메뉴 건너뛰기




Volumn 53, Issue 9-12, 2011, Pages 993-1018

Simulation and modelling methods in aluminium rolling industry

Author keywords

Aluminium industry; Machine utilisation; Manufacturing processes; Production management; Simulation and modelling; Throughput

Indexed keywords

ALUMINIUM INDUSTRY; MACHINE UTILISATION; MANUFACTURING PROCESSES; PRODUCTION MANAGEMENT; SIMULATION AND MODELLING;

EID: 79953027611     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2880-3     Document Type: Article
Times cited : (4)

References (28)
  • 2
    • 4043065186 scopus 로고    scopus 로고
    • On the effect of product variety in production-inventory systems
    • S Benjaafar JS Kim N Vishwanadham 2004 On the effect of product variety in production inventory systems Ann Oper Res 126 1-4 71 101 2052331 1134.90302 10.1023/B:ANOR.0000012276.87248.c7 (Pubitemid 39056541)
    • (2004) Annals of Operations Research , vol.126 , Issue.1-4 , pp. 71-101
    • Benjaafar, S.1    Kim, J.-S.2    Vishwanadham, N.3
  • 3
    • 46149124594 scopus 로고    scopus 로고
    • Supply-chain modelling and control under proportional inventory-replenishment policies
    • 2428409 10.1080/00207720802090898
    • CI Papanagnou GD Halikias 2008 Supply-chain modelling and control under proportional inventory-replenishment policies Int J Syst Sci 39 7 699 711 2428409 10.1080/00207720802090898
    • (2008) Int J Syst Sci , vol.39 , Issue.7 , pp. 699-711
    • Papanagnou, C.I.1    Halikias, G.D.2
  • 4
    • 38849114407 scopus 로고    scopus 로고
    • Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features
    • DOI 10.1016/j.ijpe.2007.04.008, PII S0925527307001776
    • MC Wu JB Jiang WJ Chang 2008 Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features Int J Prod Econ 112 416 426 10.1016/j.ijpe.2007.04.008 (Pubitemid 351187916)
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 416-426
    • Wu, M.-C.1    Jiang, J.-H.2    Chang, W.-J.3
  • 7
    • 0000361362 scopus 로고
    • Modeling managerial behaviour: Misperceptions of feedback in a dynamic decision making experiment
    • 10.1287/mnsc.35.3.321
    • JD Sterman 1989 Modeling managerial behaviour: misperceptions of feedback in a dynamic decision making experiment Manage Sci 35 3 321 339 10.1287/mnsc.35.3.321
    • (1989) Manage Sci , vol.35 , Issue.3 , pp. 321-339
    • Sterman, J.D.1
  • 8
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • 0782.90048 10.1007/BF01158636
    • Y Dallery SB Gershwin 1992 Manufacturing flow line systems: a review of models and analytical results J Queueing Syst 12 1-2 3 94 0782.90048 10.1007/BF01158636
    • (1992) J Queueing Syst , vol.12 , Issue.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 10
    • 67650264131 scopus 로고    scopus 로고
    • Dynamic simulation for performance optimization in just-in-time-enabled manufacturing processes
    • 10.1007/s00170-008-1604-4 10.1007/s00170-008-1604-4
    • YG Sandanayake CF Oduoza 2008 Dynamic simulation for performance optimization in just-in-time-enabled manufacturing processes Int J Adv Manuf Technol 42 372 380 10.1007/s00170-008-1604-4 10.1007/s00170-008-1604-4
    • (2008) Int J Adv Manuf Technol , vol.42 , pp. 372-380
    • Sandanayake, Y.G.1    Oduoza, C.F.2
  • 11
    • 0023983563 scopus 로고
    • A simulation model for corporate planning in a steel plant
    • DOI 10.1016/0377-2217(88)90149-X
    • RM Narchal 1988 A simulation model for corporate planning in a steel plant Eur J Oper Res 34 282 296 10.1016/0377-2217(88)90149-X (Pubitemid 18579984)
    • (1988) European Journal of Operational Research , vol.34 , Issue.3 , pp. 282-296
    • Narchal, R.M.1
  • 12
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • 10.1080/00207548908942650
