-
1
-
-
78649668883
-
Defense Science Board Task Force study of developmental test and evaluation
-
P. Adolph, C. Dipetto, and E. Seglie, Defense Science Board Task Force study of developmental test and evaluation, ITEA J 29(3) (2008), 215-220.
-
(2008)
ITEA J
, vol.29
, Issue.3
, pp. 215-220
-
-
Adolph, P.1
Dipetto, C.2
Seglie, E.3
-
2
-
-
78649678246
-
The 800-pound (364 kg) gorilla
-
W.D. Bell and D. Eng., The 800-pound (364 kg) gorilla, ITEA J(3) 29 (2008), 275-277.
-
(2008)
ITEA J
, vol.29
, pp. 275-277
-
-
Bell, W.D.1
Eng., D.2
-
3
-
-
36849076265
-
Communicating strategic intent with Systemigrams: Application to the network-enabled challenge
-
C.D. Blair, J.T. Boardman, and B.J. Sauser, Communicating strategic intent with Systemigrams: Application to the network-enabled challenge, Syst Eng 10(4) (2007), 309-322.
-
(2007)
Syst Eng
, vol.10
, Issue.4
, pp. 309-322
-
-
Blair, C.D.1
Boardman, J.T.2
Sauser, B.J.3
-
5
-
-
0028380745
-
A process model for unifying systems engineering and project management
-
J.T. Boardman, A process model for unifying systems engineering and project management, Eng Management J 4(1) (1994), 25-35.
-
(1994)
Eng Management J
, vol.4
, Issue.1
, pp. 25-35
-
-
Boardman, J.T.1
-
8
-
-
0030105210
-
Integrated process improvement in design and manufacture using a systems approach
-
J.T. Boardman and A.J. Cole, Integrated process improvement in design and manufacture using a systems approach, IEE Process- Control Theory Appl 143(2) (1996), 171-185.
-
(1996)
IEE Process- Control Theory Appl
, vol.143
, Issue.2
, pp. 171-185
-
-
Boardman, J.T.1
Cole, A.J.2
-
9
-
-
84962536724
-
-
CRC Press, Boca Raton, FL
-
J. Boardman and B. Sauser, Systems thinking: Coping with 21st century problems (industrial innovation), CRC Press, Boca Raton, FL, 2008, Chap. 6.
-
(2008)
Systems Thinking: Coping with 21st Century Problems (Industrial Innovation)
-
-
Boardman, J.1
Sauser, B.2
-
10
-
-
78649674192
-
-
Master's Thesis, Naval Postgraduate School, Monterey, CA
-
W.M. Branch, The systems approach to management: A paradigm for the test and evaluation process, Master's Thesis, Naval Postgraduate School, Monterey, CA, 1976.
-
(1976)
The Systems Approach to Management: A Paradigm for the Test and Evaluation Process
-
-
Branch, W.M.1
-
12
-
-
0030389112
-
Developing a testing maturity model for software test process evaluation and improvement
-
Hawaii
-
I. Burnstein, T. Suwanassart, and R. Carlson, Developing a testing maturity model for software test process evaluation and improvement, Int Test and Evaluation Conf, ITEA, Hawaii, 1996, 581-589.
-
(1996)
Int Test and Evaluation Conf, ITEA
, pp. 581-589
-
-
Burnstein, I.1
Suwanassart, T.2
Carlson, R.3
-
13
-
-
78649662234
-
-
Carnegie Mellon, S.E.I., "Introduction to CMMI, http://www.sei.cmu. edu/programs/acquisition-support/present ations/tutorialmod2.pdf, 2005.
-
Carnegie Mellon, S.E.I., "Introduction to CMMI, http://www.sei.cmu. edu/programs/acquisition-support/present ations/tutorialmod2.pdf, 2005.
