메뉴 건너뛰기




Volumn 62, Issue 4, 2011, Pages 768-775

Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs

Author keywords

deteriorating jobs; heuristic algorithm; scheduling; single machine; total absolute differences in waiting times

Indexed keywords

DETERIORATION; HEURISTIC ALGORITHMS; JOB SHOP SCHEDULING; MACHINERY; OPTIMIZATION; SCHEDULING;

EID: 79952377820     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.2010.26     Document Type: Article
Times cited : (20)

References (22)
  • 1
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • Alidaee B and Womer NK (1999). Scheduling with time dependent processing times: Review and extensions. J Opl Res Soc 50: 711-720.
    • (1999) J Opl Res Soc , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 2
    • 0024480571 scopus 로고
    • Simultaneous minimization of mean and variation of flow-time and waiting time in single machine systems
    • Bagchi UB (1989). Simultaneous minimization of mean and variation of flow-time and waiting time in single machine systems. Opns Res 37: 118-125.
    • (1989) Opns Res , vol.37 , pp. 118-125
    • Bagchi, U.B.1
  • 3
    • 0141859880 scopus 로고    scopus 로고
    • A concise survey of scheduling with time-dependent processing times
    • Cheng TCE, Ding Q and Lin BMT (2004a). A concise survey of scheduling with time-dependent processing times. Eur J Opl Res 152: 1-13.
    • (2004) Eur J Opl Res , vol.152 , pp. 1-13
    • Tce, C.1    Ding, Q.2    Bmt, L.3
  • 4
    • 2342656496 scopus 로고    scopus 로고
    • Due-date assignment and single machine scheduling with deteriorating jobs
    • Cheng TCE, Kang LY and Ng CT (2004b). Due-date assignment and single machine scheduling with deteriorating jobs. J Opl Res Soc 55: 198-203.
    • (2004) J Opl Res Soc , vol.55 , pp. 198-203
    • Tce, C.1    Kang, L.Y.2    Ng, C.T.3
  • 6
    • 34547359924 scopus 로고    scopus 로고
    • Due-date assignment and parallel-machine scheduling with deteriorating jobs
    • DOI 10.1057/palgrave.jors.2602225, PII 2602225
    • Cheng TCE, Kang LY and Ng CT (2007). Due-date assignment and parallel-machine scheduling with deteriorating jobs. J Opl Res Soc 58: 1103-1108. (Pubitemid 47150130)
    • (2007) Journal of the Operational Research Society , vol.58 , Issue.8 , pp. 1103-1108
    • Cheng, T.C.E.1    Kang, L.Y.2    Ng, C.T.3
  • 8
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham RL, Lawler EL, Lenstra JK and Rinnooy Kan AHG (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Ann Discrete Math 5: 287-326.
    • (1979) Ann Discrete Math , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Kan Ahg, R.4
  • 9
    • 35748982093 scopus 로고    scopus 로고
    • Multi-machine scheduling with deteriorating jobs and scheduled maintenance
    • DOI 10.1016/j.apm.2006.12.008, PII S0307904X06003222
    • Lee W-C and Wu C-C (2008). Multi-machine scheduling with deteriorating jobs and scheduled maintenance. Appl Math Model 32: 362-373. (Pubitemid 350048540)
    • (2008) Applied Mathematical Modelling , vol.32 , Issue.3 , pp. 362-373
    • Lee, W.-C.1    Wu, C.-C.2
  • 10
    • 38849195606 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs on a single machine with release times
    • DOI 10.1016/j.cie.2007.08.006, PII S0360835207001970
    • Lee W-C, Wu C-C and Chung Y-H (2008a). Scheduling deteriorating jobs on a single machine with release times. Comput Indust Eng 54: 441-452. (Pubitemid 351199797)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.3 , pp. 441-452
    • Lee, W.-C.1    Wu, C.-C.2    Chung, Y.-H.3
  • 11
    • 41449117952 scopus 로고    scopus 로고
    • A two-machine flowshop makespan scheduling problem with deteriorating jobs
    • DOI 10.1016/j.cie.2007.10.010, PII S0360835207002276
    • Lee W-C, Wu C-C, Wen C-C and Chung Y-H (2008b). A two-machine flowshop makespan scheduling problem with deteriorating jobs. Comput Indust Eng 54: 737-749. (Pubitemid 351458376)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 737-749
    • Lee, W.-C.1    Wu, C.-C.2    Wen, C.-C.3    Chung, Y.-H.4
  • 12
    • 56549093708 scopus 로고    scopus 로고
    • Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates
    • Lee W-C, Wu C-C, Chung Y-H and Liu H-C (2009). Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates. Comput Opns Res 36: 2111-2121.
    • (2009) Comput Opns Res , vol.36 , pp. 2111-2121
