Volumn 137, Issue 2, 2011, Pages 147-157

Impact of optimism bias regarding organizational dynamics on project planning and control

Author keywords

Organizations; Performance characteristics; Planning; Simulation; Systems engineering

Indexed keywords

CONSTRUCTION PLANNING; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; COST OVERRUNS; EXPLICIT METHOD; OPTIMISM BIAS; ORGANIZATIONAL DYNAMICS; ORGANIZATIONS; PERFORMANCE CHARACTERISTICS; PLANNING STAGES; PROJECT PLANNING; PROJECT PLANNING AND CONTROL; SCHEDULE DELAY; SIMULATION; STEPPING STONE; THEORETICAL FRAMEWORK; WHAT-IF;

EID: 78751548600     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000260     Document Type: Article
Times cited : (60)

References (46)
  • 2
    • 78751564990 scopus 로고    scopus 로고
    • 〈〉 (Dec. 18, 2008).
    • Allen, C. (2004). " Reducing uncertainty.." 〈 http://www.tfhrc.gov/pubrds/04jul/06.htm 〉 (Dec. 18, 2008).
    • (2004) Reducing Uncertainty
    • Allen, C.1
  • 5
    • 0012219224 scopus 로고    scopus 로고
    • Too many cooks spoil the profits: Investment club performance
    • 0015-198X, (),. 10.2469/faj.v56.n1.2326
    • Barber, B. M., and Odean, T. (2000). " Too many cooks spoil the profits: Investment club performance.." Financ. Anal. J. 0015-198X, 56 (1), 17-25. 10.2469/faj.v56.n1.2326
    • (2000) Financ. Anal. J. , vol.56 , Issue.1 , pp. 17-25
    • Barber, B.M.1    Odean, T.2
  • 7
    • 21844497186 scopus 로고
    • Exploring the "planning fallacy": Why people underestimate their task completion times
    • " 0022-3514, (),. 10.1037/0022-3514.67.3.366
    • Buehler, R., Griffin, D., and Ross, M. (1994). " Exploring the "planning fallacy": Why people underestimate their task completion times.." J. Pers. Soc. Psychol. 0022-3514, 67 (3), 366-381. 10.1037/0022-3514.67.3.366
    • (1994) J. Pers. Soc. Psychol. , vol.67 , Issue.3 , pp. 366-381
    • Buehler, R.1    Griffin, D.2    Ross, M.3
  • 8
    • 0030642456 scopus 로고    scopus 로고
    • Differences between entrepreneurs and managers in large organizations: Biases and heuristics in strategic decision-making
    • 0883-9026, (),. 10.1016/S0883-9026(96)00003-1
    • Busenitz, L. W., and Barney, J. B. (1997). " Differences between entrepreneurs and managers in large organizations: Biases and heuristics in strategic decision-making.." J. Bus. Venturing 0883-9026, 12 (1), 9-30. 10.1016/S0883-9026(96)00003-1
    • (1997) J. Bus. Venturing , vol.12 , Issue.1 , pp. 9-30
    • Busenitz, L.W.1    Barney, J.B.2
  • 11
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • 0092-2102, (),. 10.1287/inte.10.6.20
    • Cooper, K. G. (1980). " Naval ship production: A claim settled and a framework built.." Interfaces 0092-2102, 10 (6), 20-36. 10.1287/inte.10.6.20
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.G.1
  • 12
    • 1842773499 scopus 로고    scopus 로고
    • Structural properties of work groups and their consequences for performance
    • DOI 10.1016/S0378-8733(02)00049-7, PII S0378873302000497
    • Cummings, J. N., and Cross, R. (2003). " Structural properties of work groups and their consequences for performance.." Soc. Networks 0378-8733, 25 (3), 197-210. 10.1016/S0378-8733(02)00049-7 (Pubitemid 36831775)
