메뉴 건너뛰기




Volumn 28, Issue 2, 2011, Pages 91-101

Bicriteria supply chain scheduling on unrelated-parallel machines

Author keywords

bicriteria scheduling; sequence dependent setups; supply chain; unrelated parallel machines

Indexed keywords

ALGORITHMIC SOLUTIONS; BI-CRITERIA; BICRITERIA SCHEDULING; CUSTOMER SERVICE LEVELS; MACHINE AVAILABILITY; METASEARCH; NP-HARD; OPTIMAL SOLUTIONS; PARALLEL MACHINE; PARALLEL MACHINE-SCHEDULING PROBLEMS; RESEARCH PROBLEMS; SCHEDULING PROBLEM; SEARCH ALGORITHMS; SEQUENCE-DEPENDENT SETUP TIME; SEQUENCE-DEPENDENT SETUPS; SUPPLY CHAIN SCHEDULING; UNRELATED-PARALLEL MACHINES; WORK-IN-PROCESS INVENTORY;

EID: 79551706353     PISSN: 10170669     EISSN: 21517606     Source Type: Journal    
DOI: 10.1080/10170669.2010.546165     Document Type: Article
Times cited : (17)

References (19)
  • 1
    • 0032628095 scopus 로고    scopus 로고
    • Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
    • Azizoglu, M. and O. Kirca,"Scheduling jobs on unrelated parallel machines to minimize regular total cost functions," IIE Transactions, 31, 153-159 (1999).
    • (1999) IIE Transactions , vol.31 , pp. 153-159
    • Azizoglu, M.1    Kirca, O.2
  • 3
    • 38549131389 scopus 로고    scopus 로고
    • Supply chain scheduling: Conflict and cooperation in assembly systems
    • DOI 10.1287/opre.1070.0412
    • Chen, Z. and N. Hall,"Supply chain scheduling: conflict and cooperation in assembly systems," Operations Research, 55, 1072-1089 (2007). (Pubitemid 351159518)
    • (2007) Operations Research , vol.55 , Issue.6 , pp. 1072-1089
    • Chen, Z.-L.1    Hall, N.G.2
  • 4
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • DOI 10.1287/mnsc.1040.0325
    • Chen, Z. and G. Vairaktarakis,"Integrated scheduling of production and distribution operations," Management Science, 51, 614-628 (2005). (Pubitemid 41009656)
    • (2005) Management Science , vol.51 , Issue.4 , pp. 614-628
    • Chen, Z.-L.1    Vairaktarakis, G.L.2
  • 5
    • 0033161818 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling with bicriteria problem
    • Choua, F. and C. Lee,"Two-machine flowshop scheduling with bicriteria problem," Computers and Industrial Engineering, 36, 549-564 (1999). (Pubitemid 129304001)
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.3 , pp. 549-564
    • Chou, F.-D.1    Lee, C.-E.2
  • 7
    • 60349120916 scopus 로고    scopus 로고
    • A note on minimizing maximum lateness in an m-machine scheduling problem with a learning effect
    • Eren, T.,"A note on minimizing maximum lateness in an m-machine scheduling problem with a learning effect," Applied Mathematics and Computation, 209, 186-190 (2009).
    • (2009) Applied Mathematics and Computation , vol.209 , pp. 186-190
    • Eren, T.1
  • 8
    • 58849106666 scopus 로고    scopus 로고
    • Minimizing the total weighted completion time on a single machine scheduling with release dates and a learning effect
    • Eren, T.,"Minimizing the total weighted completion time on a single machine scheduling with release dates and a learning effect," Applied Mathematics and Computation, 208, 355-358 (2009).
    • (2009) Applied Mathematics and Computation , vol.208 , pp. 355-358
    • Eren, T.1
  • 9
    • 33747373886 scopus 로고    scopus 로고
    • A bicriteria scheduling with sequence-dependent setup times
    • DOI 10.1016/j.amc.2005.11.112, PII S0096300305010453
    • Eren, T. and E. Güner,"A bicriteria scheduling with sequence-dependent setup times," Applied Mathematics and Computation, 179, 378-385 (2006). (Pubitemid 44247123)
    • (2006) Applied Mathematics and Computation , vol.179 , Issue.1 , pp. 378-385
    • Eren, T.1    Guner, E.2
  • 11
    • 0037448810 scopus 로고    scopus 로고
    • Using genetic algorithms for single-machine bicriteria scheduling problems
    • DOI 10.1016/S0377-2217(02)00220-5, PII S0377221702002205
    • Koksalan, M. and A.B. Keha,"Using genetic algorithms for single-machine bicriteria scheduling problems," European Journal of Operational Research, 145, 543-556 (2003). (Pubitemid 35411805)
    • (2003) European Journal of Operational Research , vol.145 , Issue.3 , pp. 543-556
    • Koksalan, M.1    Keha, A.B.2
  • 12
    • 34047130624 scopus 로고    scopus 로고
    • Scheduling unrelated parallel machines with sequence-dependent setups
    • DOI 10.1016/j.cor.2006.02.006, PII S0305054806000438
    • Logendran, R., B. McDonell and B. Smucker,"Scheduling unrelated machines with sequence dependent setups," Computers and Operations Research, 34, 3420-3438 (2007). (Pubitemid 46517865)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3420-3438
    • Logendran, R.1    McDonell, B.2    Smucker, B.3
  • 13
    • 1642328443 scopus 로고    scopus 로고
    • Unrelated parallel machine scheduling with job splitting
    • Logendran, R. and F. Subur,"Unrelated parallel machine scheduling with job splitting," IIE Transactions, 36, 359-372 (2004).
    • (2004) IIE Transactions , vol.36 , pp. 359-372
    • Logendran, R.1    Subur, F.2
  • 17
    • 0029733044 scopus 로고    scopus 로고
    • Bicriteria scheduling problem for unrelated parallel machines
    • DOI 10.1016/0360-8352(95)00028-3
    • Suresh, V. and D. Chaudhuri,"Biciteria scheduling problem for unrelated parallel machines," Computers and Industrial Engineering, 30, 77-82 (1996). (Pubitemid 126397723)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.1 , pp. 77-82
    • Suresh, V.1    Chaudhuri, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.