    • Lee, W.-C.1    Wu, C.-C.2    Chung, Y.-H.3    Liu, H.-C.4
  • 13
    • 0028463787 scopus 로고
    • Scheduling jobs under simple linear deterioration
    • Mosheiov G (1994). Scheduling jobs under simple linear deterioration. Comput Opns Res 21: 653-659.
    • (1994) Comput Opns Res , vol.21 , pp. 653-659
    • Mosheiov, G.1
  • 14
    • 35348985359 scopus 로고    scopus 로고
    • Single machine scheduling with simple linear deterioration to minimize total absolute deviation of completion times
    • DOI 10.1016/j.cor.2006.10.010, PII S0305054806002590
    • Oron D (2008). Single machine scheduling with simple linear deterioration to minimize total absolute deviation of completion times. Comput Opns Res 35: 2071-2078. (Pubitemid 47615243)
    • (2008) Computers and Operations Research , vol.35 , Issue.6 , pp. 2071-2078
    • Oron, D.1
  • 15
    • 54049088245 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
    • Tang L and Liu P (2009). Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration. Appl Math Model 33: 1187-1199.
    • (2009) Appl Math Model , vol.33 , pp. 1187-1199
    • Tang, L.1    Liu, P.2
  • 16
    • 49649118743 scopus 로고    scopus 로고
    • Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: A mixed nonlinear integer programming approach
    • Toksari MD and Güner E (2008). Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: A mixed nonlinear integer programming approach. Int J Adv Manuf Technol 38: 801-808.
    • (2008) Int J Adv Manuf Technol , vol.38 , pp. 801-808
    • Toksari, M.D.1    Güner, E.2
  • 17
    • 33748318134 scopus 로고    scopus 로고
    • Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    • DOI 10.1016/j.amc.2005.11.162, PII S0096300305011124
    • Wang J-B, Ng CT, Cheng TCE and Liu LL (2006). Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Appl Math Comput 180: 185-193. (Pubitemid 44331335)
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 185-193
    • Wang, J.-B.1    Daniel Ng, C.T.2    Cheng, T.C.E.3    Liu, L.-L.4
  • 18
    • 14644427717 scopus 로고    scopus 로고
    • Scheduling jobs under decreasing linear deterioration
    • DOI 10.1016/j.ipl.2004.12.018, PII S0020019004003825
    • Wang J-B and Xia Z-Q (2005). Scheduling jobs under decreasing linear deterioration. Inform Process Lett 94: 63-69. (Pubitemid 40308673)
    • (2005) Information Processing Letters , vol.94 , Issue.2 , pp. 63-69
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 19
    • 27844604203 scopus 로고    scopus 로고
    • Flow shop scheduling with deteriorating jobs under dominating machines
    • DOI 10.1016/j.omega.2004.10.006, PII S0305048304001574
    • Wang J-B and Xia Z-Q (2006a). Flow shop scheduling with deteriorating jobs under dominating machines. Omega 34: 327-336. (Pubitemid 41644493)
    • (2006) Omega , vol.34 , Issue.4 , pp. 327-336
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 20
    • 31444438076 scopus 로고    scopus 로고
    • Flow shop scheduling problems with deteriorating jobs under dominating machines
    • DOI 10.1016/j.fishres.2005.08.011, PII 2601959
    • Wang J-B and Xia Z-Q (2006b). Flow shop scheduling problems with deteriorating jobs under dominating machines. J Opl Res Soc 57: 220-226. (Pubitemid 43149286)
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.2 , pp. 220-226
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 21
    • 49049105854 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deteriorating setup times and job processing times
    • Wu C-C and Lee W-C (2008). Single-machine group scheduling problems with deteriorating setup times and job processing times. Int J Prod Econ 115(1): 128-133.
    • (2008) Int J Prod Econ , vol.115 , Issue.1 , pp. 128-133
    • Wu, C.-C.1    Lee, W.-C.2
  • 22
    • 34748855553 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deterioration consideration
    • DOI 10.1016/j.cor.2006.09.008, PII S0305054806002206, Algorithms and Computational Methods in Feasibility and Infeasibility
    • Wu C-C, Shiau Y-R and Lee W-C (2008). Single-machine group scheduling problems with deterioration consideration. Comput Opns Res 35: 1652-1659. (Pubitemid 47488636)
    • (2008) Computers and Operations Research , vol.35 , Issue.5 , pp. 1652-1659
    • Wu, C.-C.1    Shiau, Y.-R.2    Lee, W.-C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.