    • (2003) Social Networks , vol.25 , Issue.3 , pp. 197-210
    • Cummings, J.N.1    Cross, R.2
  • 13
    • 0024711610 scopus 로고
    • The optimism bias and traffic accident risk perception
    • 0001-4575, (),. 10.1016/0001-4575(89)90024-9
    • DeJoy, D. M. (1989). " The optimism bias and traffic accident risk perception.." Accid. Anal Prev. 0001-4575, 21 (4), 333-340. 10.1016/0001-4575(89)90024-9
    • (1989) Accid. Anal Prev. , vol.21 , Issue.4 , pp. 333-340
    • Dejoy, D.M.1
  • 14
    • 5244300270 scopus 로고    scopus 로고
    • Parametric constraint management in planning and scheduling: Computational basis
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1997)123:3(348)
    • El-Bibany, H. (1997). " Parametric constraint management in planning and scheduling: Computational basis.." J. Constr. Eng. Manage. 0733-9364, 123 (3), 348-353. 10.1061/(ASCE)0733-9364(1997)123:3(348)
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 348-353
    • El-Bibany, H.1
  • 15
    • 58149404802 scopus 로고
    • Knowing with certainty: The appropriateness of extreme confidence
    • " 0096-1523, (),. 10.1037/0096-1523.3.4.552
    • Fischhoff, B., Slovic, P., and Lichtenstein, S. (1977). " Knowing with certainty: The appropriateness of extreme confidence.." J. Exp. Psychol. Hum. Percept. Perform. 0096-1523, 3 (4), 552-564. 10.1037/0096-1523.3. 4.552
    • (1977) J. Exp. Psychol. Hum. Percept. Perform. , vol.3 , Issue.4 , pp. 552-564
    • Fischhoff, B.1    Slovic, P.2    Lichtenstein, S.3
  • 16
    • 0000912804 scopus 로고    scopus 로고
    • Intra-organizational networks and performance: A review
    • " 1381-298X, (),. 10.1023/A:1009675906926
    • Flap, H., Bulder, B., and Volker, B. (1998). " Intra-organizational networks and performance: A review.." Comput. Math. Org. Theory 1381-298X, 4 (2), 109-147. 10.1023/A:1009675906926
    • (1998) Comput. Math. Org. Theory , vol.4 , Issue.2 , pp. 109-147
    • Flap, H.1    Bulder, B.2    Volker, B.3
  • 19
    • 0037242979 scopus 로고    scopus 로고
    • How common and how large are cost overruns in transport infrastructure projects?
    • DOI 10.1080/01441640309904
    • Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2003b). " How common and how large are cost overruns in transport infrastructure projects? " Transport Rev. 0033-8974, 23 (1), 71-88. 10.1080/01441640309904 (Pubitemid 36108766)
    • (2003) Transport Reviews , vol.23 , Issue.1 , pp. 71-88
    • Flyvbjerg, B.1    Holm, M.K.S.2    Buhl, S.L.3
  • 20
    • 0442328937 scopus 로고    scopus 로고
    • What causes cost overrun in transport infrastructure projects?
    • DOI 10.1080/0144164032000080494
    • Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2004). " What causes cost overrun in transport infrastructure projects?." Transport Rev. 0033-8974, 24 (1), 3-18. 10.1080/0144164032000080494 (Pubitemid 38187880)
    • (2004) Transport Reviews , vol.24 , Issue.1 , pp. 3-18
    • Flyvbjerg, B.1    Skamris Holm, M.K.2    Buhl, S.L.3
  • 21
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic modeling of product development processes
    • 0883-7066, (),. 10.1002/(SICI)1099-1727(199821) 14:1<31::AID- SDR141>3.0.CO;2-5
