메뉴 건너뛰기




Volumn 38, Issue 7, 2011, Pages 8597-8606

The development of a construction cost prediction model with improved prediction capacity using the advanced CBR approach

Author keywords

Construction costs; Housing; Neural networks; Optimization; Regression analysis

Indexed keywords

ARTIFICIAL NEURAL NETWORK; ATTRIBUTE SIMILARITY; ATTRIBUTE WEIGHT; CASE SELECTIONS; CBR; CONSTRUCTION COSTS; CONSTRUCTION PROJECTS; EASE OF USE; HOUSING PROJECTS; MICROSOFT; MULTIPLE REGRESSION ANALYSIS; OPTIMIZATION PARAMETER; OPTIMIZATION PROCESS; PREDICTION METHODOLOGY; SIGNIFICANT IMPACTS; TOLERANCE RANGE; UNCERTAIN INFORMATIONS; VISUAL BASIC APPLICATION;

EID: 79952443537     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2011.01.063     Document Type: Article
Times cited : (68)

References (17)
  • 1
    • 0033156950 scopus 로고    scopus 로고
    • Comparison of case-based reasoning and artificial neural networks
    • D. Arditi, and O. Tokdemir Comparison of case-based reasoning and artificial neural networks Journal of Computing in Civil Engineering 13 4 1999 162 169
    • (1999) Journal of Computing in Civil Engineering , vol.13 , Issue.4 , pp. 162-169
    • Arditi, D.1    Tokdemir, O.2
  • 2
    • 13944265044 scopus 로고    scopus 로고
    • Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(405)
    • M. Attalla, and T. Hegazy Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression Journal of Construction Engineering and Management 129 4 2003 405 411 (Pubitemid 40265454)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 405-411
    • Attalla, M.1    Hegazy, T.2
  • 3
    • 77953505890 scopus 로고    scopus 로고
    • Improving early estimates best practices guide
    • Construction Industry Institute (CII) Univ. of Texas, Austin, Tex.
    • Construction Industry Institute (CII), 1998. Improving early estimates best practices guide. Research report 131-11, Univ. of Texas, Austin, Tex.
    • (1998) Research Report 131-11
  • 4
    • 33748765247 scopus 로고    scopus 로고
    • Determining attribute weights in a CBR model for early cost prediction of structural systems
    • DOI 10.1061/(ASCE)0733-9364(2006)132:10(1092)
    • S.Z. Dogan, D. Arditi, and H.M. Gunaydin Determining attribute weights in a CBR model for early cost prediction of structural systems Journal of Construction Engineering and Management 132 10 2006 1092 1098 (Pubitemid 44410235)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.10 , pp. 1092-1098
    • Dogan, S.Z.1    Arditi, D.2    Murat Gunaydin, H.3
  • 5
    • 0033354365 scopus 로고    scopus 로고
    • Cost estimation during design step: Parametric method versus case based reasoning method
    • DOI 10.1007/s001700050147
    • P. Duverlie, and J.M. Castelain Cost estimation during design step: Parametric method versus case based reasoning method Advanced Manufacturing Technology 15 12 1999 895 906 (Pubitemid 30531741)
    • (1999) International Journal of Advanced Manufacturing Technology , vol.15 , Issue.12 , pp. 895-906
    • Duverlie, P.1    Castelain, J.M.2
  • 6
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • T. Hegazy, and A. Ayed Neural network model for parametric cost estimation of highway projects Journal of Construction Engineering and Management 124 3 1998 210 218 (Pubitemid 128562880)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 7
    • 77953485494 scopus 로고    scopus 로고
    • Comparing accuracy of prediction cost estimation using case-based reasoning and neural networks
    • G. Kim, S. Kim, and K. Kang Comparing accuracy of prediction cost estimation using case-based reasoning and neural networks Journal of Architectural Institute of Korea 20 5 2004 93 102
    • (2004) Journal of Architectural Institute of Korea , vol.20 , Issue.5 , pp. 93-102
    • Kim, G.1    Kim, S.2    Kang, K.3
  • 8
  • 9
    • 77956622658 scopus 로고    scopus 로고
    • A study on the development of a cost model based on the owner's decision making at the early stages of a construction project
    • C. Koo, T. Hong, C. Hyun, S. Park, and J. Seo A study on the development of a cost model based on the owner's decision making at the early stages of a construction project International Journal of Strategic Property Management 14 2 2010 121 137
    • (2010) International Journal of Strategic Property Management , vol.14 , Issue.2 , pp. 121-137
    • Koo, C.1    Hong, T.2    Hyun, C.3    Park, S.4    Seo, J.5
  • 10
    • 77953512513 scopus 로고    scopus 로고
    • Korea Institute of Construction Technology (KICT) Gyeonggi, Korea
    • Korea Institute of Construction Technology (KICT), (2007). In Lee, Y. (Ed.), Construction cost index handbook. Gyeonggi, Korea.
    • (2007) Construction Cost Index Handbook
    • Lee, Y.1
  • 12
    • 33745325166 scopus 로고    scopus 로고
    • Predicting construction cost using multiple regression techniques
    • DOI 10.1061/(ASCE)0733-9364(2006)132:7(750), 002607QCO
    • D.J. Lowe, M.W. Emsley, and A. Harding Predicting construction cost using multiple regression techniques Journal of Construction Engineering and Management 132 7 2006 750 758 (Pubitemid 43932181)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 750-758
    • Lowe, D.J.1    Emsley, M.W.2    Harding, A.3
  • 13
    • 0000011632 scopus 로고    scopus 로고
    • Case-based reasoning: Expectations and results
    • Case-based reasoning: Experiences
    • W. Mark, E. Simoudis, and D. Hinkle Case-based reasoning: Expectations and results D.B. Leake, Case-based reasoning: Experiences Lessons, and future directions 1996 AAAI Press/MIT Press Cambridge, MA
    • (1996) Lessons, and Future Directions
    • Mark, W.1    Simoudis, E.2    Hinkle, D.3
  • 16
    • 8644243809 scopus 로고    scopus 로고
    • Conceptual cost estimation of building projects with regression analysis and neural networks
    • S. Rifat Conceptual cost estimation of building projects with regression analysis and neural networks Canadian Journal of Civil Engineering 31 2 2004 677 683
    • (2004) Canadian Journal of Civil Engineering , vol.31 , Issue.2 , pp. 677-683
    • Rifat, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.