-
-
-
-
14
-
-
78649681416
-
Identifying systemic program issues based on real program findings
-
D. Castellano, Identifying systemic program issues based on real program findings, PEO/SYSCOM Conf, 2006.
-
(2006)
PEO/SYSCOM Conf
-
-
Castellano, D.1
-
15
-
-
78649665404
-
Sharing lessons learned based on systemic program findings
-
Kaua'i, Hawaii
-
D. Castellano, Sharing lessons learned based on systemic program findings, ITEA Int Symp, Kaua'i, Hawaii, 2007.
-
(2007)
ITEA Int Symp
-
-
Castellano, D.1
-
16
-
-
78649665402
-
Improving program success by applying systems engineering and reliability growth analysis
-
J.N. Chang and D.J. Rohall, Improving program success by applying systems engineering and reliability growth analysis, ITEA J 29(3) (2008), 267-274.
-
(2008)
ITEA J
, vol.29
, Issue.3
, pp. 267-274
-
-
Chang, J.N.1
Rohall, D.J.2
-
17
-
-
0008870938
-
-
Wiley, Chichester
-
P. Checkland, Systems thinking, systems practice, a formal system model, Wiley, Chichester, 1999, pp. 1-330.
-
(1999)
Systems Thinking, Systems Practice, A Formal System Model
, pp. 1-330
-
-
Checkland, P.1
-
18
-
-
0034344632
-
Soft systems methodology: A thirty year retrospective
-
P. Checkland, Soft systems methodology: A thirty year retrospective, Syst Res Behav Sci 17(1) (2000), 11-58.
-
(2000)
Syst Res Behav Sci
, vol.17
, Issue.1
, pp. 11-58
-
-
Checkland, P.1
-
19
-
-
0003543744
-
-
Wiley, Chichester
-
P.B. Checkland, Systems thinking, systems practice, Wiley, Chichester, 1981, pp. 1-330.
-
(1981)
Systems Thinking, Systems Practice
, pp. 1-330
-
-
Checkland, P.B.1
-
20
-
-
33845771763
-
Building a holarchy using business Process-Oriented Holonic (PROH) modeling
-
B.T. Clegg, Building a holarchy using business Process-Oriented Holonic (PROH) modeling, IEEE Trans Syst Man Cybernet-Part A Syst Hum 37(1) (2007), 23-40.
-
(2007)
IEEE Trans Syst Man Cybernet-Part A Syst Hum
, vol.37
, Issue.1
, pp. 23-40
-
-
Clegg, B.T.1
-
21
-
-
12444268456
-
Process integration and improvement using systemic diagrams and a human-centred approach
-
B.T. Clegg and J.T. Boardman, Process integration and improvement using systemic diagrams and a human-centred approach, Concurrent Eng 4(2) (1996a), 119-136.
-
(1996)
Concurrent Eng
, vol.4
, Issue.2
, pp. 119-136
-
-
Clegg, B.T.1
Boardman, J.T.2
-
22
-
-
0030274939
-
Systems approach to process improvement in design and manufacture
-
(1996/171), Available:
-
B.T. Clegg and J.T. Boardman, Systems approach to process improvement in design and manufacture. 1996b = IEE Colloquia (1996/171), 311-319. Available: http://ieeexplore.ieee.org/ stamp/stamp.jsp?tp=&arnumber= 640527&isnumber=13888
-
(1996)
IEE Colloquia
, vol.311-319
-
-
Clegg, B.T.1
Boardman, J.T.2
-
23
-
-
3543132361
-
A soft systems methodology to support business process change towards concurrent engineering
-
BC, Canada
-
B.T. Clegg and J.T. Boardman, A soft systems methodology to support business process change towards concurrent engineering, Int Conf INCOSE, Vancouver, BC, Canada, 1998, pp. 697- 704.
-
(1998)
Int Conf INCOSE, Vancouver
, pp. 697-704
-
-
Clegg, B.T.1
Boardman, J.T.2
-
24
-
-
34249847185
-
Applying the concept of patterns to systems architecture
-
R.J. Cloutier and D. Verma, Applying the concept of patterns to systems architecture, Syst Eng 10(2) (2007), 138-154.