    • Ford, D. N., and Sterman, J. D. (1998). " Dynamic modeling of product development processes.." Syst. Dyn. Rev. 0883-7066, 14 (1), 31-68. 10.1002/(SICI)1099-1727(199821)14:1<31::AID-SDR141>3.0.CO;2-5
    • (1998) Syst. Dyn. Rev. , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.N.1    Sterman, J.D.2
  • 25
    • 58149417364 scopus 로고
    • On the psychology of prediction
    • 0033-295X, (),. 10.1037/h0034747
    • Kahneman, D., and Tversky, A. (1973). " On the psychology of prediction.." Psychol. Rev. 0033-295X, 80 (4), 237-251. 10.1037/h0034747
    • (1973) Psychol. Rev. , vol.80 , Issue.4 , pp. 237-251
    • Kahneman, D.1    Tversky, A.2
  • 27
    • 1642277111 scopus 로고    scopus 로고
    • Delusions of success
    • 0017-8012.
    • Lovallo, D., and Kahneman, D. (2003). " Delusions of success.." Harvard Bus. Rev. 0017-8012, 81 (7), 56-63.
    • (2003) Harvard Bus. Rev. , vol.81 , Issue.7 , pp. 56-63
    • Lovallo, D.1    Kahneman, D.2
  • 28
    • 3242876277 scopus 로고    scopus 로고
    • Project management under uncertainty: The impact of heuristics and biases
    • " 8756-9728.
    • McCray, G. E., Purvis, R. L., and McCray, C. G. (2002). " Project management under uncertainty: The impact of heuristics and biases.." Proj. Manage. J. 8756-9728, 33 (1), 49-57.
    • (2002) Proj. Manage. J. , vol.33 , Issue.1 , pp. 49-57
    • McCray, G.E.1    Purvis, R.L.2    McCray, C.G.3
  • 29
    • 33751270867 scopus 로고    scopus 로고
    • Conceptual planning process for electrical construction
    • DOI 10.1061/(ASCE)0733-9364(2006)132:12(1306), 003612QCO
    • Menches, C. L., and Hanna, A. S. (2006). " Conceptual planning process for electrical construction.." J. Constr. Eng. Manage. 0733-9364, 132 (12), 1306-1313. 10.1061/(ASCE)0733-9364(2006)132:12(1306) (Pubitemid 44794270)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1306-1313
    • Menches, C.L.1    Hanna, A.S.2
  • 33
    • 0142025004 scopus 로고    scopus 로고
    • Dynamic change management for construction: Introducing the change cycle into model-based project management
    • DOI 10.1002/sdr.273
    • Park, M., and Pea-Mora, F. (2003). " Dynamic change management for construction: Introducing the change cycle into model-based project management.." Syst. Dyn. Rev. 0883-7066, 19 (3), 213-242. 10.1002/sdr.273 (Pubitemid 37293497)
    • (2003) System Dynamics Review , vol.19 , Issue.3 , pp. 213-242
    • Park, M.1    Pena-Mora, F.2
  • 34
    • 33947576287 scopus 로고    scopus 로고
    • Teams take the better risks
    • " 0167-2681, (),. 10.1016/j.jebo.2005.04.023
    • Rockenbach, B., Sadrieh, A., and Mathauschek, B. (2007). " Teams take the better risks.." J. Econ. Behav. Organ. 0167-2681, 63 (3), 412-422. 10.1016/j.jebo.2005.04.023
    • (2007) J. Econ. Behav. Organ. , vol.63 , Issue.3 , pp. 412-422
    • Rockenbach, B.1    Sadrieh, A.2    Mathauschek, B.3
  • 35
    • 47649112914 scopus 로고    scopus 로고
    • Organizational learning: Effects of (network) structure and (individual) strategy
    • 1381-298X, (),. 10.1007/s10588-008-9028-0
    • Rodan, S. (2008). " Organizational learning: Effects of (network) structure and (individual) strategy.." Comput. Math. Org. Theory 1381-298X, 14 (3), 222-247. 10.1007/s10588-008-9028-0
    • (2008) Comput. Math. Org. Theory , vol.14 , Issue.3 , pp. 222-247
