메뉴 건너뛰기




Volumn 35, Issue 3, 2011, Pages 1157-1166

A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times

Author keywords

Multi objective model; Pareto optimal solutions; Preventive replacement; Spare part

Indexed keywords

AGE REPLACEMENT POLICY; CONSTRAINT METHODS; DECISION MAKERS; DEFECTED PARTS; MULTI OBJECTIVE; MULTIOBJECTIVE MODELS; NUMERICAL EXAMPLE; PARETO OPTIMAL SOLUTIONS; PLANNING HORIZONS; PRACTICAL ISSUES; PREFERRED SOLUTIONS; PREVENTIVE MAINTENANCE PLANNING; PREVENTIVE REPLACEMENT; PRODUCTIVITY INDEX; RESIDUAL LIFETIME; SIMULTANEOUS DETERMINATIONS; SOLUTION PROCEDURE; SPARE PARTS;

EID: 78549231562     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2010.08.003     Document Type: Article
Times cited : (49)

References (36)
  • 1
    • 0037432505 scopus 로고    scopus 로고
    • Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
    • Al-Najjar B., Alsyouf I. Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. Int. J. Prod. Econ. 2003, 84:85-100.
    • (2003) Int. J. Prod. Econ. , vol.84 , pp. 85-100
    • Al-Najjar, B.1    Alsyouf, I.2
  • 2
    • 33847071199 scopus 로고    scopus 로고
    • Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
    • Wang L., Jian C., Jun W. Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process. Int. J. Prod. Econ. 2007, 107:151-163.
    • (2007) Int. J. Prod. Econ. , vol.107 , pp. 151-163
    • Wang, L.1    Jian, C.2    Jun, W.3
  • 3
    • 0038181371 scopus 로고    scopus 로고
    • Surveillance test policy optimization through genetic algorithms using non-periodic intervention frequencies and considering seasonal constraints
    • Lapa C., Periera C., Melo P. Surveillance test policy optimization through genetic algorithms using non-periodic intervention frequencies and considering seasonal constraints. Reliab. Eng. Syst. Safe. 2003, 81:103-115.
    • (2003) Reliab. Eng. Syst. Safe. , vol.81 , pp. 103-115
    • Lapa, C.1    Periera, C.2    Melo, P.3
  • 4
    • 0033899891 scopus 로고    scopus 로고
    • Maximization of a nuclear system availability through maintenance scheduling optimization using a genetic algorithm
    • Lapa C., Periera C., Mol A.C. Maximization of a nuclear system availability through maintenance scheduling optimization using a genetic algorithm. Nucl. Eng. Des. 2000, 196:219-231.
    • (2000) Nucl. Eng. Des. , vol.196 , pp. 219-231
    • Lapa, C.1    Periera, C.2    Mol, A.C.3
  • 5
    • 0030291291 scopus 로고    scopus 로고
    • Utilizing Weibull failure rates in repair limit analysis for equipment replacement/preventive maintenance decisions
    • Love C.E., Guo R. Utilizing Weibull failure rates in repair limit analysis for equipment replacement/preventive maintenance decisions. J. Oper. Res. Soc. 1996, 47:1366-1376.
    • (1996) J. Oper. Res. Soc. , vol.47 , pp. 1366-1376
    • Love, C.E.1    Guo, R.2
  • 6
    • 0001869844 scopus 로고    scopus 로고
    • Reliability based design of systems considering preventive maintenance and minimal repair
    • Monga A., Zou M.J., Toogood R. Reliability based design of systems considering preventive maintenance and minimal repair. Int. J. Reliab. Qual. Safe. Eng. 1997, 4:55-71.
    • (1997) Int. J. Reliab. Qual. Safe. Eng. , vol.4 , pp. 55-71
    • Monga, A.1    Zou, M.J.2    Toogood, R.3
  • 7
    • 0033079417 scopus 로고    scopus 로고
    • Availability and cost functions for periodically inspected preventively maintained units
