메뉴 건너뛰기




Volumn 130, Issue 1, 2011, Pages 125-133

A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing

Author keywords

Dynamic scheduling; Multi objective optimization; Multiple attribute decision making (MADM); Semiconductor manufacturing system (SMS)

Indexed keywords

CUT-OFF METHODS; DYNAMIC SCHEDULING; MULTI OBJECTIVE; MULTI-OBJECTIVE SCHEDULING PROBLEMS; MULTIPLE ATTRIBUTE DECISION MAKING; PERFORMANCE MEASURE; SEMICONDUCTOR MANUFACTURING; SEMICONDUCTOR MANUFACTURING SYSTEMS;

EID: 78651298060     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2010.12.014     Document Type: Article
Times cited : (38)

References (36)
  • 4
    • 33746441144 scopus 로고    scopus 로고
    • Modeling, scheduling, and performance evaluation for wafer fabrication: A queueing colored Petri-net and GA-based approach
    • T.C. Chiang, A.C. Huang, and L.C. Fu Modeling, scheduling, and performance evaluation for wafer fabrication: a queueing colored Petri-net and GA-based approach IEEE Transactions on Automation Science and Engineering 3 3 2006 330 338
    • (2006) IEEE Transactions on Automation Science and Engineering , vol.3 , Issue.3 , pp. 330-338
    • Chiang, T.C.1    Huang, A.C.2    Fu, L.C.3
  • 5
    • 0011788714 scopus 로고
    • Network dispatching by the shortest-operation discipline
    • R. Conway, and W. Maxwell Network dispatching by the shortest-operation discipline Operations Research 10 1 1962 51 73
    • (1962) Operations Research , vol.10 , Issue.1 , pp. 51-73
    • Conway, R.1    Maxwell, W.2
  • 6
    • 0042887637 scopus 로고    scopus 로고
    • A new scheduling approach using combined dispatching criteria in wafer fabs
    • R.M. Dabbas, and J.W. Fowler A new scheduling approach using combined dispatching criteria in wafer fabs IEEE Transactions on Semiconductor Manufacturing 16 3 2003 501 510
    • (2003) IEEE Transactions on Semiconductor Manufacturing , vol.16 , Issue.3 , pp. 501-510
    • Dabbas, R.M.1    Fowler, J.W.2
  • 7
    • 50849151631 scopus 로고
    • The control problem of grey systems
    • J.L. Deng The control problem of grey systems System and Control Letters 1 5 1982 288 294
    • (1982) System and Control Letters , vol.1 , Issue.5 , pp. 288-294
    • Deng, J.L.1
  • 11
    • 33846679540 scopus 로고
    • Intel five-machine six step Mini-Fab description
    • Arizona State University
    • Kempf, K., 1994. Intel five-machine six step Mini-Fab description, Intel/ASU Report, Arizona State University.
    • (1994) Intel/ASU Report
    • Kempf, K.1
  • 12
    • 44649101917 scopus 로고    scopus 로고
    • The use of grey relational in solving multiple attribute decision-making problems
    • Y. Kuo, T. Yang, and G.W. Huang The use of grey relational in solving multiple attribute decision-making problems Computers and Industrial Engineering 2008 55 1 2008 80 93
    • (2008) Computers and Industrial Engineering 2008 , vol.55 , Issue.1 , pp. 80-93
    • Kuo, Y.1    Yang, T.2    Huang, G.W.3
  • 13
    • 0036058918 scopus 로고    scopus 로고
    • SLIM: Short cycle time and low inventory in manufacturing at Samsung electronics
    • R.C. Leachman, J. Kang, and V. Lin SLIM: short cycle time and low inventory in manufacturing at Samsung electronics Interfaces 32 1 2002 61 77
    • (2002) Interfaces , vol.32 , Issue.1 , pp. 61-77
    • Leachman, R.C.1    Kang, J.2    Lin, V.3
  • 14
    • 53949094990 scopus 로고    scopus 로고
    • Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
    • Y.F. Lee, Z.B. Jiang, and H.R. Liu Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system Computers and Operations Research 36 3 2009 866 884
    • (2009) Computers and Operations Research , vol.36 , Issue.3 , pp. 866-884
    • Lee, Y.F.1    Jiang, Z.B.2    Liu, H.R.3
  • 15
    • 0030084325 scopus 로고    scopus 로고
    • Minimum inventory variability schedule with applications in semiconductor fabrication
    • S. Li, T. Tang, and D.W. Collins Minimum inventory variability schedule with applications in semiconductor fabrication IEEE Transactions on Semiconductor Manufacturing 9 1 1996 145 149
