메뉴 건너뛰기




Volumn , Issue , 2010, Pages 133-142

Search-based resource scheduling for bug fixing tasks

Author keywords

[No Author keywords available]

Indexed keywords

BUG-FIXING; DATA SETS; DEMAND RESOURCES; FITNESS VALUES; HILL CLIMBING; HILL CLIMBING ALGORITHMS; HUMAN RESOURCES; MATCHING METHODS; MULTI OBJECTIVE; PROJECT MANAGERS; RESOURCE-SCHEDULING; SCHEDULING METHODS; SEARCH ALGORITHMS; SEARCH-BASED; SKILL REQUIREMENTS;

EID: 79952053760     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SSBSE.2010.24     Document Type: Conference Paper
Times cited : (13)

References (24)
  • 3
    • 68549087126 scopus 로고    scopus 로고
    • Pavlov's bugs: Matching repair policies with rewards
    • P. Laplante and N. Ahmad, "Pavlov's bugs: Matching repair policies with rewards," IT Professional, vol. 11, no. 4, 2009.
    • (2009) IT Professional , vol.11 , Issue.4
    • Laplante, P.1    Ahmad, N.2
  • 4
    • 0003859315 scopus 로고    scopus 로고
    • Ph.D. dissertation, Dept. of Mechanical Eng., Massachusetts Institute of Technology, USA
    • M. B. Wall, "A GA for resource-constrained scheduling," Ph.D. dissertation, Dept. of Mechanical Eng., Massachusetts Institute of Technology, USA, 1996.
    • (1996) A GA for Resource-constrained Scheduling
    • Wall, M.B.1
  • 5
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • L. Ozdamar and G. Ulusoy, "A survey on the resource-constrained project scheduling problem," IIE Transactions, vol. 27, pp. 574-586, 1995.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 9
    • 33947217417 scopus 로고    scopus 로고
    • SW project management with GAs
    • E. Alba and J. Chicano, "SW project management with GAs," Information Sciences, vol. 177, no. 11, pp. 2380-2401, 2007.
    • (2007) Information Sciences , vol.177 , Issue.11 , pp. 2380-2401
    • Alba, E.1    Chicano, J.2
  • 10
    • 49549099773 scopus 로고    scopus 로고
    • Timeline based model for SW proj. scheduling with genetic algorithms
    • C. Chang, H. Jiang, Y. Di, D. Zhu, and Y. Ge, "Timeline based model for SW proj. scheduling with genetic algorithms," IST, vol. 50, no. 11, pp. 1142-1154, 2008.
    • (2008) IST , vol.50 , Issue.11 , pp. 1142-1154
    • Chang, C.1    Jiang, H.2    Di, Y.3    Zhu, D.4    Ge, Y.5
  • 18
    • 33644657610 scopus 로고    scopus 로고
    • SW defect association mining and defect correction effort prediction
    • Q. Song, M. Shepperd, M. Cartwright, and C. Mair, "SW defect association mining and defect correction effort prediction," IEEE Trans. on SW Eng., vol. 32, no. 2, 2006.
    • (2006) IEEE Trans. on SW Eng. , vol.32 , Issue.2
    • Song, Q.1    Shepperd, M.2    Cartwright, M.3    Mair, C.4
  • 20
    • 79952058661 scopus 로고    scopus 로고
    • Last checked 21 Mar 2010
    • "Bugzilla - A bug tracking tool." http://www.bugzilla.org/, Last checked 21 Mar 2010.
    • Bugzilla - A Bug Tracking Tool
  • 22
    • 57849128963 scopus 로고    scopus 로고
    • A constraint-driven human resource scheduling method in software development and maintenance process
    • IEEE
    • J. Xiao, Q. Wang, M. Li, Y. Yang, F. Zhang, and L. Xie, "A constraint-driven human resource scheduling method in software development and maintenance process," in 24th IEEE Int. Conf. on SW Maintenance. IEEE, 2008.
    • (2008) 24th IEEE Int. Conf. on SW Maintenance
    • Xiao, J.1    Wang, Q.2    Li, M.3    Yang, Y.4    Zhang, F.5    Xie, L.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.