-
(2007)
Syst Eng
, vol.10
, Issue.2
, pp. 138-154
-
-
Cloutier, R.J.1
Verma, D.2
-
25
-
-
0029193135
-
A computer-based process handbook for a systems engineering business
-
A.J. Cole, S.J. Wolak, and J.T. Boardman, A computer-based process handbook for a systems engineering business, Proc Seventh Int Workshop Computer-Aided Software Eng,, IEEE Computer Society, 1995, p. 172.
-
(1995)
Proc Seventh Int Workshop Computer-Aided Software Eng, IEEE Computer Society
, pp. 172
-
-
Cole, A.J.1
Wolak, S.J.2
Boardman, J.T.3
-
26
-
-
78649670152
-
-
D.C. Conner, Managing at the speed of change: how resilient managers succeed and prosper where others fail, 1992, p. 282.
-
D.C. Conner, Managing at the speed of change: how resilient managers succeed and prosper where others fail, 1992, p. 282.
-
-
-
-
27
-
-
0034427461
-
Capability maturity models support of modeling and simulation verification, validation, and accreditation
-
C.L. Conwell, R. Enright, M.A. Stutzman, J. A. Joines, R.R. Burton, K. Kung, and P.A. Fishwick (Editors)
-
C.L. Conwell, R. Enright, M.A. Stutzman, J. A. Joines, R.R. Burton, K. Kung, and P.A. Fishwick (Editors), Capability maturity models support of modeling and simulation verification, validation, and accreditation, Proc 2000 Winter Simulation Conf, IEEE, 2000, pp. 819-828.
-
Proc 2000 Winter Simulation Conf IEEE
, vol.2000
, pp. 819-828
-
-
-
29
-
-
0343630926
-
The effects of software processes on meeting targets and quality
-
C. Deephouse, D. Goldenson, M. Kellner, and T. Mukhopadhyay, The effects of software processes on meeting targets and quality, Proc 28th Hawaii Int Conf Syst Sci, IEEE Computer Society, 1995, pp. 710-719.
-
(1995)
Proc 28th Hawaii Int Conf Syst Sci IEEE Computer Society
, pp. 710-719
-
-
Deephouse, C.1
Goldenson, D.2
Kellner, M.3
Mukhopadhyay, T.4
-
30
-
-
0003964033
-
-
Massachusetts Institute of Technology, Center for Advanced Educational Study (MIT-CAES), Cambridge, MA
-
E.W. Deming, Out of the crisis, Massachusetts Institute of Technology, Center for Advanced Educational Study (MIT-CAES), Cambridge, MA, 1986, pp. 1-305.
-
(1986)
Out of the Crisis
, pp. 1-305
-
-
Deming, E.W.1
-
31
-
-
78649655001
-
-
FAA, Project management: Current state assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ 2003
-
FAA, Project management: Current state assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ, 2003.
-
-
-
-
32
-
-
78649653436
-
-
FAA, Integrated engineering services: Project office implementation proposal, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ 2004
-
FAA, Integrated engineering services: Project office implementation proposal, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ, 2004.
-
-
-
-
33
-
-
78649680166
-
-
FAA, Acquisition management policy: Test and evaluation," DOT (Editor), Federal Aviation Administration, Washington, DC 2006a
-
FAA, Acquisition management policy: Test and evaluation," DOT (Editor), Federal Aviation Administration, Washington, DC, 2006a.
-
-
-
-
34
-
-
78649659316
-
-
FAA, FAA ATO strategy map, DOT (Editor), Federal Aviation Administration, Washington, DC 2006b
-
FAA, FAA ATO strategy map, DOT (Editor), Federal Aviation Administration, Washington, DC, 2006b.
-
-
-
-
35
-
-
78649679826
-
-
FAA, Verification and validation protocol of operations-White Paper: Improvement recommendations, DOT (Editor), Federal Aviation Administration, Atlantic City, NJ, 2006, pp. 1-10.
