1
-
-
0042090631
-
Human resource selection for software development projects using Taguchi's parameter design
-
Tsai H, Moskowitz H, Lee L,. Human resource selection for software development projects using Taguchi's parameter design. European Journal of Operational Research 2003; 151: 167-180.
-
(2003)
European Journal of Operational Research
, vol.151
, pp. 167-180
-
-
Tsai, H.1
Moskowitz, H.2
Lee, L.3
-
5
-
-
49549099773
-
Time-line based model for software project scheduling with genetic algorithms
-
Chang CK, Jiang H, Di Y, Zhu D, Ge Y,. Time-line based model for software project scheduling with genetic algorithms. Information and Software Technology 2008; 50: 1142-1154.
-
(2008)
Information and Software Technology
, vol.50
, pp. 1142-1154
-
-
Chang, C.K.1
Jiang, H.2
Di, Y.3
Zhu, D.4
Ge, Y.5
-
6
-
-
3042627200
-
A task allocation optimizer for software construction
-
Duggan J, Byrne J, Lyons GJ,. A task allocation optimizer for software construction. IEEE Software 2004; 21 (3): 76-82.
-
(2004)
IEEE Software
, vol.21
, Issue.3
, pp. 76-82
-
-
Duggan, J.1
Byrne, J.2
Lyons, G.J.3
-
7
-
-
0035278719
-
An empirical study using task assignment patterns to improve the accuracy of software effort estimation
-
DOI 10.1109/32.910861
-
Smith RK, Hale JE, Parrish AS,. An empirical study using task assignment patterns to improve the accuracy of software effort estimation. IEEE Transactions on Software Engineering 2001; 27 (3): 264-271. (Pubitemid 32297405)
-
(2001)
IEEE Transactions on Software Engineering
, vol.27
, Issue.3
, pp. 264-271
-
-
Smith, R.K.1
Hale, J.E.2
Parrish, A.S.3
-
8
-
-
40249093024
-
Staffing a software project: A constraint satisfaction and optimization-based approach
-
DOI 10.1016/j.cor.2007.01.010, PII S0305054807000226
-
Barreto A, Barrros MO, Werner CML,. Staffing a software project: A constraint satisfaction and optimization-based approach. Computers and Operations Research 2008; 35: 3073-3089. (Pubitemid 351335137)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.10
, pp. 3073-3089
-
-
Barreto, A.1
Barros, M.DeO.2
Werner, C.M.L.3
-
9
-
-
70349739147
-
Coordination in large-scale software teams
-
Begel A, Nagappan N,. Coordination in large-scale software teams. Proceedings of the 2009 ICSE Workshop on Cooperative and Human Aspects on Software Engineering, Vancouver, Canada, 2009; 1-7.
-
(2009)
Proceedings of the 2009 ICSE Workshop on Cooperative and Human Aspects on Software Engineering, Vancouver, Canada
, pp. 1-7
-
-
Begel, A.1
Nagappan, N.2
-
13
-
-
0003567818
-
-
Prentice Hall PTR: Englewood Cliffs, NJ.
-
Bohem BW, Abts C, Brown AW, Chulani S, Clark BK, Horowitz E, Madachy R, Reifer D, Steece B,. Software Cost Estimation with COCOMO II. Prentice Hall PTR: Englewood Cliffs, NJ, 2000.
-
(2000)
Software Cost Estimation with COCOMO II
-
-
Bohem, B.W.1
Abts, C.2
Brown, A.W.3
Chulani, S.4
Clark, B.K.5
Horowitz, E.6
Madachy, R.7
Reifer, D.8
Steece, B.9
-
16
-
-
5744249209
-
Equations of state calculations by fast computing machines
-
Metropolis N, Rosenbluth A, Rosenbluth M, Teller A,. Equations of state calculations by fast computing machines. Journal of Chemical Physics 1953; 21 (6): 1087-1092.
-
(1953)
Journal of Chemical Physics
, vol.21
, Issue.6
, pp. 1087-1092
-
-
Metropolis, N.1
Rosenbluth, A.2
Rosenbluth, M.3
Teller, A.4
-
18
-
-
25944474939
-
Interactive simulated annealing for solving imprecise discrete multiattribute problems under risk
-
Jiménez A, Ríos-Insua S, Mateos A,. Interactive simulated annealing for solving imprecise discrete multiattribute problems under risk. Pesquisa Operacional 2002; 22 (2): 265-280.
-
(2002)
Pesquisa Operacional
, vol.22
, Issue.2
, pp. 265-280
-
-
Jiménez, A.1
Ríos-Insua, S.2
Mateos, A.3
-
19
-
-
60449109741
-
Optimized resource allocation for software release planning
-
Ngo-The A, Ruhe G,. Optimized resource allocation for software release planning. IEEE Transactions on Software Engineering 2009; 35 (1): 109-123.
-
(2009)
IEEE Transactions on Software Engineering
, vol.35
, Issue.1
, pp. 109-123
-
-
Ngo-The, A.1
Ruhe, G.2
-
21
-
-
33947217417
-
Software project management with GAs
-
Alba B, Chicano F,. Software project management with GAs. Information Science 2007; 177: 2380-2401.