    • Vaurio J.K. Availability and cost functions for periodically inspected preventively maintained units. Reliab. Eng. Syst. Safe. 1999, 63:133-140.
    • (1999) Reliab. Eng. Syst. Safe. , vol.63 , pp. 133-140
    • Vaurio, J.K.1
  • 8
    • 0141963917 scopus 로고    scopus 로고
    • New method to minimize the preventive maintenance cost of series-parallel systems
    • Bris R. New method to minimize the preventive maintenance cost of series-parallel systems. Reliab. Eng. Syst. Safe. 2004, 82:247-255.
    • (2004) Reliab. Eng. Syst. Safe. , vol.82 , pp. 247-255
    • Bris, R.1
  • 9
    • 15844382738 scopus 로고    scopus 로고
    • New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization
    • Samrout M., Yalaoui F., Chatelet E., Chebbo N. New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization. Reliab. Eng. Syst. Safe. 2005, 89:346-364.
    • (2005) Reliab. Eng. Syst. Safe. , vol.89 , pp. 346-364
    • Samrout, M.1    Yalaoui, F.2    Chatelet, E.3    Chebbo, N.4
  • 10
    • 1642603342 scopus 로고    scopus 로고
    • Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
    • Chelbi A., Kadi D.A. Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance. Eur. J. Oper. Res. 2004, 156:712-723.
    • (2004) Eur. J. Oper. Res. , vol.156 , pp. 712-723
    • Chelbi, A.1    Kadi, D.A.2
  • 11
    • 0033893452 scopus 로고    scopus 로고
    • A tabu search algorithm for maintenance scheduling of generating units
    • El-Amin I., Duffuaa S., Abbas M. A tabu search algorithm for maintenance scheduling of generating units. Electr. Power Syst. Res. 2000, 54:91-99.
    • (2000) Electr. Power Syst. Res. , vol.54 , pp. 91-99
    • El-Amin, I.1    Duffuaa, S.2    Abbas, M.3
  • 12
    • 55549089986 scopus 로고    scopus 로고
    • A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
    • Chien Y. A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times. Appl. Math. Model. 2009, 33:1708-1718.
    • (2009) Appl. Math. Model. , vol.33 , pp. 1708-1718
    • Chien, Y.1
  • 13
    • 52149111376 scopus 로고    scopus 로고
    • Methodology of using delay-time analysis for a manufacturing industry
    • Jones B., Jenkinson I., Wang J. Methodology of using delay-time analysis for a manufacturing industry. Reliab. Eng. Syst. Safe. 2009, 94:111-124.
    • (2009) Reliab. Eng. Syst. Safe. , vol.94 , pp. 111-124
    • Jones, B.1    Jenkinson, I.2    Wang, J.3
  • 14
    • 0026821919 scopus 로고
    • Replacement policies of a shock model with imperfect preventive maintenance
    • Kijima M., Nakagawa M. Replacement policies of a shock model with imperfect preventive maintenance. Eur. J. Oper. Res. 1992, 57:100-110.
    • (1992) Eur. J. Oper. Res. , vol.57 , pp. 100-110
    • Kijima, M.1    Nakagawa, M.2
  • 15
    • 0030575689 scopus 로고    scopus 로고
    • Imperfect maintenance
    • Pham H., Wang H. Imperfect maintenance. Eur. J. Oper. Res. 1996, 94:425-438.
    • (1996) Eur. J. Oper. Res. , vol.94 , pp. 425-438
    • Pham, H.1    Wang, H.2
  • 16
    • 0000418998 scopus 로고
    • Optimal replacement policy for minimal repair model
    • Tahara A., Nishida T. Optimal replacement policy for minimal repair model. J. Oper. Res. Soc. Jpn. 1975, 18:113-124.
    • (1975) J. Oper. Res. Soc. Jpn. , vol.18 , pp. 113-124
    • Tahara, A.1    Nishida, T.2
  • 17
    • 0035479768 scopus 로고    scopus 로고
    • Optimizing preventive maintenance for mechanical components using genetic algorithms
    • Tsai Y.T., Wang K.S., Teng H.Y. Optimizing preventive maintenance for mechanical components using genetic algorithms. Reliab. Eng. Syst. Safe. 2002, 74:85-98.
