-
1
-
-
0032682389
-
Scheduling with time dependent processing times: Review and extensions
-
Alidaee B and Womer NK (1999). Scheduling with time dependent processing times: Review and extensions. J Opl Res Soc 50: 711-720.
-
(1999)
J Opl Res Soc
, vol.50
, pp. 711-720
-
-
Alidaee, B.1
Womer, N.K.2
-
2
-
-
0024480571
-
Simultaneous minimization of mean and variation of flow-time and waiting time in single machine systems
-
Bagchi UB (1989). Simultaneous minimization of mean and variation of flow-time and waiting time in single machine systems. Opns Res 37: 118-125.
-
(1989)
Opns Res
, vol.37
, pp. 118-125
-
-
Bagchi, U.B.1
-
3
-
-
0141859880
-
A concise survey of scheduling with time-dependent processing times
-
Cheng TCE, Ding Q and Lin BMT (2004a). A concise survey of scheduling with time-dependent processing times. Eur J Opl Res 152: 1-13.
-
(2004)
Eur J Opl Res
, vol.152
, pp. 1-13
-
-
Tce, C.1
Ding, Q.2
Bmt, L.3
-
4
-
-
2342656496
-
Due-date assignment and single machine scheduling with deteriorating jobs
-
Cheng TCE, Kang LY and Ng CT (2004b). Due-date assignment and single machine scheduling with deteriorating jobs. J Opl Res Soc 55: 198-203.
-
(2004)
J Opl Res Soc
, vol.55
, pp. 198-203
-
-
Tce, C.1
Kang, L.Y.2
Ng, C.T.3
-
6
-
-
34547359924
-
Due-date assignment and parallel-machine scheduling with deteriorating jobs
-
DOI 10.1057/palgrave.jors.2602225, PII 2602225
-
Cheng TCE, Kang LY and Ng CT (2007). Due-date assignment and parallel-machine scheduling with deteriorating jobs. J Opl Res Soc 58: 1103-1108. (Pubitemid 47150130)
-
(2007)
Journal of the Operational Research Society
, vol.58
, Issue.8
, pp. 1103-1108
-
-
Cheng, T.C.E.1
Kang, L.Y.2
Ng, C.T.3
-
8
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
Graham RL, Lawler EL, Lenstra JK and Rinnooy Kan AHG (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Ann Discrete Math 5: 287-326.
-
(1979)
Ann Discrete Math
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Kan Ahg, R.4
-
9
-
-
35748982093
-
Multi-machine scheduling with deteriorating jobs and scheduled maintenance
-
DOI 10.1016/j.apm.2006.12.008, PII S0307904X06003222
-
Lee W-C and Wu C-C (2008). Multi-machine scheduling with deteriorating jobs and scheduled maintenance. Appl Math Model 32: 362-373. (Pubitemid 350048540)
-
(2008)
Applied Mathematical Modelling
, vol.32
, Issue.3
, pp. 362-373
-
-
Lee, W.-C.1
Wu, C.-C.2
-
10
-
-
38849195606
-
Scheduling deteriorating jobs on a single machine with release times
-
DOI 10.1016/j.cie.2007.08.006, PII S0360835207001970
-
Lee W-C, Wu C-C and Chung Y-H (2008a). Scheduling deteriorating jobs on a single machine with release times. Comput Indust Eng 54: 441-452. (Pubitemid 351199797)
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.3
, pp. 441-452
-
-
Lee, W.-C.1
Wu, C.-C.2
Chung, Y.-H.3
-
11
-
-
41449117952
-
A two-machine flowshop makespan scheduling problem with deteriorating jobs
-
DOI 10.1016/j.cie.2007.10.010, PII S0360835207002276
-
Lee W-C, Wu C-C, Wen C-C and Chung Y-H (2008b). A two-machine flowshop makespan scheduling problem with deteriorating jobs. Comput Indust Eng 54: 737-749. (Pubitemid 351458376)
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.4
, pp. 737-749
-
-
Lee, W.-C.1
Wu, C.-C.2
Wen, C.-C.3
Chung, Y.-H.4
-
12
-
-
56549093708
-
Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates
-
Lee W-C, Wu C-C, Chung Y-H and Liu H-C (2009). Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates. Comput Opns Res 36: 2111-2121.
-
(2009)
Comput Opns Res
, vol.36
, pp. 2111-2121
-
-
Lee, W.-C.1
Wu, C.-C.2
Chung, Y.-H.3
Liu, H.-C.4
-
13
-
-
0028463787
-
Scheduling jobs under simple linear deterioration
-
Mosheiov G (1994). Scheduling jobs under simple linear deterioration. Comput Opns Res 21: 653-659.
