메뉴 건너뛰기




Volumn 13, Issue 3, 2010, Pages 298-310

Soft systems analysis of the unification of test and evaluation and program management: A study of a federal aviation administration's strategy

Author keywords

Program management; Program strategy; Soft systems methodology; Test and evaluation

Indexed keywords

CRITICAL DEFECTS; E-STRATEGY; ESCALATING COSTS; EXECUTION STRATEGIES; FEDERAL AVIATION ADMINISTRATION; HOLISTIC VIEW; OPERATIONAL NEEDS; PERFORMANCE OBJECTIVE; PROCESS IMPROVEMENT MODELS; PROGRAM MANAGEMENT; PROGRAM STRATEGY; QUALITY IMPROVEMENT; SOFT SYSTEMS ANALYSIS; SOFT SYSTEMS METHODOLOGY; STRATEGIC OBJECTIVES; SYSTEM DEPLOYMENT; SYSTEMS THINKING; TECHNICAL TOOLS; TEST AND EVALUATION;

EID: 78649661897     PISSN: 10981241     EISSN: 15206858     Source Type: Journal    
DOI: 10.1002/sys.20150     Document Type: Article
Times cited : (11)

References (83)
  • 1
    • 78649668883 scopus 로고    scopus 로고
    • Defense Science Board Task Force study of developmental test and evaluation
    • P. Adolph, C. Dipetto, and E. Seglie, Defense Science Board Task Force study of developmental test and evaluation, ITEA J 29(3) (2008), 215-220.
    • (2008) ITEA J , vol.29 , Issue.3 , pp. 215-220
    • Adolph, P.1    Dipetto, C.2    Seglie, E.3
  • 2
    • 78649678246 scopus 로고    scopus 로고
    • The 800-pound (364 kg) gorilla
    • W.D. Bell and D. Eng., The 800-pound (364 kg) gorilla, ITEA J(3) 29 (2008), 275-277.
    • (2008) ITEA J , vol.29 , pp. 275-277
    • Bell, W.D.1    Eng., D.2
  • 3
    • 36849076265 scopus 로고    scopus 로고
    • Communicating strategic intent with Systemigrams: Application to the network-enabled challenge
    • C.D. Blair, J.T. Boardman, and B.J. Sauser, Communicating strategic intent with Systemigrams: Application to the network-enabled challenge, Syst Eng 10(4) (2007), 309-322.
    • (2007) Syst Eng , vol.10 , Issue.4 , pp. 309-322
    • Blair, C.D.1    Boardman, J.T.2    Sauser, B.J.3
  • 5
    • 0028380745 scopus 로고
    • A process model for unifying systems engineering and project management
    • J.T. Boardman, A process model for unifying systems engineering and project management, Eng Management J 4(1) (1994), 25-35.
    • (1994) Eng Management J , vol.4 , Issue.1 , pp. 25-35
    • Boardman, J.T.1
  • 8
    • 0030105210 scopus 로고    scopus 로고
    • Integrated process improvement in design and manufacture using a systems approach
    • J.T. Boardman and A.J. Cole, Integrated process improvement in design and manufacture using a systems approach, IEE Process- Control Theory Appl 143(2) (1996), 171-185.
    • (1996) IEE Process- Control Theory Appl , vol.143 , Issue.2 , pp. 171-185
    • Boardman, J.T.1    Cole, A.J.2
  • 12
    • 0030389112 scopus 로고    scopus 로고
    • Developing a testing maturity model for software test process evaluation and improvement
    • Hawaii
    • I. Burnstein, T. Suwanassart, and R. Carlson, Developing a testing maturity model for software test process evaluation and improvement, Int Test and Evaluation Conf, ITEA, Hawaii, 1996, 581-589.
    • (1996) Int Test and Evaluation Conf, ITEA , pp. 581-589
    • Burnstein, I.1    Suwanassart, T.2    Carlson, R.3
  • 13
    • 78649662234 scopus 로고    scopus 로고
    • Carnegie Mellon, S.E.I., "Introduction to CMMI, http://www.sei.cmu. edu/programs/acquisition-support/present ations/tutorialmod2.pdf, 2005.
