메뉴 건너뛰기




Volumn , Issue , 2010, Pages 323-330

Exponential smoothing for network-aware meta-scheduler in advance in Grids

Author keywords

Exponential smoothing; Grid; Holt winters; Meta scheduling; Prediction; QoS; Red black trees

Indexed keywords

EXPONENTIAL SMOOTHING; GRID; HOLT-WINTERS; META-SCHEDULING; PREDICTION; QOS; RED BLACK TREE;

EID: 78649842273     PISSN: 15302016     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICPPW.2010.52     Document Type: Conference Paper
Times cited : (9)

References (25)
  • 7
    • 78649867888 scopus 로고    scopus 로고
    • Web page at
    • The Globus Alliance, Web page at http://www.globus.org, 2010.
    • (2010)
  • 8
    • 4544359704 scopus 로고    scopus 로고
    • Kluwer Academic Publishers, ch. GARA: A Uniform Quality of Service Architecture
    • A. Roy and V. Sander, Grid Resource Management. Kluwer Academic Publishers, 2003, ch. GARA: A Uniform Quality of Service Architecture, pp. 377-394.
    • (2003) Grid Resource Management. , pp. 377-394
    • Roy, A.1    Sander, V.2
  • 9
    • 78649873304 scopus 로고    scopus 로고
    • Web page at
    • Maui Cluster Scheduler, Web page at http://www.clusterresources.com/ products/maui/, 2010.
    • (2010) Maui Cluster Scheduler
  • 12
    • 73349124267 scopus 로고    scopus 로고
    • A grid advance reservation framework for coallocation and co-reservation across heterogeneous local resource management systems
    • Gdansk, Poland
    • C. Qu, "A grid advance reservation framework for coallocation and co-reservation across heterogeneous local resource management systems," in Proc. of 7th Intl. Conference on Parallel Processing and Applied Mathematics (PPAM), Gdansk, Poland, 2007.
    • (2007) Proc. of 7th Intl. Conference on Parallel Processing and Applied Mathematics (PPAM)
    • Qu, C.1
  • 14
    • 0003584940 scopus 로고    scopus 로고
    • The statistical properties of host load
    • P. A. Dinda, "The statistical properties of host load," Scientific Programming, vol. 7, no. 3-4, pp. 211-229, 1999.
    • (1999) Scientific Programming , vol.7 , Issue.3-4 , pp. 211-229
    • Dinda, P.A.1
  • 19
  • 20
    • 33748554155 scopus 로고    scopus 로고
    • A modular meta-scheduling architecture for interfacing with pre-WS and WS Grid resource management services
    • E. Huedo, R. S. Montero, and I. M. Llorente, "A modular meta-scheduling architecture for interfacing with pre-WS and WS Grid resource management services," Future Generation Computing Systems, vol. 23, no. 2, pp. 252-261, 2007.
    • (2007) Future Generation Computing Systems , vol.23 , Issue.2 , pp. 252-261
    • Huedo, E.1    Montero, R.S.2    Llorente, I.M.3
  • 21
    • 41549103283 scopus 로고    scopus 로고
    • Predict task running time in grid environments based on CPU load predictions
    • Y. Zhang, W. Sun, and Y. Inoguchi, "Predict task running time in grid environments based on CPU load predictions," Future Generation Computing Systems, vol. 24, no. 6, pp. 489-497, 2008.
    • (2008) Future Generation Computing Systems , vol.24 , Issue.6 , pp. 489-497
    • Zhang, Y.1    Sun, W.2    Inoguchi, Y.3
  • 23
    • 34247156244 scopus 로고    scopus 로고
    • A prediction method for job runtimes on shared processors: Survey, statistical analysis and new avenues
    • M. Dobber, R. van der Mei, and G. Koole, "A prediction method for job runtimes on shared processors: Survey, statistical analysis and new avenues," Performance Evaluation, vol. 64, no. 7-8, pp. 755 - 781, 2007.
    • (2007) Performance Evaluation , vol.64 , Issue.7-8 , pp. 755-781
    • Dobber, M.1    Mei Der R.Van2    Koole, G.3
  • 24
    • 78649895212 scopus 로고    scopus 로고
    • The R Foundation, Web page at
    • The R Foundation, Web page at http://www.r-project.org/, 2010.
    • (2010)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.