    • Rodan, S.1
  • 36
    • 0001847103 scopus 로고
    • Managing overconfidence
    • 0019-848X.
    • Russo, J. E., and Schoemaker, P. J. H. (1992). " Managing overconfidence.." Sloan Manage. Rev. 0019-848X, 33 (2), 7-17.
    • (1992) Sloan Manage. Rev. , vol.33 , Issue.2 , pp. 7-17
    • Russo, J.E.1    Schoemaker, P.J.H.2
  • 38
    • 12044256809 scopus 로고
    • Productivity loss in performance groups: A motivation analysis
    • 0033-2909, (),. 10.1037/0033-2909.113.1.67
    • Shepperd, J. A. (1993). " Productivity loss in performance groups: A motivation analysis.." Psychol. Bull. 0033-2909, 113 (1), 67-81. 10.1037/0033-2909.113.1.67
    • (1993) Psychol. Bull. , vol.113 , Issue.1 , pp. 67-81
    • Shepperd, J.A.1
  • 40
    • 51849095296 scopus 로고    scopus 로고
    • Measuring and modeling labor productivity using historical data
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(2008)134:10(786)
    • Song, L., and AbouRizk, S. M. (2008). " Measuring and modeling labor productivity using historical data.." J. Constr. Eng. Manage. 0733-9364, 134 (10), 786-794. 10.1061/(ASCE)0733-9364(2008)134:10(786)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.10 , pp. 786-794
    • Song, L.1    Abourizk, S.M.2
  • 42
    • 78751508600 scopus 로고    scopus 로고
    • Taxpayer's Alliance.., Taxpayers' Alliance, London.
    • Taxpayer's Alliance. (2007). Beyond the dome, Taxpayers' Alliance, London.
    • (2007) Beyond the Dome
  • 43
    • 0023559504 scopus 로고
    • Factor model of construction productivity
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1987)113:4(623)
    • Thomas, H. R., and Yiakoumis, I. (1987). " Factor model of construction productivity.." J. Constr. Eng. Manage. 0733-9364, 113 (4), 623-639. 10.1061/(ASCE)0733-9364(1987)113:4(623)
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.4 , pp. 623-639
    • Thomas, H.R.1    Yiakoumis, I.2
  • 44
    • 0016264378 scopus 로고
    • Judgment under uncertainty: Heuristics and biases
    • 0036-8075, (),. 10.1126/science.185.4157.1124
    • Tversky, A., and Kahneman, D. (1974). " Judgment under uncertainty: Heuristics and biases.." Science 0036-8075, 185 (4157), 1124-1131. 10.1126/science.185.4157.1124
    • (1974) Science , vol.185 , Issue.4157 , pp. 1124-1131
    • Tversky, A.1    Kahneman, D.2
  • 45
    • 0000505675 scopus 로고
    • On the failure to eliminate hypotheses in a conceptual task
    • 0033-555X, (),. 10.1080/17470216008416717
    • Wason, P. C. (1960). " On the failure to eliminate hypotheses in a conceptual task.." Q. J. Exp. Psychol. 0033-555X, 12 (3), 129-140. 10.1080/17470216008416717
    • (1960) Q. J. Exp. Psychol. , vol.12 , Issue.3 , pp. 129-140
    • Wason, P.C.1
  • 46
    • 0023582185 scopus 로고
    • Unrealistic optimism about susceptibility to health problems: Conclusions from a community-wide sample
    • 0160-7715, (),. 10.1007/BF00846146
    • Weinstein, N. D. (1987). " Unrealistic optimism about susceptibility to health problems: Conclusions from a community-wide sample.." J. Behav. Med. 0160-7715, 10 (5), 481-500. 10.1007/BF00846146
    • (1987) J. Behav. Med. , vol.10 , Issue.5 , pp. 481-500
    • Weinstein, N.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.