메뉴 건너뛰기




Volumn 31, Issue 4, 2004, Pages 677-683

Conceptual cost estimation of building projects with regression analysis and neural networks

Author keywords

Conceptual cost estimation; Neural networks; Range estimation; Regression analysis

Indexed keywords

COSTS; DATA ACQUISITION; DECISION MAKING; MATHEMATICAL MODELS; MODEL BUILDINGS; NEURAL NETWORKS; PARAMETER ESTIMATION; REGRESSION ANALYSIS;

EID: 8644243809     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L04-029     Document Type: Article
Times cited : (96)

References (12)
  • 1
    • 0036027027 scopus 로고    scopus 로고
    • Estimating the cost of capital projects: An empirical study of accuracy levels for municipal government projects
    • AbouRizk, S.M., Babey, G.M., and Karumanasseri, G. 2002. Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects. Canadian Journal of Civil Engineering, 29: 653-661.
    • (2002) Canadian Journal of Civil Engineering , vol.29 , pp. 653-661
    • AbouRizk, S.M.1    Babey, G.M.2    Karumanasseri, G.3
  • 2
    • 8644262601 scopus 로고    scopus 로고
    • Confidence intervals and prediction intervals for feed-forward neural networks
    • Edited by R. Dybowski and V. Gant. Cambridge University Press, Cambridge, UK
    • Dybowski, R., and Roberts, S.J. 2001. Confidence intervals and prediction intervals for feed-forward neural networks. In Clinical applications of artificial neural networks. Edited by R. Dybowski and V. Gant. Cambridge University Press, Cambridge, UK. pp. 298-327.
    • (2001) Clinical Applications of Artificial Neural Networks , pp. 298-327
    • Dybowski, R.1    Roberts, S.J.2
  • 3
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • Hegazy, T., and Ayed, A. 1998. Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3): 210-218.
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 4
    • 8644292857 scopus 로고    scopus 로고
    • Multiple simulation analysis for probabilistic cost and schedule integration
    • Isidore, J.L., and Back, W.E. 2002. Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3): 211-219.
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.3 , pp. 211-219
    • Isidore, J.L.1    Back, W.E.2
  • 7
    • 0016317024 scopus 로고
    • Predesign cost-estimation function for buildings
    • ASCE
    • Kouskoulas, V., and Koehn, E. 1974. Predesign cost-estimation function for buildings. Journal of the Construction Division, ASCE, 100 C04): 589-604.
    • (1974) Journal of the Construction Division , vol.100 , Issue.C04 , pp. 589-604
    • Kouskoulas, V.1    Koehn, E.2
  • 9
    • 0000646059 scopus 로고
    • Learning internal representations by error propagation
    • Foundations. Edited by D.E. Rumelhart and J.L. McClelland. MIT Press, Cambridge, Mass. Chapt. 8
    • Rumelhart, D.E., Hinton, G.E., and Williams, R.J. 1986. Learning internal representations by error propagation. In Parallel distributed processing. Vol. 1. Foundations. Edited by D.E. Rumelhart and J.L. McClelland. MIT Press, Cambridge, Mass. Chapt. 8.
    • (1986) Parallel Distributed Processing , vol.1
    • Rumelhart, D.E.1    Hinton, G.E.2    Williams, R.J.3
  • 11
    • 0027560002 scopus 로고
    • Probabilistic cost estimation with subjective correlations
    • Touran, A. 1993. Probabilistic cost estimation with subjective correlations. Journal of Construction Engineering and Management, 119 1): 58-71.
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.1 , pp. 58-71
    • Touran, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.