    • Carnegie Mellon, S.E.I., "Introduction to CMMI, http://www.sei.cmu. edu/programs/acquisition-support/present ations/tutorialmod2.pdf, 2005.
  • 14
    • 78649681416 scopus 로고    scopus 로고
    • Identifying systemic program issues based on real program findings
    • D. Castellano, Identifying systemic program issues based on real program findings, PEO/SYSCOM Conf, 2006.
    • (2006) PEO/SYSCOM Conf
    • Castellano, D.1
  • 15
    • 78649665404 scopus 로고    scopus 로고
    • Sharing lessons learned based on systemic program findings
    • Kaua'i, Hawaii
    • D. Castellano, Sharing lessons learned based on systemic program findings, ITEA Int Symp, Kaua'i, Hawaii, 2007.
    • (2007) ITEA Int Symp
    • Castellano, D.1
  • 16
    • 78649665402 scopus 로고    scopus 로고
    • Improving program success by applying systems engineering and reliability growth analysis
    • J.N. Chang and D.J. Rohall, Improving program success by applying systems engineering and reliability growth analysis, ITEA J 29(3) (2008), 267-274.
    • (2008) ITEA J , vol.29 , Issue.3 , pp. 267-274
    • Chang, J.N.1    Rohall, D.J.2
  • 18
    • 0034344632 scopus 로고    scopus 로고
    • Soft systems methodology: A thirty year retrospective
    • P. Checkland, Soft systems methodology: A thirty year retrospective, Syst Res Behav Sci 17(1) (2000), 11-58.
    • (2000) Syst Res Behav Sci , vol.17 , Issue.1 , pp. 11-58
    • Checkland, P.1
  • 20
    • 33845771763 scopus 로고    scopus 로고
    • Building a holarchy using business Process-Oriented Holonic (PROH) modeling
    • B.T. Clegg, Building a holarchy using business Process-Oriented Holonic (PROH) modeling, IEEE Trans Syst Man Cybernet-Part A Syst Hum 37(1) (2007), 23-40.
    • (2007) IEEE Trans Syst Man Cybernet-Part A Syst Hum , vol.37 , Issue.1 , pp. 23-40
    • Clegg, B.T.1
  • 21
    • 12444268456 scopus 로고    scopus 로고
    • Process integration and improvement using systemic diagrams and a human-centred approach
    • B.T. Clegg and J.T. Boardman, Process integration and improvement using systemic diagrams and a human-centred approach, Concurrent Eng 4(2) (1996a), 119-136.
    • (1996) Concurrent Eng , vol.4 , Issue.2 , pp. 119-136
    • Clegg, B.T.1    Boardman, J.T.2
  • 22
    • 0030274939 scopus 로고    scopus 로고
    • Systems approach to process improvement in design and manufacture
    • (1996/171), Available:
    • B.T. Clegg and J.T. Boardman, Systems approach to process improvement in design and manufacture. 1996b = IEE Colloquia (1996/171), 311-319. Available: http://ieeexplore.ieee.org/ stamp/stamp.jsp?tp=&arnumber= 640527&isnumber=13888
    • (1996) IEE Colloquia , vol.311-319
    • Clegg, B.T.1    Boardman, J.T.2
  • 23
    • 3543132361 scopus 로고    scopus 로고
    • A soft systems methodology to support business process change towards concurrent engineering
    • BC, Canada
    • B.T. Clegg and J.T. Boardman, A soft systems methodology to support business process change towards concurrent engineering, Int Conf INCOSE, Vancouver, BC, Canada, 1998, pp. 697- 704.
    • (1998) Int Conf INCOSE, Vancouver , pp. 697-704
    • Clegg, B.T.1    Boardman, J.T.2
  • 24
    • 34249847185 scopus 로고    scopus 로고
    • Applying the concept of patterns to systems architecture
    • R.J. Cloutier and D. Verma, Applying the concept of patterns to systems architecture, Syst Eng 10(2) (2007), 138-154.
    • (2007) Syst Eng , vol.10 , Issue.2 , pp. 138-154
    • Cloutier, R.J.1    Verma, D.2
  • 26
    • 78649670152 scopus 로고    scopus 로고
    • D.C. Conner, Managing at the speed of change: how resilient managers succeed and prosper where others fail, 1992, p. 282.