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.1 , pp. 145-149
    • Li, S.1    Tang, T.2    Collins, D.W.3
  • 16
    • 48949091158 scopus 로고    scopus 로고
    • Dynamic multi-attribute decision making model with grey number evaluations
    • Y.H. Lin, P.C. Lee, and H.I. Ting Dynamic multi-attribute decision making model with grey number evaluations Expert Systems with Applications 35 4 2008 1638 1644
    • (2008) Expert Systems with Applications , vol.35 , Issue.4 , pp. 1638-1644
    • Lin, Y.H.1    Lee, P.C.2    Ting, H.I.3
  • 18
    • 0026369803 scopus 로고
    • Distributed scheduling based on due dates and buffer priorities
    • S.H. Lu, and P.R. Kumar Distributed scheduling based on due dates and buffer priorities IEEE Transaction on Automatic Control 36 12 1991 1406 1416
    • (1991) IEEE Transaction on Automatic Control , vol.36 , Issue.12 , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2
  • 19
    • 17444373066 scopus 로고    scopus 로고
    • The effect of normalization norms in multiple attribute decision making models: A case study in gear material selection
    • A.S. Milani, A. Shanian, R. Madoliat, and J.A. Nemes The effect of normalization norms in multiple attribute decision making models: a case study in gear material selection Structural Multidisciplinary Optimization 29 4 2005 312 318
    • (2005) Structural Multidisciplinary Optimization , vol.29 , Issue.4 , pp. 312-318
    • Milani, A.S.1    Shanian, A.2    Madoliat, R.3    Nemes, J.A.4
  • 20
    • 77957790861 scopus 로고    scopus 로고
    • Learning effective new single machine dispatching rules from optimal scheduling data
    • S. Olafsson, and X. Li Learning effective new single machine dispatching rules from optimal scheduling data International Journal of Production Economics 128 1 2010 118 126
    • (2010) International Journal of Production Economics , vol.128 , Issue.1 , pp. 118-126
    • Olafsson, S.1    Li, X.2
  • 21
    • 33744470862 scopus 로고    scopus 로고
    • Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling
    • A.I. Sivakumar, and A.K. Gupta Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling IEEE Transactions on Electronics Packaging Manufacturing 29 2 2006 99 109
    • (2006) IEEE Transactions on Electronics Packaging Manufacturing , vol.29 , Issue.2 , pp. 99-109
    • Sivakumar, A.I.1    Gupta, A.K.2
  • 22
    • 39649103408 scopus 로고    scopus 로고
    • On the value of location information to lot scheduling in complex manufacturing processes
    • F. Thiesse, and E. Fleisch On the value of location information to lot scheduling in complex manufacturing processes International Journal of Production Economics 112 2 2008 532 547
    • (2008) International Journal of Production Economics , vol.112 , Issue.2 , pp. 532-547
    • Thiesse, F.1    Fleisch, E.2
  • 23
    • 1442359245 scopus 로고    scopus 로고
    • Multiple response optimization in a fully automated FAB: An integrated tool and vehicle dispatching strategy
    • J.C. Tyan, T.C. Du, J.C. Chen, and I.H. Chang Multiple response optimization in a fully automated FAB: an integrated tool and vehicle dispatching strategy Computers and Industrial Engineering 46 1 2004 121 139
    • (2004) Computers and Industrial Engineering , vol.46 , Issue.1 , pp. 121-139
    • Tyan, J.C.1    Du, T.C.2    Chen, J.C.3    Chang, I.H.4
  • 24
    • 78649318482 scopus 로고    scopus 로고
    • Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system
    • V. Vinod, and R. Sridharan Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system International Journal of Production Economics 129 1 2011 127 146
    • (2011) International Journal of Production Economics , vol.129 , Issue.1 , pp. 127-146
    • Vinod, V.1    Sridharan, R.2
  • 25
    • 34347355413 scopus 로고    scopus 로고
    • Hybrid multiple attribute decision making model based on entropy