-
(2007)
Information Science
, vol.177
, pp. 2380-2401
-
-
Alba, B.1
Chicano, F.2
-
23
-
-
0034315093
-
Instrument for assessing software measurement programs
-
DOI 10.1023/A:1026534430984
-
Berry M, Jeffery R,. An instrument for assessing software measurement programs. Empirical Software Engineering 2000; 5: 183-200. (Pubitemid 32085480)
-
(2000)
Empirical Software Engineering
, vol.5
, Issue.3
, pp. 183-200
-
-
Berry, M.1
Jeffery, R.2
-
24
-
-
79952847573
-
-
COPROMO. Available at.
-
COPROMO. Available at:.
-
-
-
-
25
-
-
79952855874
-
Cocomo II as productivity measurement: A case study at KBC
-
De Rore L, Snoeck M, Poels G, Dedene G,. Cocomo II as productivity measurement: A case study at KBC. FBE Research Report KBI 0829, 2008; 1-66.
-
(2008)
FBE Research Report KBI 0829
, pp. 1-66
-
-
De Rore, L.1
Snoeck, M.2
Poels, G.3
Dedene, G.4
-
26
-
-
79952860281
-
Deducing software process improvement areas from a COCOMO II-based productivity measurement
-
De Rore L, Snoeck M, Poels G, Dedene G,. Deducing software process improvement areas from a COCOMO II-based productivity measurement. Proceedings of the Fifth Software Measurement European Forum, Milan, Italy, 2008; 163-174.
-
(2008)
Proceedings of the Fifth Software Measurement European Forum, Milan, Italy
, pp. 163-174
-
-
De Rore, L.1
Snoeck, M.2
Poels, G.3
Dedene, G.4
-
27
-
-
18744410084
-
Continuous productivity assessment and effort prediction based on bayesian analysis
-
Proceedings of the 28th Annual International Computer Software and Applications Conference, COMPSAC 2004
-
Yun SJ, Simmons DB,. Continuous productivity assessment and effort prediction based on Bayesian analysis. Proceedings of the 28th Annual International Computer Software and Applications Conference, Hong Kong, 2004; 44-49. (Pubitemid 40673828)
-
(2004)
Proceedings - International Computer Software and Applications Conference
, vol.1
, pp. 44-49
-
-
Yun, S.J.1
Simmons, D.B.2
-
28
-
-
56649109917
-
Dynamic project performance estimation by combining static estimation models with system dynamics
-
Choi K, Bae DH,. Dynamic project performance estimation by combining static estimation models with system dynamics. Information and Software Technology 2009; 51: 162-172.
-
(2009)
Information and Software Technology
, vol.51
, pp. 162-172
-
-
Choi, K.1
Bae, D.H.2
-
29
-
-
0024770085
-
Optimization by simulated annealing. An experimental evaluation. Part I. Graph partitioning
-
Johnson DS, Aragon CR, Mcgeoch LA, Schevon C,. Optimization by simulated annealing: An experimental evaluation; Part I. Graph partitioning. Operations Research 1989; 37: 865-892. (Pubitemid 20625067)
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 865-892
-
-
Johnson David, S.1
Aragon Cecilia, R.2
McGeoch Lyle, A.3
Schevon Catherine4
-
31
-
-
0000438412
-
Approximation algorithms for scheduling unrelated parallel machines
-
Lenstra JK,. Approximation algorithms for scheduling unrelated parallel machines. Mathematical Programming 1990; 46: 259-271.
-
(1990)
Mathematical Programming
, vol.46
, pp. 259-271
-
-
Lenstra, J.K.1
-
32
-
-
0036609211
-
Unrelated parallel machine scheduling with setup times using simulated annealing
-
DOI 10.1016/S0736-5845(02)00013-3, PII S0736584502000133
-
Kim D, Kim K, Jang W, Chen FF,. Unrelated parallel machine scheduling with setup times using simulated annealing. Robotics and Computer Integrated Manufacturing 2002; 18: 223-231. (Pubitemid 34704281)
-
(2002)
Robotics and Computer-Integrated Manufacturing
, vol.18
, Issue.3-4
, pp. 223-231
-
-
Kim, D.-W.1
Kim, K.-H.2
Jang, W.3
Frank Chen, F.4
-
34
-
-
0018020599
-
On preemptive scheduling of unrelated parallel processors by linear programming
-
Lawler EL, Labetoulle J,. On preemptive scheduling of unrelated parallel processors by linear programming. Journal of the ACM 1978; 25 (4): 612-619. (Pubitemid 9399485)
-
(1978)
J Assoc Comput Mach
, vol.25
, Issue.4
, pp. 612-619
-
-
Lawler, E.L.1
Labetoulle, J.2
-
35
-
-
0031275738
-
Heuristics for unrelated machine scheduling with precedence constraints
-
PII S0377221796002470
-
Herrmann J, Proth JM, Sauer N,. Heuristics for unrelated machine scheduling with precedence constraints. European Journal of Operational Research 1997; 102: 528-537. (Pubitemid 127397089)
-
(1997)
European Journal of Operational Research
, vol.102
, Issue.3
, pp. 528-537
-
-
Herrmann, J.1
Proth, J.-M.2
Sauer, N.3
-
37
-
-
67650448174
-
Value-based multiple software projects scheduling with genetic algorithm
-
Xiao J, Wang Q, Li M, Yang Q, Xie L,. Value-based multiple software projects scheduling with genetic algorithm. Proceedings of the International Conference on Software Process, Vancouver, Canada, 2009; 50-62.