-
FAA, Verification and validation protocol of operations-White Paper: Improvement recommendations, DOT (Editor), Federal Aviation Administration, Atlantic City, NJ, 2006, pp. 1-10.
-
-
-
-
36
-
-
78649684559
-
-
FAA, FAA ATO operations planning strategy map, DOT (Editor), Federal Aviation Administration Washington, DC 2007a
-
FAA, FAA ATO operations planning strategy map, DOT (Editor), Federal Aviation Administration Washington, DC, 2007a.
-
-
-
-
37
-
-
78649677970
-
-
FAA, Project management: Current State assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ 2007b
-
FAA, Project management: Current State assessment, DOT (Editor), Federal Aviation Administration WJHTC, Atlantic City, NJ, 2007b.
-
-
-
-
38
-
-
77958191578
-
-
RAND Corporation, prepared for the US Air Force, Pittsburgh, PA
-
B. Fox, M. Boito, J.C. Graser and O. Younossi, Test and evaluation trends and costs for aircraft and guided weapons, RAND Corporation, prepared for the US Air Force, Pittsburgh, PA, 2004.
-
(2004)
Test and Evaluation Trends and Costs for Aircraft and Guided Weapons
-
-
Fox, B.1
Boito, M.2
Graser, J.C.3
Younossi, O.4
-
39
-
-
0028734238
-
Estimating the value of inspections and early testing for software projects
-
L. Franz and J.C. Shih, Estimating the value of inspections and early testing for software projects, Hewlett-Packard J 45(6) (1994), 60-67.
-
(1994)
Hewlett-Packard J
, vol.45
, Issue.6
, pp. 60-67
-
-
Franz, L.1
Shih, J.C.2
-
40
-
-
22744451097
-
-
GAO, Government Accounting Office, Washington, DC
-
GAO, Best practices: A more constructive test approach is key to better weapon system outcomes, Government Accounting Office, Washington, DC, 2000, pp. 1-71.
-
(2000)
Best Practices: A More Constructive Test Approach Is Key to Better Weapon System Outcomes
, pp. 1-71
-
-
-
41
-
-
77958466637
-
-
Government Accounting Office, Washington, DC
-
GAO and M. Sullivan, Best practices: Increased focus on requirements and oversight needed to improve DOD's acquisition environment and weapon system quality, Government Accounting Office, Washington, DC, 2008, 1-61.
-
(2008)
Best Practices: Increased Focus on Requirements and Oversight Needed to Improve DOD's Acquisition Environment and Weapon System Quality
, pp. 1-61
-
-
Sullivan, M.1
-
42
-
-
78649659315
-
-
GAO, Report To The Chairman, Subcommittee On Aviation, Committee On Transportation And Infrastructure, House Of Representatives, Washington, DC
-
GAO, K. Siggerud, and T. Conquest, Air traffic control: FAA needs to ensure better coordination when approving air traffic control systems, Report To The Chairman, Subcommittee On Aviation, Committee On Transportation And Infrastructure, House Of Representatives, Washington, DC, 2004.
-
(2004)
Air Traffic Control: FAA Needs to Ensure Better Coordination When Approving Air Traffic Control Systems
-
-
Siggerud, K.1
Conquest, T.2
-
43
-
-
37849054468
-
A multi-phase research program investigating Project Management Offices (PMOs): The results of phase 1
-
B. Hobbs and M. Aubry, A multi-phase research program investigating Project Management Offices (PMOs): The results of phase 1, Project Management J 38(1) (2007), 74-86.
-
(2007)
Project Management J
, vol.38
, Issue.1
, pp. 74-86
-
-
Hobbs, B.1
Aubry, M.2
-
44
-
-
84883409022
-
Improving the VVT process: Evaluating the SYSTEST results in six industrial pilot projects
-
M. Hoppe and A. Engel, Improving the VVT process: Evaluating the SYSTEST results in six industrial pilot projects, INCOSE, Seattle, WA, 2005, 17 pages.
