-
1
-
-
0037432505
-
Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
-
Al-Najjar B., Alsyouf I. Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. Int. J. Prod. Econ. 2003, 84:85-100.
-
(2003)
Int. J. Prod. Econ.
, vol.84
, pp. 85-100
-
-
Al-Najjar, B.1
Alsyouf, I.2
-
2
-
-
33847071199
-
Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
-
Wang L., Jian C., Jun W. Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process. Int. J. Prod. Econ. 2007, 107:151-163.
-
(2007)
Int. J. Prod. Econ.
, vol.107
, pp. 151-163
-
-
Wang, L.1
Jian, C.2
Jun, W.3
-
3
-
-
0038181371
-
Surveillance test policy optimization through genetic algorithms using non-periodic intervention frequencies and considering seasonal constraints
-
Lapa C., Periera C., Melo P. Surveillance test policy optimization through genetic algorithms using non-periodic intervention frequencies and considering seasonal constraints. Reliab. Eng. Syst. Safe. 2003, 81:103-115.
-
(2003)
Reliab. Eng. Syst. Safe.
, vol.81
, pp. 103-115
-
-
Lapa, C.1
Periera, C.2
Melo, P.3
-
4
-
-
0033899891
-
Maximization of a nuclear system availability through maintenance scheduling optimization using a genetic algorithm
-
Lapa C., Periera C., Mol A.C. Maximization of a nuclear system availability through maintenance scheduling optimization using a genetic algorithm. Nucl. Eng. Des. 2000, 196:219-231.
-
(2000)
Nucl. Eng. Des.
, vol.196
, pp. 219-231
-
-
Lapa, C.1
Periera, C.2
Mol, A.C.3
-
5
-
-
0030291291
-
Utilizing Weibull failure rates in repair limit analysis for equipment replacement/preventive maintenance decisions
-
Love C.E., Guo R. Utilizing Weibull failure rates in repair limit analysis for equipment replacement/preventive maintenance decisions. J. Oper. Res. Soc. 1996, 47:1366-1376.
-
(1996)
J. Oper. Res. Soc.
, vol.47
, pp. 1366-1376
-
-
Love, C.E.1
Guo, R.2
-
6
-
-
0001869844
-
Reliability based design of systems considering preventive maintenance and minimal repair
-
Monga A., Zou M.J., Toogood R. Reliability based design of systems considering preventive maintenance and minimal repair. Int. J. Reliab. Qual. Safe. Eng. 1997, 4:55-71.
-
(1997)
Int. J. Reliab. Qual. Safe. Eng.
, vol.4
, pp. 55-71
-
-
Monga, A.1
Zou, M.J.2
Toogood, R.3
-
7
-
-
0033079417
-
Availability and cost functions for periodically inspected preventively maintained units
-
Vaurio J.K. Availability and cost functions for periodically inspected preventively maintained units. Reliab. Eng. Syst. Safe. 1999, 63:133-140.
-
(1999)
Reliab. Eng. Syst. Safe.
, vol.63
, pp. 133-140
-
-
Vaurio, J.K.1
-
8
-
-
0141963917
-
New method to minimize the preventive maintenance cost of series-parallel systems
-
Bris R. New method to minimize the preventive maintenance cost of series-parallel systems. Reliab. Eng. Syst. Safe. 2004, 82:247-255.
-
(2004)
Reliab. Eng. Syst. Safe.
, vol.82
, pp. 247-255
-
-
Bris, R.1
-
9
-
-
15844382738
-
New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization
-
Samrout M., Yalaoui F., Chatelet E., Chebbo N. New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization. Reliab. Eng. Syst. Safe. 2005, 89:346-364.
-
(2005)
Reliab. Eng. Syst. Safe.
, vol.89
, pp. 346-364
-
-
Samrout, M.1
Yalaoui, F.2
Chatelet, E.3
Chebbo, N.4
-
10
-
-
1642603342
-
Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
-
Chelbi A., Kadi D.A. Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance. Eur. J. Oper. Res. 2004, 156:712-723.
-
(2004)
Eur. J. Oper. Res.
, vol.156
, pp. 712-723
-
-
Chelbi, A.1
Kadi, D.A.2
-
11
-
-
0033893452
-
A tabu search algorithm for maintenance scheduling of generating units
-
El-Amin I., Duffuaa S., Abbas M. A tabu search algorithm for maintenance scheduling of generating units. Electr. Power Syst. Res. 2000, 54:91-99.
-
(2000)
Electr. Power Syst. Res.