    • (2002) Reliab. Eng. Syst. Safe. , vol.74 , pp. 85-98
    • Tsai, Y.T.1    Wang, K.S.2    Teng, H.Y.3
  • 18
    • 38749086074 scopus 로고    scopus 로고
    • Preventive maintenance and upgrade system: optimizing the whole performance system by components' replacement or rearrangement
    • Rachaniotis N.P., Pappis C.P. Preventive maintenance and upgrade system: optimizing the whole performance system by components' replacement or rearrangement. Int. J. Prod. Econ. 2008, 112:236-244.
    • (2008) Int. J. Prod. Econ. , vol.112 , pp. 236-244
    • Rachaniotis, N.P.1    Pappis, C.P.2
  • 19
    • 0024610468 scopus 로고    scopus 로고
    • Some replacement policies with minimal repairs and repair cost limit
    • Kapur P.K., Garg R.B., Butani N.L. Some replacement policies with minimal repairs and repair cost limit. Int. J. Syst. Sci. 1998, 20:267-279.
    • (1998) Int. J. Syst. Sci. , vol.20 , pp. 267-279
    • Kapur, P.K.1    Garg, R.B.2    Butani, N.L.3
  • 20
    • 0000455484 scopus 로고    scopus 로고
    • Graphical statistical approach to repair limit replacement problem
    • Koshimae H., Dohi T., Kaio N. Graphical statistical approach to repair limit replacement problem. J. Oper. Res. Soc. Jpn. 2000, 39:230-246.
    • (2000) J. Oper. Res. Soc. Jpn. , vol.39 , pp. 230-246
    • Koshimae, H.1    Dohi, T.2    Kaio, N.3
  • 21
    • 0023517997 scopus 로고
    • Cost limit replacement policy under imperfect repair
    • Yun W.Y., Bai D.S. Cost limit replacement policy under imperfect repair. Reliab. Eng. Syst. Safe. 1987, 19:23-28.
    • (1987) Reliab. Eng. Syst. Safe. , vol.19 , pp. 23-28
    • Yun, W.Y.1    Bai, D.S.2
  • 22
    • 33947276768 scopus 로고    scopus 로고
    • An integrated production and preventive maintenance planning model
    • Aghezzaf E.H., Jamali M.A., Ait-Kadi D. An integrated production and preventive maintenance planning model. Eur. J. Oper. Res. 2007, 181:679-685.
    • (2007) Eur. J. Oper. Res. , vol.181 , pp. 679-685
    • Aghezzaf, E.H.1    Jamali, M.A.2    Ait-Kadi, D.3
  • 23
    • 70349764553 scopus 로고    scopus 로고
    • Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
    • Low C., Ji M., Hsu C.J., Su C.T. Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Appl. Math. Model. 2010, 34:334-342.
    • (2010) Appl. Math. Model. , vol.34 , pp. 334-342
    • Low, C.1    Ji, M.2    Hsu, C.J.3    Su, C.T.4
  • 24
    • 75449112582 scopus 로고    scopus 로고
    • Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
    • Berrichi A., Yalaoui F., Amodeo L., Mezghiche M. Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Comput. Oper. Res. 2010, 37:1584-1596.
    • (2010) Comput. Oper. Res. , vol.37 , pp. 1584-1596
    • Berrichi, A.1    Yalaoui, F.2    Amodeo, L.3    Mezghiche, M.4
  • 25
    • 0031099506 scopus 로고    scopus 로고
    • A multi criteria approach to the selection of preventive maintenance intervals
    • Chareonsuk C., Nagarurand N., Tabucanon M.T. A multi criteria approach to the selection of preventive maintenance intervals. Int. J. Prod. Econ. 1997, 49:55-64.
    • (1997) Int. J. Prod. Econ. , vol.49 , pp. 55-64
    • Chareonsuk, C.1    Nagarurand, N.2    Tabucanon, M.T.3
  • 26
    • 0004774101 scopus 로고
    • Selection of an automated inspection system using multiattribute decision analysis
    • Pandey P.C., Kengpol A. Selection of an automated inspection system using multiattribute decision analysis. Int. J. Prod. Econ. 1995, 39:289-298.
