153
    • El-Rewini Hesham1    Lewis, T.G.2
  • 13
    • 0036504666 scopus 로고    scopus 로고
    • Performance-effective and low-complexity task scheduling for heterogeneous computing
    • DOI 10.1109/71.993206
    • H. Topcuoglu, S. Hariri, and M.Y. Wu Performance-effective and low-complexity task scheduling for heterogeneous computing IEEE Trans. Parallel Distrib. Syst. 2 13 2002 260 274 (Pubitemid 34448780)
    • (2002) IEEE Transactions on Parallel and Distributed Systems , vol.13 , Issue.3 , pp. 260-274
    • Topcuoglu, H.1    Hariri, S.2    Wu, M.-Y.3
  • 14
    • 0028498486 scopus 로고
    • DSC: Scheduling parallel tasks on an unbounded number of processors
    • T. Yang, and A. Gerasoulis DSC: scheduling parallel tasks on an unbounded number of processors IEEE Trans. Parallel Distrib. Syst. 5 9 1994 951 967
    • (1994) IEEE Trans. Parallel Distrib. Syst. , vol.5 , Issue.9 , pp. 951-967
    • Yang, T.1    Gerasoulis, A.2
  • 15
    • 0030706562 scopus 로고    scopus 로고
    • DFRN: A new approach for duplication based scheduling for distributed memory multi-processor systems
    • G. Park, B. Shirazi, J. Marquis, DFRN: a new approach for duplication based scheduling for distributed memory multi-processor systems, in: Proceedings of Int'l Conf. Parallel Processing, 1997.
    • (1997) Proceedings of Int'l Conf. Parallel Processing
    • Park, G.1    Shirazi, B.2    Marquis, J.3
  • 18
    • 0035363047 scopus 로고    scopus 로고
    • Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling
    • A.W. Mu'alem, and D.G. Feitelson Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling IEEE Trans. Parallel Distrib. Syst. 12 6 2001
    • (2001) IEEE Trans. Parallel Distrib. Syst. , vol.12 , Issue.6
    • Mu'Alem, A.W.1    Feitelson, D.G.2
  • 19
    • 55749088418 scopus 로고    scopus 로고
    • A planner-guided scheduling strategy for multiple workflow applications
    • Sept
    • Z. Yu, W. Shi, A planner-guided scheduling strategy for multiple workflow applications, in: Proceedings of ICPP-W, Sept., 2008.
    • (2008) Proceedings of ICPP-W
    • Yu, Z.1    Shi, W.2
  • 21
    • 77950019639 scopus 로고    scopus 로고
    • Cooperative and decentralized workflow scheduling in global grids
    • M. Rahman, R. Ranjan, and R. Buyya Cooperative and decentralized workflow scheduling in global grids Future Gener. Comput. Syst. 26 5 2010 753 768
    • (2010) Future Gener. Comput. Syst. , vol.26 , Issue.5 , pp. 753-768
    • Rahman, M.1    Ranjan, R.2    Buyya, R.3
  • 22
    • 79953187676 scopus 로고    scopus 로고
    • Towards the scheduling of multiple workflows on computational grids
    • L. Bittencourt, and E. Madeira Towards the scheduling of multiple workflows on computational grids J. Grid Comput. 22 2009
    • (2009) J. Grid Comput. , vol.22
    • Bittencourt, L.1    Madeira, E.2
  • 24
    • 55949098372 scopus 로고    scopus 로고
    • Towards a general model of the multi-criteria workflow scheduling on the grid
    • M. Wieczorek, A. Hoheisel, and R. Prodan Towards a general model of the multi-criteria workflow scheduling on the grid Future Gener. Comput. Syst. 25 3 2009 237 256
    • (2009) Future Gener. Comput. Syst. , vol.25 , Issue.3 , pp. 237-256
    • Wieczorek, M.1    Hoheisel, A.2    Prodan, R.3
  • 26
    • 77953736759 scopus 로고    scopus 로고
    • Concurrent Scheduling of Parallel Task Graphs on Multi-Clusters Using Constrained Resource Allocations
    • December
    • T. N'takpe', F. Suter, Concurrent Scheduling of Parallel Task Graphs on Multi-Clusters Using Constrained Resource Allocations, Technical Report: Rapport de recherch no. 6774, December 2008.
    • (2008) Technical Report: Rapport de Recherché No. 6774
    • N'Takpe, T.1    Suter, F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.