    • W. Wang, and M.M. Cui Hybrid multiple attribute decision making model based on entropy Journal of Systems Engineering and Electronics 18 1 2007 72 75
    • (2007) Journal of Systems Engineering and Electronics , vol.18 , Issue.1 , pp. 72-75
    • Wang, W.1    Cui, M.M.2
  • 26
    • 78649329380 scopus 로고    scopus 로고
    • A survey of the application of fuzzy set theory in production and operations management: 19982009
    • B.K. Wong, and V.S. Lai A survey of the application of fuzzy set theory in production and operations management: 19982009 International Journal of Production Economics 129 1 2011 157 168
    • (2011) International Journal of Production Economics , vol.129 , Issue.1 , pp. 157-168
    • Wong, B.K.1    Lai, V.S.2
  • 27
    • 38849114407 scopus 로고    scopus 로고
    • Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features
    • M.-C. Wu, J.-H. Jiang, and W.-J. Chang Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features International Journal of Production Economics 112 1 2008 416 426
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 416-426
    • Wu, M.-C.1    Jiang, J.-H.2    Chang, W.-J.3
  • 28
    • 38949115195 scopus 로고    scopus 로고
    • On multi-period multi-attribute decision making
    • Z.S. Xu On multi-period multi-attribute decision making Knowledge-Based Systems 21 2 2008 164 171
    • (2008) Knowledge-Based Systems , vol.21 , Issue.2 , pp. 164-171
    • Xu, Z.S.1
  • 31
    • 0036589499 scopus 로고    scopus 로고
    • On the evidential reasoning algorithm for multiattribute decision analysis under uncertainty
    • J.-B. Yang, and D.-L. Xu On the evidential reasoning algorithm for multiattribute decision analysis under uncertainty IEEE Transaction on Systems, Man, and CyberneticsPart A 32 3 2002 289 304
    • (2002) IEEE Transaction on Systems, Man, and CyberneticsPart A , vol.32 , Issue.3 , pp. 289-304
    • Yang, J.-B.1    Xu, D.-L.2
  • 32
    • 12444289555 scopus 로고    scopus 로고
    • Solving a multiresponse simulation-optimization problem with discrete variables using a mutli-attribute decision-making method
    • T. Yang, and P. Chou Solving a multiresponse simulation-optimization problem with discrete variables using a mutli-attribute decision-making method Mathematics and Computers in Simulation 68 1 2005 9 21
    • (2005) Mathematics and Computers in Simulation , vol.68 , Issue.1 , pp. 9-21
    • Yang, T.1    Chou, P.2
  • 34
    • 0022028706 scopus 로고
    • Manufacturing plant location analysis by multiple attribute decision making: Part I-single plant strategy International
    • K. Yoon, and C.-L. Hwang Manufacturing plant location analysis by multiple attribute decision making: Part I-single plant strategy International Journal of Production Research 23 2 1985 345 359 (Pubitemid 15512004)
    • (1985) International Journal of Production Research , vol.23 , Issue.2 , pp. 345-359
    • Yoon Kwangsun1    Hwang Ching-Lai2
  • 35
    • 70449625129 scopus 로고    scopus 로고
    • An optimised dynamic bottleneck dispatching policy for semiconductor wafer fabrication
    • H. Zhang, Z. Jiang, and C. Guo An optimised dynamic bottleneck dispatching policy for semiconductor wafer fabrication International Journal of Production Research 47 12 2009 3333 3343
    • (2009) International Journal of Production Research , vol.47 , Issue.12 , pp. 3333-3343
    • Zhang, H.1    Jiang, Z.2    Guo, C.3
  • 36
    • 28844484669 scopus 로고    scopus 로고
    • The method of grey related analysis to multiple attribute decision making problems with interval numbers
    • DOI 10.1016/j.mcm.2005.03.003, PII S0895717705003560
    • J. Zhang, D. Wu, and D.L. Olson The method of grey related analysis to multiple attribute decision making problems with interval numbers Mathematical and Computer Modeling 42 910 2005 991 998 (Pubitemid 41774483)
    • (2005) Mathematical and Computer Modelling , vol.42 , Issue.9-10 , pp. 991-998
    • Zhang, J.1    Wu, D.2    Olson, D.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.