    • D.C. Conner, Managing at the speed of change: how resilient managers succeed and prosper where others fail, 1992, p. 282.
  • 27
    • 0034427461 scopus 로고    scopus 로고
    • Capability maturity models support of modeling and simulation verification, validation, and accreditation
    • C.L. Conwell, R. Enright, M.A. Stutzman, J. A. Joines, R.R. Burton, K. Kung, and P.A. Fishwick (Editors)
    • C.L. Conwell, R. Enright, M.A. Stutzman, J. A. Joines, R.R. Burton, K. Kung, and P.A. Fishwick (Editors), Capability maturity models support of modeling and simulation verification, validation, and accreditation, Proc 2000 Winter Simulation Conf, IEEE, 2000, pp. 819-828.
    • Proc 2000 Winter Simulation Conf IEEE , vol.2000 , pp. 819-828
  • 30
    • 0003964033 scopus 로고
    • Massachusetts Institute of Technology, Center for Advanced Educational Study (MIT-CAES), Cambridge, MA
    • E.W. Deming, Out of the crisis, Massachusetts Institute of Technology, Center for Advanced Educational Study (MIT-CAES), Cambridge, MA, 1986, pp. 1-305.
    • (1986) Out of the Crisis , pp. 1-305
    • Deming, E.W.1
  • 31
    • 78649655001 scopus 로고    scopus 로고
    • FAA, Project management: Current state assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ 2003
    • FAA, Project management: Current state assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ, 2003.
  • 32
    • 78649653436 scopus 로고    scopus 로고
    • FAA, Integrated engineering services: Project office implementation proposal, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ 2004
    • FAA, Integrated engineering services: Project office implementation proposal, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ, 2004.
  • 33
    • 78649680166 scopus 로고    scopus 로고
    • FAA, Acquisition management policy: Test and evaluation," DOT (Editor), Federal Aviation Administration, Washington, DC 2006a
    • FAA, Acquisition management policy: Test and evaluation," DOT (Editor), Federal Aviation Administration, Washington, DC, 2006a.
  • 34
    • 78649659316 scopus 로고    scopus 로고
    • FAA, FAA ATO strategy map, DOT (Editor), Federal Aviation Administration, Washington, DC 2006b
    • FAA, FAA ATO strategy map, DOT (Editor), Federal Aviation Administration, Washington, DC, 2006b.
  • 35
    • 78649679826 scopus 로고    scopus 로고
    • FAA, Verification and validation protocol of operations-White Paper: Improvement recommendations, DOT (Editor), Federal Aviation Administration, Atlantic City, NJ, 2006, pp. 1-10.
    • FAA, Verification and validation protocol of operations-White Paper: Improvement recommendations, DOT (Editor), Federal Aviation Administration, Atlantic City, NJ, 2006, pp. 1-10.
  • 36
    • 78649684559 scopus 로고    scopus 로고
    • FAA, FAA ATO operations planning strategy map, DOT (Editor), Federal Aviation Administration Washington, DC 2007a
    • FAA, FAA ATO operations planning strategy map, DOT (Editor), Federal Aviation Administration Washington, DC, 2007a.
  • 37
    • 78649677970 scopus 로고    scopus 로고
    • FAA, Project management: Current State assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ 2007b
    • FAA, Project management: Current State assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ, 2007b.
  • 39
    • 0028734238 scopus 로고
    • Estimating the value of inspections and early testing for software projects
    • L. Franz and J.C. Shih, Estimating the value of inspections and early testing for software projects, Hewlett-Packard J 45(6) (1994), 60-67.
    • (1994) Hewlett-Packard J , vol.45 , Issue.6 , pp. 60-67
    • Franz, L.1    Shih, J.C.2
  • 43
    • 37849054468 scopus 로고    scopus 로고
    • A multi-phase research program investigating Project Management Offices (PMOs): The results of phase 1
    • B. Hobbs and M. Aubry, A multi-phase research program investigating Project Management Offices (PMOs): The results of phase 1, Project Management J 38(1) (2007), 74-86.