-
(2005)
INCOSE, Seattle, WA
, pp. 17
-
-
Hoppe, M.1
Engel, A.2
-
45
-
-
36849060304
-
Systems test: Improving the verification validation, and testing process- assessing six industrial pilot projects
-
M. Hoppe, A. Engel, and S. Shachar, Systems test: Improving the verification, validation, and testing process- assessing six industrial pilot projects, Syst Eng 10(4) (2007), 323-347.
-
(2007)
Syst Eng
, vol.10
, Issue.4
, pp. 323-347
-
-
Hoppe, M.1
Engel, A.2
Shachar, S.3
-
46
-
-
84921526648
-
Systems and software engineering- system life cycle processes
-
ISO/IEC, IEE Std 15288:2008
-
ISO/IEC, IEE Std 15288:2008, Systems and software engineering- system life cycle processes, International Organization For Standardization/IEC-IEEE, Geneva, Switzerland, 2008.
-
(2008)
International Organization for Standardization/IEC-IEEE
-
-
-
47
-
-
78649652916
-
-
J. Juran and A.B. Godfrey, Juran?s quality handbook, McGraw Hill, New York, 1999, pp. 1-85.
-
J. Juran and A.B. Godfrey, Juran?s quality handbook, McGraw Hill, New York, 1999, pp. 1-85.
-
-
-
-
48
-
-
78649662726
-
Enhancing the role of test and evaluation in the acquisition process to increase the probability of the delivery of equipment that meets the needs of the users
-
J. Kasser, Enhancing the role of test and evaluation in the acquisition process to increase the probability of the delivery of equipment that meets the needs of the users, Proc Syst Test Eval Conf (SETE 2000), 2000, 5 pages.
-
(2000)
Proc Syst Test Eval Conf (SETE 2000)
, pp. 5
-
-
Kasser, J.1
-
49
-
-
78649678536
-
-
Wiley New York
-
H. Kerzner, Applied project management best practices on implementation, Wiley, New York, 2000, pp. 1-534.
-
(2000)
, pp. 1-534
-
-
Kerzner, H.1
-
50
-
-
0003457608
-
-
Wiley, Hoboken, NJ
-
H. Kerzner, Project management-a systems approach to planning, scheduling & controlling, Wiley, Hoboken, NJ, 2003, pp. 1-891.
-
(2003)
Project Management-A Systems Approach to Planning, Scheduling & Controlling
, pp. 1-891
-
-
Kerzner, H.1
-
51
-
-
3342960187
-
-
PM Network, Project Management Institute, Newtown Square, PA
-
J. Knutson, The project office: An evolutionary implementation plan, PM Network, Project Management Institute, Newtown Square, PA, 1998, pp. 14-16.
-
(1998)
The Project Office: An Evolutionary Implementation Plan
, pp. 14-16
-
-
Knutson, J.1
-
52
-
-
78649647414
-
Project office: An evolutionary implementation plan
-
Project Management Institute, Newtown Square, PA, pages
-
J. Knutson, Project office: An evolutionary implementation plan, Proc 30th Annu Project Management Inst, Project Management Institute, Newtown Square, PA, 1999, 5 pages.
-
(1999)
Proc 30th Annu Project Management Inst
, pp. 5
-
-
Knutson, J.1
-
53
-
-
0028546708
-
Some recurring themes in using SSM
-
H. Kreher, Some recurring themes in using SSM, J Oper Res Soc 45(11) (1994), 1293-1303.
-
(1994)
J Oper Res Soc
, vol.45
, Issue.11
, pp. 1293-1303
-
-
Kreher, H.1
-
54
-
-
33748417848
-
Integration of risk identification with business process models
-
J.H. Lambert, R.K. Jennings, and N.N. Joshi, Integration of risk identification with business process models, Syst Eng 9(3) (2006), 187-198.
