메뉴 건너뛰기




Volumn 23, Issue 12, 2010, Pages 1149-1157

Predicting the effects of cycle time variability on the efficiency of electronics assembly mixed-model, zero-buffer flow processing lines

Author keywords

discrete event simulation; electronics manufacture; flow process; high product variety low demand volume flow processing; mixed model assembly lines; scheduling; workstation cycle time variability

Indexed keywords

DISCRETE EVENT SIMULATION; INDUSTRIAL RESEARCH; PROCESSING; PRODUCT DESIGN; SCHEDULING;

EID: 78649502499     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/0951192X.2010.500679     Document Type: Article
Times cited : (20)

References (22)
  • 2
    • 67651205275 scopus 로고    scopus 로고
    • Production planning of mixed-model assembly lines: Overview and extensions
    • Boysen, N., et al., 2009. Production planning of mixed-model assembly lines: overview and extensions. Production Planning and Control, 20(5), 455-471.
    • (2009) Production Planning and Control , vol.20 , Issue.5 , pp. 455-471
    • Boysen, N.1
  • 3
    • 0043171613 scopus 로고
    • A simple formulae for estimating throughput of serial production lines with variable processing times and limited buffer capacity
    • Blumenfeld, D. E., 1990. A simple formulae for estimating throughput of serial production lines with variable processing times and limited buffer capacity. International Journal of Production Research, 28(6), 1163-1182.
    • (1990) International Journal of Production Research , vol.28 , Issue.6 , pp. 1163-1182
    • Blumenfeld, D.E.1
  • 4
    • 0017020360 scopus 로고
    • Location of variable work stations and the performance of production flow lines
    • Carnall, C. A. and Wild, R., 1976. Location of variable work stations and the performance of production flow lines. International Journal of Production Research, 14(6), 703-710.
    • (1976) International Journal of Production Research , vol.14 , Issue.6 , pp. 703-710
    • Carnall, C.A.1    Wild, R.2
  • 5
    • 33744819775 scopus 로고    scopus 로고
    • A review of lean assessment in organizations: An exploratory study of lean practices by electronics manufacturers
    • Doolen, T. L. and Hacker, M. E., 2005. A review of lean assessment in organizations: an exploratory study of lean practices by electronics manufacturers. Journal of Manufacturing Systems, 24(1), 55-56.
    • (2005) Journal of Manufacturing Systems , vol.24 , Issue.1 , pp. 55-56
    • Doolen, T.L.1    Hacker, M.E.2
  • 6
    • 0018328573 scopus 로고
    • Effect of inequality of interstate buffer capacities and operation time variability on the efficiency of production line systems
    • El Rayah, T. E., 1979. Effect of inequality of interstate buffer capacities and operation time variability on the efficiency of production line systems. International Journal of Production Research, 17(1), 77-89.
    • (1979) International Journal of Production Research , vol.17 , Issue.1 , pp. 77-89
    • El Rayah, E.T.1
  • 8
    • 49749134297 scopus 로고    scopus 로고
    • A comparison of scheduling approaches for a make-to-order electronics manufacturer
    • Heath, S. K. and Morrice, D. J., 2007. A comparison of scheduling approaches for a make-to-order electronics manufacturer. In: Proceedings of the 2007 Winter Simulation Conference, 1953-1960.
    • (2007) Proceedings of the 2007 Winter Simulation Conference , pp. 1953-1960
    • Heath, S.K.1    Morrice, D.J.2
  • 9
    • 0000901840 scopus 로고
    • Finite queues in series with Exponential or Erlang servicing times
    • Hillier, F. S. and Boling, R. W., 1967. Finite queues in series with Exponential or Erlang servicing times. Operations Research, 15, 286.
    • (1967) Operations Research , vol.15 , pp. 286
    • Hillier, F.S.1    Boling, R.W.2
  • 10
    • 0027574248 scopus 로고
    • Some data for applying the bowl phenomenon to large production line systems
    • Hillier, F. S. and So, K. C., 1993. Some data for applying the bowl phenomenon to large production line systems. International Journal of Production Research, 31(4), 811-822.
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 811-822
    • Hillier, F.S.1    So, K.C.2
  • 12
    • 0003169320 scopus 로고
    • Sequential arrays of waiting times
    • Hunt, G. C., 1956. Sequential arrays of waiting times. Operations Research, 4, 674-678.
    • (1956) Operations Research , vol.4 , pp. 674-678
    • Hunt, G.C.1
  • 14
    • 60749097710 scopus 로고    scopus 로고
    • Scheduling a multi-chip package assembly line with re-entrant processes and unrelated parallel machines
    • Lee, S.-J. and Lee, T.-E., 2008. Scheduling a multi-chip package assembly line with re-entrant processes and unrelated parallel machines. In: Proceedings of the 2008 Winter Simulation Conference, 2286-2291.
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 2286-2291
    • Lee, S.-J.1    Lee, T.-E.2
  • 16
    • 36849008762 scopus 로고    scopus 로고
    • A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs
    • Monkman, S. K., Morrice, D. J., and Bard, J. F., 2008. A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs. European Journal of Operational Research, 187, 1100-1114.
    • (2008) European Journal of Operational Research , vol.187 , pp. 1100-1114
    • Monkman, S.K.1    Morrice, D.J.2    Bard, J.F.3
  • 17
    • 1642436900 scopus 로고    scopus 로고
    • Designing reusable simulation modules for electronics manufacturing systems
    • Mukkamala, P. S., et al., 2003. Designing reusable simulation modules for electronics manufacturing systems. In: Proceedings of the 2003 Winter Simulation Conference, 1281-1299.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 1281-1299
    • Mukkamala, P.S.1
  • 18
    • 0041668645 scopus 로고
    • Numerical methods applicable to a production line with stochastic servers
    • Muth, E. J., 1977. Numerical methods applicable to a production line with stochastic servers. TIMS Studies in the Management Sciences, 7, 143-159.
    • (1977) TIMS Studies in the Management Sciences , vol.7 , pp. 143-159
    • Muth, E.J.1
  • 19
    • 0023435740 scopus 로고
    • The throughput rate of threestation production lines: A unifying solution
    • Muth, E. J. and Alkaff, A., 1987. The throughput rate of threestation production lines: a unifying solution. International Journal of Production Research, 25(10), 1405-1413.
    • (1987) International Journal of Production Research , vol.25 , Issue.10 , pp. 1405-1413
    • Muth, E.J.1    Alkaff, A.2
  • 20
    • 60749115904 scopus 로고    scopus 로고
    • Simulation based planning and scheduling system for TFT-LCD Fab
    • Park, B. C., et al., 2008. Simulation based planning and scheduling system for TFT-LCD Fab. In: Proceedings of the 2008 Winter Simulation Conference, 2271-2276.
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 2271-2276
    • Park, B.C.1
  • 22
    • 0032663354 scopus 로고    scopus 로고
    • A comparison of mean reduction versus variance reduction in processing times in flow shops
    • Taylor, G. D. and Heragu, S. S., 1999. A comparison of mean reduction versus variance reduction in processing times in flow shops. International Journal of Production Research, 37(9), 1919-1934.
    • (1999) International Journal of Production Research , vol.37 , Issue.9 , pp. 1919-1934
    • Taylor, G.D.1    Heragu, S.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.