메뉴 건너뛰기




Volumn 34, Issue 24, 2010, Pages

A method for electric vehicle charging infrastructure planning

Author keywords

Charging demand; Charging infrastructure; Charging mode; Electric vehicle; Planning

Indexed keywords

CHARGE CAPACITIES; CHARGING DEMAND; CHARGING INFRASTRUCTURE; CHARGING MODE; DEVELOPMENT DIRECTIONS; DEVELOPMENT STAGES; GAS STATIONS; INFRASTRUCTURE PLANNING; MODE CHOICE; MOTOR VEHICLE; NEW ENERGY SOURCES; OPTIMIZATION MODELS; PLANNING METHOD; SUBSTATION PLANNING;

EID: 78651424781     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (94)

References (17)
  • 1
    • 78651414173 scopus 로고    scopus 로고
    • [2007-12-26]. Chinese source
    • [2007-12-26]. http://zys.ndrc.gov.cn/xwfb/t20071226_181200.htm.
    • (2007)
  • 2
    • 78651420227 scopus 로고    scopus 로고
    • [2008-09-03]. Chinese source
    • [2008-09-03]. http://www.moc.gov.cn/zhuzhan/jiaotongxinwen/xinwenredian/ 200809xinwen/200809/t20080903_519133.html.
    • (2008)
  • 3
    • 71849101205 scopus 로고    scopus 로고
    • Transportation options in a carbon-constrained world: hybrids, plug-in hybrids, biofuels, fuel cell electric vehicles, and battery electric vehicles
    • Thomas C E S. Transportation options in a carbon-constrained world: hybrids, plug-in hybrids, biofuels, fuel cell electric vehicles, and battery electric vehicles. International Journal of Hydrogen Energy, 2009(34): 9279-9296.
    • (2009) International Journal of Hydrogen Energy , Issue.34 , pp. 9279-9296
    • Thomas, C.E.S.1
  • 4
    • 78651454002 scopus 로고    scopus 로고
    • Prospect analysis of electric vehicle powered by fuel cells
    • Gui Changqing. Prospect analysis of electric vehicle powered by fuel cells. Chinese Battery Industry, 2009, 14(1): 44-47.
    • (2009) Chinese Battery Industry , vol.14 , Issue.1 , pp. 44-47
    • Gui, C.1
  • 5
    • 78651448867 scopus 로고    scopus 로고
    • Discussion on development trend of battery electric vehicles in China and its energy supply mode
    • Zhang Wenliang, Wu Bin, Li Wufeng, et al. Discussion on development trend of battery electric vehicles in China and its energy supply mode. Power System Technology, 2009, 33(4): 1-5.
    • (2009) Power System Technology , vol.33 , Issue.4 , pp. 1-5
    • Zhang, W.1    Wu, B.2    Li, W.3
  • 6
    • 78651421135 scopus 로고    scopus 로고
    • EV battery management system
    • Liu Baojie, Wang Yan, Yin Tianming. EV battery management system. Electrical Automation, 2010, 32(1): 60-63.
    • (2010) Electrical Automation , vol.32 , Issue.1 , pp. 60-63
    • Liu, B.1    Wang, Y.2    Yin, T.3
  • 7
    • 78651343662 scopus 로고    scopus 로고
    • Research on electric vehicle charging mode and charging stations construction
    • Kang Jiguang, Wei Zhenlin, Cheng Danming, et al. Research on electric vehicle charging mode and charging stations construction. Power Demand Side Management, 2009, 11(5): 64-66.
    • (2009) Power Demand Side Management , vol.11 , Issue.5 , pp. 64-66
    • Kang, J.1    Wei, Z.2    Cheng, D.3
  • 8
    • 78649591661 scopus 로고    scopus 로고
    • Tentative analysis of layout of electrical vehicle charging stations
    • Xu Fan, Yu Guoqin, Gu Linfeng, et al. Tentative analysis of layout of electrical vehicle charging stations. East China Electric Power, 2009, 37(10): 1678-1682.
    • (2009) East China Electric Power , vol.37 , Issue.10 , pp. 1678-1682
    • Xu, F.1    Yu, G.2    Gu, L.3
  • 9
    • 0035504097 scopus 로고    scopus 로고
    • Life-cycle analysis of charging infrastructure for electric vehicles
    • Nansai K, Tohnob S, Konoc M, et al. Life-cycle analysis of charging infrastructure for electric vehicles. Applied Energy, 2010, 70(3): 251-265.
    • (2010) Applied Energy , vol.70 , Issue.3 , pp. 251-265
    • Nansai, K.1    Tohnob, S.2    Konoc, M.3
  • 10
    • 15744382246 scopus 로고    scopus 로고
    • Two-phase optimization planning approach to substation location and sizing
    • Wang Chengshan, Wei Haiyang, Xiao Jun, et al. Two-phase optimization planning approach to substation location and sizing. Automation of Electric Power Systems, 2005, 29(4): 62-66.
    • (2005) Automation of Electric Power Systems , vol.29 , Issue.4 , pp. 62-66
    • Wang, C.1    Wei, H.2    Xiao, J.3
  • 11
    • 34047194634 scopus 로고    scopus 로고
    • Substation optimization planning based on the weighted Voronoi diagram
    • Ge Shaoyun, Li Hui, Liu Hong. Substation optimization planning based on the weighted Voronoi diagram. Automation of Electric Power Systems, 2007, 31(3): 29-33.
    • (2007) Automation of Electric Power Systems , vol.31 , Issue.3 , pp. 29-33
    • Ge, S.1    Li, H.2    Liu, H.3
  • 12
    • 33751571399 scopus 로고    scopus 로고
    • Integrated planning for the distribution system with the unified optimization of substation and network frame
    • Lin Jikeng, Li Honglu, Luo Pingping, et al. Integrated planning for the distribution system with the unified optimization of substation and network frame. Automation of Electric Power Systems, 2006, 30(19): 42-46.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.19 , pp. 42-46
    • Lin, J.1    Li, H.2    Luo, P.3
  • 14
    • 77949448775 scopus 로고    scopus 로고
    • The essential cause and technical requirements of the smart grid
    • Yao Jianguo, Lai Yening. The essential cause and technical requirements of the smart grid. Automation of Electric Power Systems, 2010, 34(2): 1-4.
    • (2010) Automation of Electric Power Systems , vol.34 , Issue.2 , pp. 1-4
    • Yao, J.1    Lai, Y.2
  • 16
    • 78651440002 scopus 로고    scopus 로고
    • [2010-01-19]. Chinese source
    • [2010-01-19]. http://www.sgcc.com.cn/xwzx/mtbd/215636.shtml.
    • (2010)
  • 17
    • 78651465802 scopus 로고    scopus 로고
    • Chinese source
    • 1998.
    • (1998)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.