    • (2007) Project Management J , vol.38 , Issue.1 , pp. 74-86
    • Hobbs, B.1    Aubry, M.2
  • 44
    • 84883409022 scopus 로고    scopus 로고
    • Improving the VVT process: Evaluating the SYSTEST results in six industrial pilot projects
    • M. Hoppe and A. Engel, Improving the VVT process: Evaluating the SYSTEST results in six industrial pilot projects, INCOSE, Seattle, WA, 2005, 17 pages.
    • (2005) INCOSE, Seattle, WA , pp. 17
    • Hoppe, M.1    Engel, A.2
  • 45
    • 36849060304 scopus 로고    scopus 로고
    • Systems test: Improving the verification validation, and testing process- assessing six industrial pilot projects
    • M. Hoppe, A. Engel, and S. Shachar, Systems test: Improving the verification, validation, and testing process- assessing six industrial pilot projects, Syst Eng 10(4) (2007), 323-347.
    • (2007) Syst Eng , vol.10 , Issue.4 , pp. 323-347
    • Hoppe, M.1    Engel, A.2    Shachar, S.3
  • 46
    • 84921526648 scopus 로고    scopus 로고
    • Systems and software engineering- system life cycle processes
    • ISO/IEC, IEE Std 15288:2008
    • ISO/IEC, IEE Std 15288:2008, Systems and software engineering- system life cycle processes, International Organization For Standardization/IEC-IEEE, Geneva, Switzerland, 2008.
    • (2008) International Organization for Standardization/IEC-IEEE
  • 47
    • 78649652916 scopus 로고    scopus 로고
    • J. Juran and A.B. Godfrey, Juran?s quality handbook, McGraw Hill, New York, 1999, pp. 1-85.
    • J. Juran and A.B. Godfrey, Juran?s quality handbook, McGraw Hill, New York, 1999, pp. 1-85.
  • 48
    • 78649662726 scopus 로고    scopus 로고
    • Enhancing the role of test and evaluation in the acquisition process to increase the probability of the delivery of equipment that meets the needs of the users
    • J. Kasser, Enhancing the role of test and evaluation in the acquisition process to increase the probability of the delivery of equipment that meets the needs of the users, Proc Syst Test Eval Conf (SETE 2000), 2000, 5 pages.
    • (2000) Proc Syst Test Eval Conf (SETE 2000) , pp. 5
    • Kasser, J.1
  • 49
    • 78649678536 scopus 로고    scopus 로고
    • Wiley New York
    • H. Kerzner, Applied project management best practices on implementation, Wiley, New York, 2000, pp. 1-534.
    • (2000) , pp. 1-534
    • Kerzner, H.1
  • 52
    • 78649647414 scopus 로고    scopus 로고
    • Project office: An evolutionary implementation plan
    • Project Management Institute, Newtown Square, PA, pages
    • J. Knutson, Project office: An evolutionary implementation plan, Proc 30th Annu Project Management Inst, Project Management Institute, Newtown Square, PA, 1999, 5 pages.
    • (1999) Proc 30th Annu Project Management Inst , pp. 5
    • Knutson, J.1
  • 53
    • 0028546708 scopus 로고
    • Some recurring themes in using SSM
    • H. Kreher, Some recurring themes in using SSM, J Oper Res Soc 45(11) (1994), 1293-1303.
    • (1994) J Oper Res Soc , vol.45 , Issue.11 , pp. 1293-1303
    • Kreher, H.1
  • 54
    • 33748417848 scopus 로고    scopus 로고
    • Integration of risk identification with business process models
    • J.H. Lambert, R.K. Jennings, and N.N. Joshi, Integration of risk identification with business process models, Syst Eng 9(3) (2006), 187-198.
    • (2006) Syst Eng , vol.9 , Issue.3 , pp. 187-198
    • Lambert, J.H.1    Jennings, R.K.2    Joshi, N.N.3
  • 55
    • 0031103914 scopus 로고    scopus 로고
    • Soft or and management practice: A study of the adoption and use of soft systems methodology
    • P.W.J. Ledington and J. Donaldson, Soft OR and management practice: A study of the adoption and use of soft systems methodology, J Oper Res Soc 48(3) (1997), 229-240..
