-
1
-
-
56549127251
-
Application of Planning Models in the Agri-Food Supply Chain: A Review
-
Ahumada O, Villalobos JR (2009). Application of Planning Models in the Agri-Food Supply Chain: A Review. Eur. J. Oper. Res., 196 (1): 1-20.
-
(2009)
Eur. J. Oper. Res
, vol.196
, Issue.1
, pp. 1-20
-
-
Ahumada, O.1
Villalobos, J.R.2
-
2
-
-
34447530492
-
Fuzzy-Genetic Approach to Aggregate Production-Distribution Planning in Supply Chain Management
-
Aliev RA, Fazlollahi B, Guirimov BG (2007). Fuzzy-Genetic Approach to Aggregate Production-Distribution Planning in Supply Chain Management. Inf. Sci, 177 (20): 4241-4255.
-
(2007)
Inf. Sci
, vol.177
, Issue.20
, pp. 4241-4255
-
-
Aliev, R.A.1
Fazlollahi, B.2
Guirimov, B.G.3
-
3
-
-
0002893158
-
Resource deployment analysis of global manufacturing and distribution networks
-
Cohen MA, Lee HL (1989). Resource Deployment Analysis of Global Manufacturing and Distribution Networks. J. Manufact. Oper. Manage., 2: 81-104.
-
(1989)
J. Manufact. Oper. Manage
, vol.2
, pp. 81-104
-
-
Cohen, M.A.1
Lee, H.L.2
-
4
-
-
0016521296
-
Five approaches to aggregate production planning
-
Elion S (1975). Five Approaches to Aggregate Production Planning. AIIE Trans., 7: 118-131.
-
(1975)
AIIE Trans
, vol.7
, pp. 118-131
-
-
Elion, S.1
-
5
-
-
48049121099
-
A Heuristic-Based algebraic targeting technique for aggregate planning in supply chains
-
Foo CYD, Mike BL, Raymond R, Jenny S (2008). A Heuristic-Based Algebraic Targeting Technique for Aggregate Planning in Supply Chains. Comput. Chem. Eng., 32 (10): 2217-2232.
-
(2008)
Comput. Chem. Eng
, vol.32
, Issue.10
, pp. 2217-2232
-
-
Foo, C.Y.D.1
Mike, B.L.2
Raymond, R.3
Jenny, S.4
-
6
-
-
15344341300
-
Hybrid genetic algorithm for multi-time period production distribution planning
-
Gen M, Syarif A (2005). Hybrid Genetic Algorithm for Multi-Time Period Production Distribution Planning. Comput. Ind. Eng., 48: 799-809.
-
(2005)
Comput. Ind. Eng
, vol.48
, pp. 799-809
-
-
Gen, M.1
Syarif, A.2
-
7
-
-
0016093099
-
A goal programming approach to aggregate planning of production and work force
-
Goodman DA (1974). A Goal Programming Approach to Aggregate Planning of Production and Work Force. Manage. Sci., 20: 1569- 1575.
-
(1974)
Manage. Sci
, vol.20
, pp. 1569-1575
-
-
Goodman, D.A.1
-
8
-
-
56249121909
-
Modeling and analysis of build-to-order supply chains
-
Gunasekaran A, Ngai E (2009). Modeling and Analysis of Build-To- Order Supply Chains. Eur. J. Oper. Res., 195(2): 319-334.
-
(2009)
Eur. J. Oper. Res
, vol.195
, Issue.2
, pp. 319-334
-
-
Gunasekaran, A.1
Ngai, E.2
-
9
-
-
0004720591
-
A linear programming approach to production and employment scheduling
-
Hanssmann F, Hess SW (1960). A Linear Programming Approach to Production and Employment Scheduling. Manage. Sci., 1: 46-51.
-
(1960)
Manage. Sci
, vol.1
, pp. 46-51
-
-
Hanssmann, F.1
Hess, S.W.2
-
10
-
-
67349179470
-
A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning
-
Jamalnia A, Soukhakian MA (2009). A Hybrid Fuzzy Goal Programming Approach with Different Goal Priorities to Aggregate Production Planning. Comput. Ind. Eng., 56 (4): 1474-1486.
-
(2009)
Comput. Ind. Eng
, vol.56
, Issue.4
, pp. 1474-1486
-
-
Jamalnia, A.1
Soukhakian, M.A.2
-
11
-
-
0026898945
-
A new approach to some possibilistic linear programming problems
-
Lai YJ, Hwang CL (1992). A New Approach to Some Possibilistic Linear Programming Problems. Fuzzy Sets and Systems, 49(2): 121-133.
-
(1992)
Fuzzy Sets and Systems
, vol.49
, Issue.2
, pp. 121-133
-
-
Lai, Y.J.1
Hwang, C.L.2
-
12
-
-
60549107680
-
A goal programming model for aggregate production planning with resource utilization constraint
-
Leung CH, Chan SW (2009). A Goal Programming Model for Aggregate Production Planning with Resource Utilization Constraint. Comput. Ind. Eng., 56 (3): 1053-1064.