-
(2006)
Syst Eng
, vol.9
, Issue.3
, pp. 187-198
-
-
Lambert, J.H.1
Jennings, R.K.2
Joshi, N.N.3
-
55
-
-
0031103914
-
Soft or and management practice: A study of the adoption and use of soft systems methodology
-
P.W.J. Ledington and J. Donaldson, Soft OR and management practice: A study of the adoption and use of soft systems methodology, J Oper Res Soc 48(3) (1997), 229-240..
-
(1997)
J Oper Res Soc
, vol.48
, pp. 229-240
-
-
Ledington, P.W.J.1
Donaldson, J.2
-
56
-
-
78649649551
-
Verification, validation & testing strategy and planning procedure
-
pages
-
V. Lévárdy, M. Hoppe, and E. Honour, Verification, validation & testing strategy and planning procedure, 14th Annu Int Symp INCOSE, 2004, 17 pages.
-
(2004)
14th Annu Int Symp INCOSE
, pp. 17
-
-
Lévárdy, V.1
Hoppe, M.2
Honour, E.3
-
57
-
-
0036021537
-
Neural bases of image and language interactions
-
B. Mazoyer, N. Tzourio-Mazoyer, A. Mazard, M. Denis, and E. Mellet, Neural bases of image and language interactions, Int J Psychol 37(4) (2002), 204-208.
-
(2002)
Int J Psychol
, vol.37
, Issue.4
, pp. 204-208
-
-
Mazoyer, B.1
Tzourio-Mazoyer, N.2
Mazard, A.3
Denis, M.4
Mellet, E.5
-
58
-
-
15844412260
-
Standardized project management may increase development projects success
-
D. Milosevic and P. Patanakul, Standardized project management may increase development projects success, Int J Project Management 23(3) (2005), 181-192.
-
(2005)
Int J Project Management
, vol.23
, Issue.3
, pp. 181-192
-
-
Milosevic, D.1
Patanakul, P.2
-
59
-
-
0026854131
-
The use of soft systems methodology in practice
-
J. Mingers and S. Taylor, The use of soft systems methodology in practice, J Oper Res Soc 43(4) (1992), 321-332.
-
(1992)
J Oper Res Soc
, vol.43
, Issue.4
, pp. 321-332
-
-
Mingers, J.1
Taylor, S.2
-
60
-
-
34548594385
-
Moving from corporate strategy to project strategy
-
P. Morris and A. Jamieson, Moving from corporate strategy to project strategy, Project Management J 36(4) (2005), 5-18.
-
(2005)
Project Management J
, vol.36
, Issue.4
, pp. 5-18
-
-
Morris, P.1
Jamieson, A.2
-
61
-
-
0036531729
-
The use of multimethodology in practice- results of a survey of practitioners
-
I. Munro and J. Mingers, The use of multimethodology in practice- results of a survey of practitioners, J Oper Res Soc 53(4) (2002), 369-378.
-
(2002)
J Oper Res Soc
, vol.53
, Issue.4
, pp. 369-378
-
-
Munro, I.1
Mingers, J.2
-
62
-
-
52649153531
-
Space systems verification program and management process
-
S. Nagano, Space systems verification program and management process, Syst Eng 11(1) (2008), 27-38.
-
(2008)
Syst Eng
, vol.11
, Issue.1
, pp. 27-38
-
-
Nagano, S.1
-
63
-
-
84925282215
-
-
V. Nair And M.L. Cohen (Editors), National Academy of Sciences, Washington, DC
-
NRC, V. Nair, and M.L. Cohen, Testing of defense systems in an evolutionary acquisition environment, V. Nair And M.L. Cohen (Editors), National Academy of Sciences, Washington, DC, 2006, pp. 1-76.