    • BR Sarkar JA Fitzsimmons 1989 The performance of push and pull systems: a simulation and comparative study Int J Prod Res 27 10 1715 1731 10.1080/00207548908942650
    • (1989) Int J Prod Res , vol.27 , Issue.10 , pp. 1715-1731
    • Sarkar, B.R.1    Fitzsimmons, J.A.2
  • 13
    • 0027625187 scopus 로고
    • Sequencing, dispatching, and switching in a dynamic manufacturing environment
    • 10.1080/00207549308956816
    • H Matsuura H Tsubone M Kanezashi 1993 Sequencing, dispatching, and switching in a dynamic manufacturing environment Int J Prod Res 31 7 1671 1688 10.1080/00207549308956816
    • (1993) Int J Prod Res , vol.31 , Issue.7 , pp. 1671-1688
    • Matsuura, H.1    Tsubone, H.2    Kanezashi, M.3
  • 14
    • 0004029779 scopus 로고    scopus 로고
    • Accessed20May2005
    • MATLAB (2003) The language of technical computing. http://www.mathworks. com/products/matlab. Accessed 20 May 2005
    • (2003) The Language of Technical Computing
  • 22
    • 4944259808 scopus 로고    scopus 로고
    • A framework for reducing manufacturing throughput time
    • 10.1016/S0278-6125(03)80009-2
    • DJ Johnson 2003 A framework for reducing manufacturing throughput time J Manuf Syst 22 4 283 298 10.1016/S0278-6125(03)80009-2
    • (2003) J Manuf Syst , vol.22 , Issue.4 , pp. 283-298
    • Johnson, D.J.1
  • 23
    • 37149016932 scopus 로고    scopus 로고
    • A predictive reactive scheduling method for color-coating production in steel industry
    • DOI 10.1007/s00170-006-0740-y
    • L Tang X Wang 2008 A predictive reactive scheduling method for color-coating production in steel industry Int J Adv Manuf Technol 35 7-8 633 645 2411508 10.1007/s00170-006-0740-y (Pubitemid 350260741)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.35 , Issue.7-8 , pp. 633-645
    • Tang, L.1    Wang, X.2
  • 24
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • DOI 10.1016/S0377-2217(00)00240-X, PII S037722170000240X
    • L Tang J Liu A Rong Z Yang 2001 A review of planning and scheduling systems and methods for integrated steel production Eur J Oper Res 133 1 1 20 0988.90503 10.1016/S0377-2217(00)00240-X (Pubitemid 32518297)
    • (2001) European Journal of Operational Research , vol.133 , Issue.1 , pp. 1-20
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 25
    • 0142154266 scopus 로고    scopus 로고
    • An asynchronous and synchronous coupling approach in networked rapid product development
    • 10.1007/s00170-002-1439-3
    • Y Ni F Fan J Yan D Ma Y Jin 2003 An asynchronous and synchronous coupling approach in networked rapid product development Int J Adv Manuf Technol 22 26 32 10.1007/s00170-002-1439-3
    • (2003) Int J Adv Manuf Technol , vol.22 , pp. 26-32
    • Ni, Y.1    Fan, F.2    Yan, J.3    Ma, D.4    Jin, Y.5
  • 26
    • 4544235910 scopus 로고    scopus 로고
    • An improved simulated annealing simulation optimization method for discrete parameter stochastic systems
    • 2092663 1073.90026
    • SL Rosen CM Harmonosky 2005 An improved simulated annealing simulation optimization method for discrete parameter stochastic systems Comput Oper Res 32 2 343 358 2092663 1073.90026
    • (2005) Comput Oper Res , vol.32 , Issue.2 , pp. 343-358
    • Rosen, S.L.1    Harmonosky, C.M.2
  • 28
    • 0037204523 scopus 로고    scopus 로고
    • On an on-line scheduling problem for parallel jobs
    • DOI 10.1016/S0020-0190(01)00241-1, PII S0020019001002411
    • E Naroska U Schwiegelshohn 2002 On an on-line scheduling problem for parallel jobs Inf Process Lett 81 6 297 304 1879794 1013.68027 10.1016/S0020-0190(01)00241-1 (Pubitemid 34070151)
    • (2002) Information Processing Letters , vol.81 , Issue.6 , pp. 297-304
    • Naroska, E.1    Schwiegelshohn, U.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.