-
1
-
-
0242269889
-
A review of the support tools for the process of assembly method selection and assembly planning
-
Abdullah, T. A., Popplewell, K., and Page, C. J. (2003). A review of the support tools for the process of assembly method selection and assembly planning, International Journal of Production Research, 41(11), pp. 2391-2410.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.11
, pp. 2391-2410
-
-
Abdullah, T.A.1
Popplewell, K.2
Page, C.J.3
-
2
-
-
39049136085
-
A review of particle swarm optimization. Part II: Hybridization, combinatorial, multicriteria and constrained optimization, and indicative applications
-
Banks, A., Vincent, J., and Anyakoha, C. (2008). A review of particle swarm optimization. Part II: hybridization, combinatorial, multicriteria and constrained optimization, and indicative applications, Natural Computing, 7, 109-124.
-
(2008)
Natural Computing
, vol.7
, pp. 109-124
-
-
Banks, A.1
Vincent, J.2
Anyakoha, C.3
-
3
-
-
1642269241
-
Optimizing assembly planning through a three-stage integrated approach
-
Chen, R. S., Lu, K.-Y., and Tai, P. H. (2004). Optimizing assembly planning through a three-stage integrated approach, International Journal of Production Economics, 88, pp. 243-256.
-
(2004)
International Journal of Production Economics
, vol.88
, pp. 243-256
-
-
Chen, R.S.1
Lu, K.-Y.2
Tai, P.H.3
-
4
-
-
0031373295
-
Representation and selection of assembly sequences in computer-aided assembly process planning
-
Gottipolu, R. B., and Ghosh, K. (1997). Representation and selection of assembly sequences in computer-aided assembly process planning, International Journal of Production Research, 35(12), pp. 3447-3465.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.12
, pp. 3447-3465
-
-
Gottipolu, R.B.1
Ghosh, K.2
-
5
-
-
0035866455
-
Disassembly sequence plan generation using a branch-and-bound algorithm
-
Gungor, A., and Gupta, M. (2001). Disassembly sequence plan generation using a branch-and-bound algorithm, International Journal of Production Research, 39(1), pp. 481-509.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.1
, pp. 481-509
-
-
Gungor, A.1
Gupta, M.2
-
6
-
-
0026240285
-
Two criteria for the selection of assembly plans: Maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks
-
Homem de Mello, L. S., and Sanderson, A. C. (1991). Two criteria for the selection of assembly plans: maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks, IEEE Transactions on Robotics and Automation, 7(5), pp. 626-633.
-
(1991)
IEEE Transactions on Robotics and Automation
, vol.7
, Issue.5
, pp. 626-633
-
-
De Mello1
H, L.S.2
Sanderson, A.C.3
-
7
-
-
0037138045
-
Disassembly matrix for disassembly processed of products
-
Huang, Y. M. and Huang, C. T. (2002). Disassembly matrix for disassembly processed of products, International Journal of Production Research, 40(2), pp. 255-273.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.2
, pp. 255-273
-
-
Huang, Y.M.1
Huang, C.T.2
-
8
-
-
0031352450
-
A discrete binary version of the particle swarm algorithm
-
Piscataway, NJ
-
Kennedy, J., and Eberhart, R. C. (1997). A discrete binary version of the particle swarm algorithm, Proceedings of the International Conference on Systems, Man and Cybernetics, Piscataway, NJ, 4104-4109.
-
(1997)
Proceedings of the International Conference on Systems, Man and Cybernetics
, pp. 4104-4109
-
-
Kennedy, J.1
Eberhart, R.C.2
-
9
-
-
33748526878
-
Disassembly sequencing using genetic algorithm
-
Kongar, E., and Gupta, S. M. (2006). Disassembly sequencing using genetic algorithm, International Journal of Advanced Manufacturing Technology, 30, pp. 497-506.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, pp. 497-506
-
-
Kongar, E.1
Gupta, S.M.2
-
11
-
-
77951584645
-
GAPP: A generative assembly process planner
-
Laperriere, L., and ElMaraghy, H. A. (1996). GAPP: A Generative Assembly Process Planner, Journal of Manufacturing Systems, 15(4), pp. 282-293.
-
(1996)
Journal of Manufacturing Systems
, vol.15
, Issue.4
, pp. 282-293
-
-
Laperriere, L.1
Elmaraghy, H.A.2
-
12
-
-
0027589546
-
An integrated approach to automated assembly planning for three-dimensional mechanical products
-
Lin, A. C, and Chang, T. C. (1993). An integrated approach to automated assembly planning for three-dimensional mechanical products, International Journal of Production Research, 31(5), pp. 1201-1227.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.5
, pp. 1201-1227
-
-
Lin, A.C.1
Chang, T.C.2
-
13
-
-
0037274721
-
Disassembly planning based on precedence relations among assemblies
-
Torres, F., Puente, S. T., and Aracil, R. (2003). Disassembly planning based on precedence relations among assemblies, International Journal of Advanced Manufacturing Technology, 21, pp. 317-327.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.21
, pp. 317-327
-
-
Torres, F.1
Puente, S.T.2
Aracil, R.3
|