-
(2009)
Comput. Ind. Eng
, vol.56
, Issue.3
, pp. 1053-1064
-
-
Leung, C.H.1
Chan, S.W.2
-
13
-
-
50249122486
-
Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain
-
Liang T (2008). Fuzzy Multi-Objective Production/Distribution Planning Decisions with Multi-Product and Multi-Time Period in a Supply Chain. Comput. Ind. Eng., 55: 676-694.
-
(2008)
Comput. Ind. Eng
, vol.55
, pp. 676-694
-
-
Liang, T.1
-
14
-
-
56349085911
-
Application of fuzzy sets to manufacturing/distribution planning decisions with multi-product and multi-time period in supply chains
-
Liang T, Cheng HW (2009). Application of Fuzzy Sets to Manufacturing/Distribution Planning Decisions with Multi-Product and Multi-Time Period in Supply Chains. Expert Systems with Applications, 36: 3367-3377.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 3367-3377
-
-
Liang, T.1
Cheng, H.W.2
-
15
-
-
0019087284
-
Aggregate production planning model and application of three multiple objectives decision methods
-
Masud ASM, Hwang CL (1980). Aggregate Production Planning Model and Application of Three Multiple Objectives Decision Methods. Int. J. Prod. Res., 18: 741-752.
-
(1980)
Int. J. Prod. Res
, vol.18
, pp. 741-752
-
-
Masud, A.S.M.1
Hwang, C.L.2
-
16
-
-
75149119642
-
Mathematical programming models for supply chain production and transport planning
-
Mula J, Peidro D, Diaz-Madronero M, Vicens E (2010). Mathematical Programming Models for Supply Chain Production and Transport Planning. Eur. J. Oper. Res., 204: 377-390.
-
(2010)
Eur. J. Oper. Res
, vol.204
, pp. 377-390
-
-
Mula, J.1
Peidro, D.2
Diaz-Madronero, M.3
Vicens, E.4
-
17
-
-
78650624926
-
Distribution network design and optimization in supply chain management: A strategic production-distribution model under material requirements Constraints
-
Paksoy T (2005). Distribution Network Design and Optimization in Supply Chain Management: A Strategic Production-Distribution Model under Material Requirements Constraints. J. Selcuk Univ. Soc. Sci. Inst. Turk., 14: 435-454.
-
(2005)
J. Selcuk Univ. Soc. Sci. Inst. Turk
, vol.14
, pp. 435-454
-
-
Paksoy, T.1
-
18
-
-
78650592971
-
A Stochastic Approach to Interactive Fuzzy Multi-Objective Linear Programming for Aggregate Production Planning
-
Paksoy T, Atak M (2005). A Stochastic Approach to Interactive Fuzzy Multi-Objective Linear Programming for Aggregate Production Planning. Selçuk J. Appl. Math., 6 (2): 79-98.
-
(2005)
Selçuk J. Appl. Math
, vol.6
, Issue.2
, pp. 79-98
-
-
Paksoy, T.1
Atak, M.2
-
19
-
-
77952953579
-
Design and optimization of a strategic production-distribution model for supply chain Management: Case study of a plastic profile manufacturer in turkey
-
Paksoy T, Güles HK, Bayraktar D (2007). Design and Optimization of a Strategic Production-Distribution Model For Supply Chain Management: Case Study of a Plastic Profile Manufacturer in Turkey. Selçuk J. Appl. Math., 8: 883-99.
-
(2007)
Selçuk J. Appl. Math
, vol.8
, pp. 883-899
-
-
Paksoy, T.1
Güles, H.K.2
Bayraktar, D.3
-
20
-
-
0027912829
-
Performance characteristics of stochastic integrated production-distribution systems
-
Pyke DF, Cohen MA (1993). Performance Characteristics of Stochastic Integrated Production-Distribution Systems. Eur. J. Oper. Res., 68 (1): 23-48.
-
(1993)
Eur. J. Oper. Res
, vol.68
, Issue.1
, pp. 23-48
-
-
Pyke, D.F.1
Cohen, M.A.2
-
21
-
-
55149099211
-
Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers
-
Sarker BR, Diponegoro A (2009). Optimal Production Plans and Shipment Schedules in a Supply-Chain System with Multiple Suppliers and Multiple Buyers. Eur. J. Oper. Res., 194 (3): 753-773.
-
(2009)
Eur. J. Oper. Res
, vol.194
, Issue.3
, pp. 753-773
-
-
Sarker, B.R.1
Diponegoro, A.2
-
22
-
-
67349277408
-
Supply chain design under uncertainty using sample average approximation and dual decomposition
-
Schütz P, Tomasgard A, Ahmed S (2009). Supply Chain Design under Uncertainty Using Sample Average Approximation and Dual Decomposition. Eur. J. Oper. Res., 199(2): 409-419.
-
(2009)
Eur. J. Oper. Res
, vol.199
, Issue.2
, pp. 409-419
-
-
Schütz, P.1
Tomasgard, A.2
Ahmed, S.3
-
23
-
-
60649112637
-
A genetic algorithm for a single product network design model with lead time and safety stock considerations
-
Sourirajan K, Ozsen L, Uzsoy R (2009). A Genetic Algorithm for a Single Product Network Design Model with Lead Time and Safety Stock Considerations. Eur. J. Oper. Res., 197 (2): 599-608.