, vol.54
, pp. 91-99
-
-
El-Amin, I.1
Duffuaa, S.2
Abbas, M.3
-
12
-
-
55549089986
-
A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
-
Chien Y. A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times. Appl. Math. Model. 2009, 33:1708-1718.
-
(2009)
Appl. Math. Model.
, vol.33
, pp. 1708-1718
-
-
Chien, Y.1
-
13
-
-
52149111376
-
Methodology of using delay-time analysis for a manufacturing industry
-
Jones B., Jenkinson I., Wang J. Methodology of using delay-time analysis for a manufacturing industry. Reliab. Eng. Syst. Safe. 2009, 94:111-124.
-
(2009)
Reliab. Eng. Syst. Safe.
, vol.94
, pp. 111-124
-
-
Jones, B.1
Jenkinson, I.2
Wang, J.3
-
14
-
-
0026821919
-
Replacement policies of a shock model with imperfect preventive maintenance
-
Kijima M., Nakagawa M. Replacement policies of a shock model with imperfect preventive maintenance. Eur. J. Oper. Res. 1992, 57:100-110.
-
(1992)
Eur. J. Oper. Res.
, vol.57
, pp. 100-110
-
-
Kijima, M.1
Nakagawa, M.2
-
16
-
-
0000418998
-
Optimal replacement policy for minimal repair model
-
Tahara A., Nishida T. Optimal replacement policy for minimal repair model. J. Oper. Res. Soc. Jpn. 1975, 18:113-124.
-
(1975)
J. Oper. Res. Soc. Jpn.
, vol.18
, pp. 113-124
-
-
Tahara, A.1
Nishida, T.2
-
17
-
-
0035479768
-
Optimizing preventive maintenance for mechanical components using genetic algorithms
-
Tsai Y.T., Wang K.S., Teng H.Y. Optimizing preventive maintenance for mechanical components using genetic algorithms. Reliab. Eng. Syst. Safe. 2002, 74:85-98.
-
(2002)
Reliab. Eng. Syst. Safe.
, vol.74
, pp. 85-98
-
-
Tsai, Y.T.1
Wang, K.S.2
Teng, H.Y.3
-
18
-
-
38749086074
-
Preventive maintenance and upgrade system: optimizing the whole performance system by components' replacement or rearrangement
-
Rachaniotis N.P., Pappis C.P. Preventive maintenance and upgrade system: optimizing the whole performance system by components' replacement or rearrangement. Int. J. Prod. Econ. 2008, 112:236-244.
-
(2008)
Int. J. Prod. Econ.
, vol.112
, pp. 236-244
-
-
Rachaniotis, N.P.1
Pappis, C.P.2
-
19
-
-
0024610468
-
Some replacement policies with minimal repairs and repair cost limit
-
Kapur P.K., Garg R.B., Butani N.L. Some replacement policies with minimal repairs and repair cost limit. Int. J. Syst. Sci. 1998, 20:267-279.
-
(1998)
Int. J. Syst. Sci.
, vol.20
, pp. 267-279
-
-
Kapur, P.K.1
Garg, R.B.2
Butani, N.L.3
-
20
-
-
0000455484
-
Graphical statistical approach to repair limit replacement problem
-
Koshimae H., Dohi T., Kaio N. Graphical statistical approach to repair limit replacement problem. J. Oper. Res. Soc. Jpn. 2000, 39:230-246.
-
(2000)
J. Oper. Res. Soc. Jpn.
, vol.39
, pp. 230-246
-
-
Koshimae, H.1
Dohi, T.2
Kaio, N.3
-
21
-
-
0023517997
-
Cost limit replacement policy under imperfect repair
-
Yun W.Y., Bai D.S. Cost limit replacement policy under imperfect repair. Reliab. Eng. Syst. Safe. 1987, 19:23-28.
-
(1987)
Reliab. Eng. Syst. Safe.
, vol.19
, pp. 23-28
-
-
Yun, W.Y.1
Bai, D.S.2
-
22
-
-
33947276768
-
An integrated production and preventive maintenance planning model
-
Aghezzaf E.H., Jamali M.A., Ait-Kadi D. An integrated production and preventive maintenance planning model. Eur. J. Oper. Res. 2007, 181:679-685.
-
(2007)
Eur. J. Oper. Res.
, vol.181
, pp. 679-685
-
-
Aghezzaf, E.H.1
Jamali, M.A.2
Ait-Kadi, D.3
-
23
-
-
70349764553
-
Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
-
Low C., Ji M., Hsu C.J., Su C.T. Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Appl. Math. Model. 2010, 34:334-342.
-
(2010)
Appl. Math. Model.