-
(1994)
Comput Opns Res
, vol.21
, pp. 653-659
-
-
Mosheiov, G.1
-
14
-
-
35348985359
-
Single machine scheduling with simple linear deterioration to minimize total absolute deviation of completion times
-
DOI 10.1016/j.cor.2006.10.010, PII S0305054806002590
-
Oron D (2008). Single machine scheduling with simple linear deterioration to minimize total absolute deviation of completion times. Comput Opns Res 35: 2071-2078. (Pubitemid 47615243)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.6
, pp. 2071-2078
-
-
Oron, D.1
-
15
-
-
54049088245
-
Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
-
Tang L and Liu P (2009). Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration. Appl Math Model 33: 1187-1199.
-
(2009)
Appl Math Model
, vol.33
, pp. 1187-1199
-
-
Tang, L.1
Liu, P.2
-
16
-
-
49649118743
-
Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: A mixed nonlinear integer programming approach
-
Toksari MD and Güner E (2008). Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: A mixed nonlinear integer programming approach. Int J Adv Manuf Technol 38: 801-808.
-
(2008)
Int J Adv Manuf Technol
, vol.38
, pp. 801-808
-
-
Toksari, M.D.1
Güner, E.2
-
17
-
-
33748318134
-
Minimizing total completion time in a two-machine flow shop with deteriorating jobs
-
DOI 10.1016/j.amc.2005.11.162, PII S0096300305011124
-
Wang J-B, Ng CT, Cheng TCE and Liu LL (2006). Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Appl Math Comput 180: 185-193. (Pubitemid 44331335)
-
(2006)
Applied Mathematics and Computation
, vol.180
, Issue.1
, pp. 185-193
-
-
Wang, J.-B.1
Daniel Ng, C.T.2
Cheng, T.C.E.3
Liu, L.-L.4
-
18
-
-
14644427717
-
Scheduling jobs under decreasing linear deterioration
-
DOI 10.1016/j.ipl.2004.12.018, PII S0020019004003825
-
Wang J-B and Xia Z-Q (2005). Scheduling jobs under decreasing linear deterioration. Inform Process Lett 94: 63-69. (Pubitemid 40308673)
-
(2005)
Information Processing Letters
, vol.94
, Issue.2
, pp. 63-69
-
-
Wang, J.-B.1
Xia, Z.-Q.2
-
19
-
-
27844604203
-
Flow shop scheduling with deteriorating jobs under dominating machines
-
DOI 10.1016/j.omega.2004.10.006, PII S0305048304001574
-
Wang J-B and Xia Z-Q (2006a). Flow shop scheduling with deteriorating jobs under dominating machines. Omega 34: 327-336. (Pubitemid 41644493)
-
(2006)
Omega
, vol.34
, Issue.4
, pp. 327-336
-
-
Wang, J.-B.1
Xia, Z.-Q.2
-
20
-
-
31444438076
-
Flow shop scheduling problems with deteriorating jobs under dominating machines
-
DOI 10.1016/j.fishres.2005.08.011, PII 2601959
-
Wang J-B and Xia Z-Q (2006b). Flow shop scheduling problems with deteriorating jobs under dominating machines. J Opl Res Soc 57: 220-226. (Pubitemid 43149286)
-
(2006)
Journal of the Operational Research Society
, vol.57
, Issue.2
, pp. 220-226
-
-
Wang, J.-B.1
Xia, Z.-Q.2
-
21
-
-
49049105854
-
Single-machine group scheduling problems with deteriorating setup times and job processing times
-
Wu C-C and Lee W-C (2008). Single-machine group scheduling problems with deteriorating setup times and job processing times. Int J Prod Econ 115(1): 128-133.
-
(2008)
Int J Prod Econ
, vol.115
, Issue.1
, pp. 128-133
-
-
Wu, C.-C.1
Lee, W.-C.2
-
22
-
-
34748855553
-
Single-machine group scheduling problems with deterioration consideration
-
DOI 10.1016/j.cor.2006.09.008, PII S0305054806002206, Algorithms and Computational Methods in Feasibility and Infeasibility
-
Wu C-C, Shiau Y-R and Lee W-C (2008). Single-machine group scheduling problems with deterioration consideration. Comput Opns Res 35: 1652-1659. (Pubitemid 47488636)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.5
, pp. 1652-1659
-
-
Wu, C.-C.1
Shiau, Y.-R.2
Lee, W.-C.3
|