-
(2009)
Eur. J. Oper. Res
, vol.197
, Issue.2
, pp. 599-608
-
-
Sourirajan, K.1
Ozsen, L.2
Uzsoy, R.3
-
24
-
-
0036642714
-
Study on multi-stage logistics chain network: A spanning tree-based genetic algorithm approach
-
Syarif A, Yun Y, Gen M (2002). Study on Multi-Stage Logistics Chain Network: A Spanning Tree-Based Genetic Algorithm Approach. Comput. Ind. Eng., 43 (1): 299-314.
-
(2002)
Comput. Ind. Eng
, vol.43
, Issue.1
, pp. 299-314
-
-
Syarif, A.1
Yun, Y.2
Gen, M.3
-
25
-
-
0004712698
-
Can ms/or sell itself well enough
-
Tingley GA (1987). Can ms/or sell itself well enough? Interfaces, 17: 41-52.
-
(1987)
Interfaces
, vol.17
, pp. 41-52
-
-
Tingley, G.A.1
-
26
-
-
59349116946
-
A holonic approach based integration methodology for transportation and warehousing functions of the supply network
-
Tuzkaya U, Önüt S (2009). A Holonic Approach Based Integration Methodology for Transportation and Warehousing Functions of the Supply Network. Comput. Ind. Eng., 56: 708-723.
-
(2009)
Comput. Ind. Eng
, vol.56
, pp. 708-723
-
-
Tuzkaya, U.1
Önüt, S.2
-
27
-
-
50849142909
-
A two-phase ant colony algorithm for multi echelon defective supply chain network design
-
Wang HS (2009). A Two-Phase Ant Colony Algorithm for Multi Echelon Defective Supply Chain Network Design. Eur. J. Oper. Res., 192(1): 243-252.
-
(2009)
Eur. J. Oper. Res
, vol.192
, Issue.1
, pp. 243-252
-
-
Wang, H.S.1
-
28
-
-
0035899769
-
Aggregate production planning with multiple objectives in a fuzzy environment
-
Wang RC, Fang HH (2001). Aggregate Production Planning with Multiple Objectives in a Fuzzy Environment. Eur. J. Oper. Res., 133: 521-536.
-
(2001)
Eur. J. Oper. Res
, vol.133
, pp. 521-536
-
-
Wang, R.C.1
Fang, H.H.2
-
29
-
-
1442334789
-
Application of fuzzy multi-objective linear programming to aggregate production planning
-
Wang RC, Liang T (2004). Application of Fuzzy Multi-Objective Linear Programming to Aggregate Production Planning. Comput. Ind. Eng., 46(1): 17-41.
-
(2004)
Comput. Ind. Eng
, vol.46
, Issue.1
, pp. 17-41
-
-
Wang, R.C.1
Liang, T.2
-
30
-
-
26444454462
-
Applying possibilistic linear programming to aggregate production planning
-
Wang RC, Liang T (2005). Applying Possibilistic Linear Programming to Aggregate Production Planning. Int. J. Prod. Econ., 98(3): 328-341.
-
(2005)
Int. J. Prod. Econ
, vol.98
, Issue.3
, pp. 328-341
-
-
Wang, R.C.1
Liang, T.2
-
31
-
-
0019539238
-
Heuristic techniques for simultaneous scheduling of production and distribution in multi-echelon structures: Theory and empirical comparisons
-
Williams JF (1981). Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons. Manage. Sci., 27 (3): 336-352.
-
(1981)
Manage. Sci
, vol.27
, Issue.3
, pp. 336-352
-
-
Williams, J.F.1
-
32
-
-
0041386427
-
A strategic model for supply chain design with logical constraints: Formulation and solution
-
Yan H, Yu Z, Cheng TCE (2003). A Strategic Model for Supply Chain Design with Logical Constraints: Formulation and Solution. Comput. Oper. Res., 30(14): 2135-2155.
-
(2003)
Comput. Oper. Res
, vol.30
, Issue.14
, pp. 2135-2155
-
-
Yan, H.1
Yu, Z.2
Cheng, T.C.E.3
-
33
-
-
78650598918
-
Strategic level three-stage production distribution planning with capacity expansion
-
Sabanci University Graduate School of Engineering and Natural Sciences, In Turkish
-
Yilmaz P (2004). Strategic Level Three-Stage Production Distribution Planning with Capacity Expansion. Unpublished Master Thesis. Sabanci University Graduate School of Engineering and Natural Sciences, in Turkish, pp. 1-20.
-
(2004)
Unpublished Master Thesis
, pp. 1-20
-
-
Yilmaz, P.1
-
34
-
-
52949103673
-
Design of Responsive Supply Chain under Demand Uncertainty
-
You F, Grossmann E (2008). Design of Responsive Supply Chain under Demand Uncertainty. Comput. Chem. Eng., 32(12): 3090-3111.
-
(2008)
Comput. Chem. Eng
, vol.32
, Issue.12
, pp. 3090-3111
-
-
You, F.1
Grossmann, E.2
|