    • (1997) J Oper Res Soc , vol.48 , pp. 229-240
    • Ledington, P.W.J.1    Donaldson, J.2
  • 56
    • 78649649551 scopus 로고    scopus 로고
    • Verification, validation & testing strategy and planning procedure
    • pages
    • V. Lévárdy, M. Hoppe, and E. Honour, Verification, validation & testing strategy and planning procedure, 14th Annu Int Symp INCOSE, 2004, 17 pages.
    • (2004) 14th Annu Int Symp INCOSE , pp. 17
    • Lévárdy, V.1    Hoppe, M.2    Honour, E.3
  • 58
    • 15844412260 scopus 로고    scopus 로고
    • Standardized project management may increase development projects success
    • D. Milosevic and P. Patanakul, Standardized project management may increase development projects success, Int J Project Management 23(3) (2005), 181-192.
    • (2005) Int J Project Management , vol.23 , Issue.3 , pp. 181-192
    • Milosevic, D.1    Patanakul, P.2
  • 59
    • 0026854131 scopus 로고
    • The use of soft systems methodology in practice
    • J. Mingers and S. Taylor, The use of soft systems methodology in practice, J Oper Res Soc 43(4) (1992), 321-332.
    • (1992) J Oper Res Soc , vol.43 , Issue.4 , pp. 321-332
    • Mingers, J.1    Taylor, S.2
  • 60
    • 34548594385 scopus 로고    scopus 로고
    • Moving from corporate strategy to project strategy
    • P. Morris and A. Jamieson, Moving from corporate strategy to project strategy, Project Management J 36(4) (2005), 5-18.
    • (2005) Project Management J , vol.36 , Issue.4 , pp. 5-18
    • Morris, P.1    Jamieson, A.2
  • 61
    • 0036531729 scopus 로고    scopus 로고
    • The use of multimethodology in practice- results of a survey of practitioners
    • I. Munro and J. Mingers, The use of multimethodology in practice- results of a survey of practitioners, J Oper Res Soc 53(4) (2002), 369-378.
    • (2002) J Oper Res Soc , vol.53 , Issue.4 , pp. 369-378
    • Munro, I.1    Mingers, J.2
  • 62
    • 52649153531 scopus 로고    scopus 로고
    • Space systems verification program and management process
    • S. Nagano, Space systems verification program and management process, Syst Eng 11(1) (2008), 27-38.
    • (2008) Syst Eng , vol.11 , Issue.1 , pp. 27-38
    • Nagano, S.1
  • 64
    • 0000966775 scopus 로고
    • Dual coding theory: Retrospect and current status
    • A. Paivio, Dual Coding Theory: Retrospect And Current Status, Canada Journal Of Psychology 45 (1991), 255-287.
    • (1991) Canada Journal of Psychology , vol.45 , pp. 255-287
    • Paivio, A.1
  • 66
    • 72249117504 scopus 로고    scopus 로고
    • Project Management Institute, Newtown Square, PA
    • PMI, An executive guide to OPM; transform strategy into results, Project Management Institute, Newtown Square, PA, 2004a, http://www.pmi.org/prod/groups/ public/documents/info/ pp-opm3execguide.pdf.
    • (2004) PMI, An Executive Guide to OPM; Transform Strategy into Results
  • 68
    • 1442279770 scopus 로고    scopus 로고
    • Project strategy: The key to project success, PICMET '03
    • Management of Engineering and Technology
    • M. Poli and A.J. Shenhar, Project strategy: The key to project success, PICMET '03, Portland Int Conf Technol Management for Reshaping the World, Management of Engineering and Technology, 2003, pp. 231-235.
    • (2003) Portland Int Conf Technol Management for Reshaping the World , pp. 231-235
    • Poli, M.1    Shenhar, A.J.2
  • 69
    • 26444490085 scopus 로고    scopus 로고
    • Network element testing using ttcn-3: Benefits and comparison
    • Springer, New York
    • G. Rao, K. Timmaraju, and T. Weigert, Network element testing using ttcn-3: Benefits and comparison, Lecture Notes in Computer Science, Springer, New York, 2005, Vol. 3530, pp. 265- 280.