    • (1995) Int. J. Prod. Econ. , vol.39 , pp. 289-298
    • Pandey, P.C.1    Kengpol, A.2
  • 27
    • 0036604021 scopus 로고    scopus 로고
    • Age replacement policy: a multi attribute value model
    • Jiang R., Ji P. Age replacement policy: a multi attribute value model. Reliab. Eng. Syst. Safe. 2002, 76:311-318.
    • (2002) Reliab. Eng. Syst. Safe. , vol.76 , pp. 311-318
    • Jiang, R.1    Ji, P.2
  • 28
    • 0343898023 scopus 로고    scopus 로고
    • Measuring maintenance performance in search for a maintenance productivity index
    • Lofsten H. Measuring maintenance performance in search for a maintenance productivity index. Int. J. Prod. Econ. 2000, 63:47-58.
    • (2000) Int. J. Prod. Econ. , vol.63 , pp. 47-58
    • Lofsten, H.1
  • 29
    • 0030649068 scopus 로고    scopus 로고
    • Determining the most important criteria in maintenance decision making
    • Triantaphyllou E., Kovalerchuk B., Mann L., Knapp G.M. Determining the most important criteria in maintenance decision making. J. Qual. Main. Eng. 1997, 3(1):16-28.
    • (1997) J. Qual. Main. Eng. , vol.3 , Issue.1 , pp. 16-28
    • Triantaphyllou, E.1    Kovalerchuk, B.2    Mann, L.3    Knapp, G.M.4
  • 30
    • 33750731956 scopus 로고    scopus 로고
    • Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms
    • Quan G., Greenwood G.W., Liu D., Hu S. Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms. Eur. J. Oper. Res. 2007, 177:1969-1984.
    • (2007) Eur. J. Oper. Res. , vol.177 , pp. 1969-1984
    • Quan, G.1    Greenwood, G.W.2    Liu, D.3    Hu, S.4
  • 31
    • 77955664820 scopus 로고    scopus 로고
    • Selecting optimum maintenance strategy by fuzzy interactive linear assignment method
    • Bashiri M., Badri H., Hejazi T.H. Selecting optimum maintenance strategy by fuzzy interactive linear assignment method. Appl. Math. Model. 2011, 35:152-164.
    • (2011) Appl. Math. Model. , vol.35 , pp. 152-164
    • Bashiri, M.1    Badri, H.2    Hejazi, T.H.3
  • 32
    • 25844491812 scopus 로고    scopus 로고
    • A model for preventive maintenance planning by genetic algorithms based on cost and reliability
    • Lapa C., Periera C., Barros M.P. A model for preventive maintenance planning by genetic algorithms based on cost and reliability. Reliab. Eng. Syst. Safe. 2006, 91:230-239.
    • (2006) Reliab. Eng. Syst. Safe. , vol.91 , pp. 230-239
    • Lapa, C.1    Periera, C.2    Barros, M.P.3
  • 33
    • 0030106093 scopus 로고    scopus 로고
    • Applications of maintenance optimization models: a review and analysis
    • Dekker R. Applications of maintenance optimization models: a review and analysis. Reliab. Eng. Syst. Safe. 1996, 51:229-240.
    • (1996) Reliab. Eng. Syst. Safe. , vol.51 , pp. 229-240
    • Dekker, R.1
  • 34
    • 35548987610 scopus 로고    scopus 로고
    • A general age-replacement model with minimal repair under renewing free-replacement warranty
    • Chien Y.H. A general age-replacement model with minimal repair under renewing free-replacement warranty. Eur. J. Oper. Res. 2008, 186:1046-1058.
    • (2008) Eur. J. Oper. Res. , vol.186 , pp. 1046-1058
    • Chien, Y.H.1
  • 35
    • 0002362385 scopus 로고
    • Optimum preventive maintenance policies
    • Barlow R.E., Hunter L.C. Optimum preventive maintenance policies. Oper. Res. 1960, 8:90-100.
    • (1960) Oper. Res. , vol.8 , pp. 90-100
    • Barlow, R.E.1    Hunter, L.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.