-
(2009)
Proceedings of the International Conference on Software Process, Vancouver, Canada
, pp. 50-62
-
-
Xiao, J.1
Wang, Q.2
Li, M.3
Yang, Q.4
Xie, L.5
-
38
-
-
4544298446
-
Making resource decisions for software projects
-
Fenton N, Marsh W, Neil M, Cates P, Forey S, Tailor M,. Making resource decisions for software projects. Proceedings of the 26th International Conference on Software Engineering, Edinburgh, U.K., 2004; 397-406.
-
(2004)
Proceedings of the 26th International Conference on Software Engineering, Edinburgh, U.K.
, pp. 397-406
-
-
Fenton, N.1
Marsh, W.2
Neil, M.3
Cates, P.4
Forey, S.5
Tailor, M.6
-
39
-
-
33646026668
-
A study on optimal scheduling for software projects
-
Padberg F,. A study on optimal scheduling for software projects. Software Process Improvement and Practice 2006; 11: 77-91.
-
(2006)
Software Process Improvement and Practice
, vol.11
, pp. 77-91
-
-
Padberg, F.1
-
41
-
-
3543085679
-
Multi-project management in software engineering using simulation modelling
-
DOI 10.1023/B:SQJO.0000013359.71560.47
-
Lee B, Miller J,. Multi-project management in software engineering using simulation modelling. Software Quality Journal 2004; 12: 59-82. (Pubitemid 39019676)
-
(2004)
Software Quality Journal
, vol.12
, Issue.1
, pp. 59-82
-
-
Lee, B.1
Miller, J.2
-
42
-
-
0742303622
-
Assessing staffing needs for a software maintenance project through queuing simulation
-
Antoniol G, Cimitile A, Di Lucca GA, Di Penta M,. Assessing staffing needs for a software maintenance project through queuing simulation. IEEE Transactions on Software Engineering 2004; 30 (1): 43-58.
-
(2004)
IEEE Transactions on Software Engineering
, vol.30
, Issue.1
, pp. 43-58
-
-
Antoniol, G.1
Cimitile, A.2
Di Lucca, G.A.3
Di Penta, M.4
-
43
-
-
0025445368
-
Optimal allocation & control problems for software-testing resources
-
DOI 10.1109/24.55878
-
Ohtera H, Yamada S,. Optimal allocation & control problems for software-testing resources. IEEE Transactions on Reliability 1990; 39 (2): 171-176. (Pubitemid 20714188)
-
(1990)
IEEE Transactions on Reliability
, vol.39
, Issue.2
, pp. 171-176
-
-
Ohtera Hiroshi1
Yamada Shigeru2
-
44
-
-
0037845174
-
Optimal testing-resource allocation with genetic algorithm for modular software systems
-
Dai YS, Xie M, Poh KL, Yang B,. Optimal testing-resource allocation with genetic algorithm for modular software systems. Journal of Systems and Software 2003; 66 (1): 47-55.
-
(2003)
Journal of Systems and Software
, vol.66
, Issue.1
, pp. 47-55
-
-
Dai, Y.S.1
Xie, M.2
Poh, K.L.3
Yang, B.4
-
45
-
-
0038778878
-
Optimal allocation policies for testing-resource based on a software reliability growth model
-
Yamada ST, Nishiwaki IM,. Optimal allocation policies for testing-resource based on a software reliability growth model. Mathematical and Computer Modelling 1995; 22 (10-12): 295-301.
-
(1995)
Mathematical and Computer Modelling
, vol.22
, Issue.1012
, pp. 295-301
-
-
Yamada, S.T.1
Nishiwaki, I.M.2
-
46
-
-
0030378729
-
Needed resources for software module test using the hyper-geometric software reliability growth model
-
Hou RH, Kuo SY, Chang YP,. Needed resources for software module test using the hyper-geometric software reliability growth model. IEEE Transactions on Reliability 1996; 45 (4): 541-549.
-
(1996)
IEEE Transactions on Reliability
, vol.45
, Issue.4
, pp. 541-549
-
-
Hou, R.H.1
Kuo, S.Y.2
Chang, Y.P.3
-
47
-
-
0031140122
-
Dynamic resource-allocation for software-module testing
-
Leung YW,. Dynamic resource-allocation for software-module testing. Journal of Systems and Software 1997; 37 (2): 129-139.
-
(1997)
Journal of Systems and Software
, vol.37
, Issue.2
, pp. 129-139
-
-
Leung, Y.W.1
|