-
(2006)
Testing of Defense Systems in An Evolutionary Acquisition Environment
, pp. 1-76
-
-
Nair, N.V.1
Cohen, M.L.2
-
64
-
-
0000966775
-
Dual coding theory: Retrospect and current status
-
A. Paivio, Dual Coding Theory: Retrospect And Current Status, Canada Journal Of Psychology 45 (1991), 255-287.
-
(1991)
Canada Journal of Psychology
, vol.45
, pp. 255-287
-
-
Paivio, A.1
-
65
-
-
78649642007
-
-
Project Management Institute, Newtown Square, PA
-
PMI, Government extension to a guide to the project management body of knowledge (PMBOK® guide), Project Management Institute, Newtown Square, PA, 2000, 1-89.
-
(2000)
PMI, Government Extension to A Guide to the Project Management Body of Knowledge (PMBOK® Guide
, pp. 1-89
-
-
-
66
-
-
72249117504
-
-
Project Management Institute, Newtown Square, PA
-
PMI, An executive guide to OPM; transform strategy into results, Project Management Institute, Newtown Square, PA, 2004a, http://www.pmi.org/prod/groups/ public/documents/info/ pp-opm3execguide.pdf.
-
(2004)
PMI, An Executive Guide to OPM; Transform Strategy into Results
-
-
-
67
-
-
58049139009
-
-
3rd edition, Project Management Institute, Newtown Square, PA
-
PMI®, A guide to the project management body of knowledge (PMBOK® guide), 3rd edition, Project Management Institute, Newtown Square, PA, 2004b, pp. 1-216.
-
(2004)
PMI®, A Guide to the Project Management Body of Knowledge (PMBOK® Guide
, pp. 1-216
-
-
-
68
-
-
1442279770
-
Project strategy: The key to project success, PICMET '03
-
Management of Engineering and Technology
-
M. Poli and A.J. Shenhar, Project strategy: The key to project success, PICMET '03, Portland Int Conf Technol Management for Reshaping the World, Management of Engineering and Technology, 2003, pp. 231-235.
-
(2003)
Portland Int Conf Technol Management for Reshaping the World
, pp. 231-235
-
-
Poli, M.1
Shenhar, A.J.2
-
69
-
-
26444490085
-
Network element testing using ttcn-3: Benefits and comparison
-
Springer, New York
-
G. Rao, K. Timmaraju, and T. Weigert, Network element testing using ttcn-3: Benefits and comparison, Lecture Notes in Computer Science, Springer, New York, 2005, Vol. 3530, pp. 265- 280.
-
(2005)
Lecture Notes in Computer Science
, vol.3530
, pp. 265-280
-
-
Rao, G.1
Timmaraju, K.2
Weigert, T.3
-
70
-
-
78649656649
-
T&E investment, capacity, and program execution
-
ITEA, Kaua'i, Hawaii
-
J. Riemer, T&E investment, capacity, and program execution, ITEA Int Symp, ITEA, Kaua'i, Hawaii, 2007, pp. 1-5.
-
(2007)
ITEA Int Symp
, pp. 1-5
-
-
Riemer, J.1
-
72
-
-
33748414748
-
Toward mission assurance: A framework for systems engineering management
-
B.J. Sauser, Toward mission assurance: A framework for systems engineering management, Syst Eng 9(3) (2006), 213-227.
-
(2006)
Syst Eng
, vol.9
, Issue.3
, pp. 213-227
-
-
Sauser, B.J.1
-
73
-
-
68549113109
-
Why projects fail? How contingency theory can provide new insights-A comparative analysis of NASA?s Mars climate orbiter loss
-
in press, corrected proof available online February 14, 2009
-
B.J. Sauser, R.R. Reilly, and A.J. Shenhar, Why projects fail? How contingency theory can provide new insights-a comparative analysis of NASA?s Mars Climate Orbiter loss, Int J Project Management (2009), in press, corrected proof available online February 14, 2009.
-
(2009)
Int J Project Management
-
-
Sauser, B.J.1
Reilly, R.R.2
Shenhar, A.J.3
-
74
-
-
8644268192
-
Strategic Project Leadership® toward a strategic approach to project management
-
A.J. Shenhar, Strategic Project Leadership® toward a strategic approach to project management, R&D Management 34(5) (2004), 569-578.