    • (2005) Lecture Notes in Computer Science , vol.3530 , pp. 265-280
    • Rao, G.1    Timmaraju, K.2    Weigert, T.3
  • 70
    • 78649656649 scopus 로고    scopus 로고
    • T&E investment, capacity, and program execution
    • ITEA, Kaua'i, Hawaii
    • J. Riemer, T&E investment, capacity, and program execution, ITEA Int Symp, ITEA, Kaua'i, Hawaii, 2007, pp. 1-5.
    • (2007) ITEA Int Symp , pp. 1-5
    • Riemer, J.1
  • 72
    • 33748414748 scopus 로고    scopus 로고
    • Toward mission assurance: A framework for systems engineering management
    • B.J. Sauser, Toward mission assurance: A framework for systems engineering management, Syst Eng 9(3) (2006), 213-227.
    • (2006) Syst Eng , vol.9 , Issue.3 , pp. 213-227
    • Sauser, B.J.1
  • 73
    • 68549113109 scopus 로고    scopus 로고
    • Why projects fail? How contingency theory can provide new insights-A comparative analysis of NASA?s Mars climate orbiter loss
    • in press, corrected proof available online February 14, 2009
    • B.J. Sauser, R.R. Reilly, and A.J. Shenhar, Why projects fail? How contingency theory can provide new insights-a comparative analysis of NASA?s Mars Climate Orbiter loss, Int J Project Management (2009), in press, corrected proof available online February 14, 2009.
    • (2009) Int J Project Management
    • Sauser, B.J.1    Reilly, R.R.2    Shenhar, A.J.3
  • 74
    • 8644268192 scopus 로고    scopus 로고
    • Strategic Project Leadership® toward a strategic approach to project management
    • A.J. Shenhar, Strategic Project Leadership® toward a strategic approach to project management, R&D Management 34(5) (2004), 569-578.
    • (2004) R&D Management , vol.34 , Issue.5 , pp. 569-578
    • Shenhar, A.J.1
  • 77
    • 78649653698 scopus 로고    scopus 로고
    • The four-element framework: A mission-focused test and evaluation strategy
    • B. Simmons and C.M. Wilcox, The four-element framework: A mission-focused test and evaluation strategy, ITEA J Test Eval 28(3) (2007), 61-69.
    • (2007) ITEA J Test Eval , vol.28 , Issue.3 , pp. 61-69
    • Simmons, B.1    Wilcox, C.M.2
  • 80
    • 0033150104 scopus 로고    scopus 로고
    • A practical use of key success factors to improve the effectiveness of project management
    • F. Toney and R. Powers, A practical use of key success factors to improve the effectiveness of project management, Int J Project Management 17(3) (1999), 139-145.
    • (1999) Int J Project Management , vol.17 , Issue.3 , pp. 139-145
    • Toney, F.1    Powers, R.2
  • 81
    • 78649637363 scopus 로고    scopus 로고
    • Operational test agencies: Enhancing operational realism in T&E
    • S. Voetsch and S. Whitehead, Operational test agencies: Enhancing operational realism in T&E, ITEA J 29(2) (2008), 142-146.
    • (2008) ITEA J , vol.29 , Issue.2 , pp. 142-146
    • Voetsch, S.1    Whitehead, S.2
  • 82
    • 33846862656 scopus 로고    scopus 로고
    • Fields of application of SSM: A categorization of publications
    • H.v.d. Water, M. Schinkel, and R. Rozier, Fields of application of SSM: A categorization of publications, J Oper Res Soc 58(3) (2007), 271-287.
    • (2007) J Oper Res Soc , vol.58 , Issue.3 , pp. 271-287
    • Water, H.V.D.1    Schinkel, M.2    Rozier, R.3
  • 83
    • 78649652618 scopus 로고    scopus 로고
    • Chapter 3: Assessing and reporting maturity level, Artech House
    • R.K. Wysocki, Project management process improvement -Chapter 3: Assessing and reporting maturity level, Artech House iv(5896) (2004), 52-62.
    • (2004) Project Management Process Improvement , vol.4 , Issue.5896 , pp. 52-62
    • Wysocki, R.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.