메뉴 건너뛰기




Volumn , Issue , 2010, Pages 1628-1636

On the impact of SmartGrid metering infrastructure on load forecasting

Author keywords

[No Author keywords available]

Indexed keywords

ADVANCED METERING INFRASTRUCTURES; ELECTRICAL VEHICLES; FORECASTING TECHNIQUES; GENERATION DISPATCH; LOAD FORECASTING; LOAD PROFILES; POTENTIAL IMPACTS; POWER SYSTEMS; SMART GRID; SMART METERING; STATISTICAL INFORMATION;

EID: 79952417104     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ALLERTON.2010.5707109     Document Type: Conference Paper
Times cited : (19)

References (24)
  • 2
    • 0023563676 scopus 로고
    • Short-term load forecasting
    • dec.
    • G. Gross and F. Galiana, "Short-term load forecasting," Proceedings of the IEEE, vol. 75, no. 12, pp. 1558-1573, dec. 1987.
    • (1987) Proceedings of the IEEE , vol.75 , Issue.12 , pp. 1558-1573
    • Gross, G.1    Galiana, F.2
  • 3
    • 0029356764 scopus 로고
    • Implementation of hybrid short-term load forecasting system using artificial neural networks and fuzzy expert systems
    • aug
    • K.-H. Kim, J.-K. Park, K.-J. Hwang, and S.-H. Kim, "Implementation of hybrid short-term load forecasting system using artificial neural networks and fuzzy expert systems," Power Systems, IEEE Transactions on, vol. 10, no. 3, pp. 1534-1539, aug 1995.
    • (1995) Power Systems, IEEE Transactions on , vol.10 , Issue.3 , pp. 1534-1539
    • Kim, K.-H.1    Park, J.-K.2    Hwang, K.-J.3    Kim, S.-H.4
  • 4
    • 0023399788 scopus 로고
    • Adaptive weather-sensitive short term load forecast
    • aug.
    • R. Campo and P. Ruiz, "Adaptive weather-sensitive short term load forecast," Power Systems, IEEE Transactions on, vol. 2, no. 3, pp. 592-598, aug. 1987.
    • (1987) Power Systems, IEEE Transactions on , vol.2 , Issue.3 , pp. 592-598
    • Campo, R.1    Ruiz, P.2
  • 6
    • 0043246006 scopus 로고    scopus 로고
    • Short-term electricity demand forecasting using double seasonal exponential smoothing
    • J. W. Taylor, "Short-term electricity demand forecasting using double seasonal exponential smoothing," J. Oper. Res. Soc., vol. 54, no. 8, pp. 799-805, 2003.
    • (2003) J. Oper. Res. Soc. , vol.54 , Issue.8 , pp. 799-805
    • Taylor, J.W.1
  • 7
    • 0037505508 scopus 로고    scopus 로고
    • Short-term load forecasting via arma model identification including non-gaussian process considerations
    • may
    • S.-J. Huang and K.-R. Shih, "Short-term load forecasting via arma model identification including non-gaussian process considerations," Power Systems, IEEE Transactions on, vol. 18, no. 2, pp. 673-679, may 2003.
    • (2003) Power Systems, IEEE Transactions on , vol.18 , Issue.2 , pp. 673-679
    • Huang, S.-J.1    Shih, K.-R.2
  • 8
    • 0028424925 scopus 로고
    • A real-time implementation of short-term load forecasting for distribution power systems
    • may
    • J. Fan and J. McDonald, "A real-time implementation of short-term load forecasting for distribution power systems," Power Systems, IEEE Transactions on, vol. 9, no. 2, pp. 988-994, may 1994.
    • (1994) Power Systems, IEEE Transactions on , vol.9 , Issue.2 , pp. 988-994
    • Fan, J.1    McDonald, J.2
  • 10
    • 0023399522 scopus 로고
    • The time series approach to short term load forecasting
    • aug.
    • M. T. Hagan and S. M. Behr, "The time series approach to short term load forecasting," Power Systems, IEEE Transactions on, vol. 2, no. 3, pp. 785-791, aug. 1987.
    • (1987) Power Systems, IEEE Transactions on , vol.2 , Issue.3 , pp. 785-791
    • Hagan, M.T.1    Behr, S.M.2
  • 13
    • 67651093787 scopus 로고    scopus 로고
    • Analysis of cascading failure in electric grid based on power flow entropy
    • Aug.
    • Z. J. Bao, Y. J. Cao, G. Z. Wang, and L. J. Ding, "Analysis of cascading failure in electric grid based on power flow entropy," Physics Letters A, vol. 373, pp. 3032-3040, Aug. 2009.
    • (2009) Physics Letters A , vol.373 , pp. 3032-3040
    • Bao, Z.J.1    Cao, Y.J.2    Wang, G.Z.3    Ding, L.J.4
  • 14
    • 0036924741 scopus 로고    scopus 로고
    • Critical Points and Transitions in An Electric Power Transmission Model for Cascading Failure Blackouts
    • L. V. D. I. Carreras, B.A. and D. Newman, "Critical Points And Transitions In An Electric Power Transmission Model For Cascading Failure Blackouts," Chaos, vol. 12, no. 4, pp. 985-994, 2002.
    • (2002) Chaos , vol.12 , Issue.4 , pp. 985-994
    • Carreras, L.V.D.I.1    A, B.2    Newman, D.3
  • 16
    • 0033079737 scopus 로고    scopus 로고
    • A review of selected optimal power flow literature to 1993. i. nonlinear and quadratic programming approaches
    • feb.
    • J. Momoh, R. Adapa, and M. El-Hawary, "A review of selected optimal power flow literature to 1993. i. nonlinear and quadratic programming approaches," Power Systems, IEEE Transactions on, vol. 14, no. 1, pp. 96-104, feb. 1999.
    • (1999) Power Systems, IEEE Transactions on , vol.14 , Issue.1 , pp. 96-104
    • Momoh, J.1    Adapa, R.2    El-Hawary, M.3
  • 19
    • 0000594892 scopus 로고
    • The Physics of the Mt/G/infty Queue
    • S. G. Eick, W. A. Massey, and W. Whitt, "The Physics of the Mt/G/infty Queue," Operations Research, vol. 41, no. 4, pp. 731-742, 1993.
    • (1993) Operations Research , vol.41 , Issue.4 , pp. 731-742
    • Eick, S.G.1    Massey, W.A.2    Whitt, W.3
  • 20
    • 0022023316 scopus 로고
    • The renewal-process stationary-excess operator
    • [Online]. Available
    • W. Whitt, "The renewal-process stationary-excess operator," Journal of Applied Probability, vol. 22, no. 1, pp. 156-167, 1985. [Online]. Available: http://www.jstor.org/stable/3213755
    • (1985) Journal of Applied Probability , vol.22 , Issue.1 , pp. 156-167
    • Whitt, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.