-
(2004)
R&D Management
, vol.34
, Issue.5
, pp. 569-578
-
-
Shenhar, A.J.1
-
76
-
-
78649666949
-
A new framework for strategic project management
-
Honolulu, HI
-
A.J. Shenhar, D. Dvir. W. Guth, T. Lechler, P. Panatakul, M. Poli, and J. Stefanovic, A new framework for strategic project management, Acad Management Annu Meeting, Honolulu, HI, 2005.
-
(2005)
Acad Management Annu Meeting
-
-
Shenhar, A.J.1
Dvir. Guth, W.D.2
Lechler, T.3
Panatakul, P.4
Poli, M.5
Stefanovic, J.6
-
77
-
-
78649653698
-
The four-element framework: A mission-focused test and evaluation strategy
-
B. Simmons and C.M. Wilcox, The four-element framework: A mission-focused test and evaluation strategy, ITEA J Test Eval 28(3) (2007), 61-69.
-
(2007)
ITEA J Test Eval
, vol.28
, Issue.3
, pp. 61-69
-
-
Simmons, B.1
Wilcox, C.M.2
-
78
-
-
78549294984
-
-
RAND Corp., prepared for the US Air Force, Pittsburgh, PA
-
D.E. Stem, M. Boito, and O. Younossi, Systems engineering and program management trends and costs for aircraft and guided weapons programs, RAND Corp., prepared for the US Air Force, Pittsburgh, PA, 2006.
-
(2006)
Systems Engineering and Program Management Trends and Costs for Aircraft and Guided Weapons Programs
-
-
Stem, D.E.1
Boito, M.2
Younossi, O.3
-
79
-
-
47249106769
-
A case study of project and stakeholder management failures: Lessons learned
-
J.S. Sutterfield, S.S. Friday-Stroud, and S.L. Shivers-Blackwell, A case study of project and stakeholder management failures: Lessons learned, Project Management J 37(5) (2006), 26-35.
-
(2006)
Project Management J
, vol.37
, Issue.5
, pp. 26-35
-
-
Sutterfield, J.S.1
Friday-Stroud, S.S.2
Shivers-Blackwell, S.L.3
-
80
-
-
0033150104
-
A practical use of key success factors to improve the effectiveness of project management
-
F. Toney and R. Powers, A practical use of key success factors to improve the effectiveness of project management, Int J Project Management 17(3) (1999), 139-145.
-
(1999)
Int J Project Management
, vol.17
, Issue.3
, pp. 139-145
-
-
Toney, F.1
Powers, R.2
-
81
-
-
78649637363
-
Operational test agencies: Enhancing operational realism in T&E
-
S. Voetsch and S. Whitehead, Operational test agencies: Enhancing operational realism in T&E, ITEA J 29(2) (2008), 142-146.
-
(2008)
ITEA J
, vol.29
, Issue.2
, pp. 142-146
-
-
Voetsch, S.1
Whitehead, S.2
-
82
-
-
33846862656
-
Fields of application of SSM: A categorization of publications
-
H.v.d. Water, M. Schinkel, and R. Rozier, Fields of application of SSM: A categorization of publications, J Oper Res Soc 58(3) (2007), 271-287.
-
(2007)
J Oper Res Soc
, vol.58
, Issue.3
, pp. 271-287
-
-
Water, H.V.D.1
Schinkel, M.2
Rozier, R.3
-
83
-
-
78649652618
-
-
Chapter 3: Assessing and reporting maturity level, Artech House
-
R.K. Wysocki, Project management process improvement -Chapter 3: Assessing and reporting maturity level, Artech House iv(5896) (2004), 52-62.
-
(2004)
Project Management Process Improvement
, vol.4
, Issue.5896
, pp. 52-62
-
-
Wysocki, R.K.1
|