, vol.34
, pp. 334-342
-
-
Low, C.1
Ji, M.2
Hsu, C.J.3
Su, C.T.4
-
24
-
-
75449112582
-
Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
-
Berrichi A., Yalaoui F., Amodeo L., Mezghiche M. Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Comput. Oper. Res. 2010, 37:1584-1596.
-
(2010)
Comput. Oper. Res.
, vol.37
, pp. 1584-1596
-
-
Berrichi, A.1
Yalaoui, F.2
Amodeo, L.3
Mezghiche, M.4
-
25
-
-
0031099506
-
A multi criteria approach to the selection of preventive maintenance intervals
-
Chareonsuk C., Nagarurand N., Tabucanon M.T. A multi criteria approach to the selection of preventive maintenance intervals. Int. J. Prod. Econ. 1997, 49:55-64.
-
(1997)
Int. J. Prod. Econ.
, vol.49
, pp. 55-64
-
-
Chareonsuk, C.1
Nagarurand, N.2
Tabucanon, M.T.3
-
26
-
-
0004774101
-
Selection of an automated inspection system using multiattribute decision analysis
-
Pandey P.C., Kengpol A. Selection of an automated inspection system using multiattribute decision analysis. Int. J. Prod. Econ. 1995, 39:289-298.
-
(1995)
Int. J. Prod. Econ.
, vol.39
, pp. 289-298
-
-
Pandey, P.C.1
Kengpol, A.2
-
27
-
-
0036604021
-
Age replacement policy: a multi attribute value model
-
Jiang R., Ji P. Age replacement policy: a multi attribute value model. Reliab. Eng. Syst. Safe. 2002, 76:311-318.
-
(2002)
Reliab. Eng. Syst. Safe.
, vol.76
, pp. 311-318
-
-
Jiang, R.1
Ji, P.2
-
28
-
-
0343898023
-
Measuring maintenance performance in search for a maintenance productivity index
-
Lofsten H. Measuring maintenance performance in search for a maintenance productivity index. Int. J. Prod. Econ. 2000, 63:47-58.
-
(2000)
Int. J. Prod. Econ.
, vol.63
, pp. 47-58
-
-
Lofsten, H.1
-
29
-
-
0030649068
-
Determining the most important criteria in maintenance decision making
-
Triantaphyllou E., Kovalerchuk B., Mann L., Knapp G.M. Determining the most important criteria in maintenance decision making. J. Qual. Main. Eng. 1997, 3(1):16-28.
-
(1997)
J. Qual. Main. Eng.
, vol.3
, Issue.1
, pp. 16-28
-
-
Triantaphyllou, E.1
Kovalerchuk, B.2
Mann, L.3
Knapp, G.M.4
-
30
-
-
33750731956
-
Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms
-
Quan G., Greenwood G.W., Liu D., Hu S. Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms. Eur. J. Oper. Res. 2007, 177:1969-1984.
-
(2007)
Eur. J. Oper. Res.
, vol.177
, pp. 1969-1984
-
-
Quan, G.1
Greenwood, G.W.2
Liu, D.3
Hu, S.4
-
31
-
-
77955664820
-
Selecting optimum maintenance strategy by fuzzy interactive linear assignment method
-
Bashiri M., Badri H., Hejazi T.H. Selecting optimum maintenance strategy by fuzzy interactive linear assignment method. Appl. Math. Model. 2011, 35:152-164.
-
(2011)
Appl. Math. Model.
, vol.35
, pp. 152-164
-
-
Bashiri, M.1
Badri, H.2
Hejazi, T.H.3
-
32
-
-
25844491812
-
A model for preventive maintenance planning by genetic algorithms based on cost and reliability
-
Lapa C., Periera C., Barros M.P. A model for preventive maintenance planning by genetic algorithms based on cost and reliability. Reliab. Eng. Syst. Safe. 2006, 91:230-239.
-
(2006)
Reliab. Eng. Syst. Safe.
, vol.91
, pp. 230-239
-
-
Lapa, C.1
Periera, C.2
Barros, M.P.3
-
33
-
-
0030106093
-
Applications of maintenance optimization models: a review and analysis
-
Dekker R. Applications of maintenance optimization models: a review and analysis. Reliab. Eng. Syst. Safe. 1996, 51:229-240.
-
(1996)
Reliab. Eng. Syst. Safe.
, vol.51
, pp. 229-240
-
-
Dekker, R.1
-
34
-
-
35548987610
-
A general age-replacement model with minimal repair under renewing free-replacement warranty
-
Chien Y.H. A general age-replacement model with minimal repair under renewing free-replacement warranty. Eur. J. Oper. Res. 2008, 186:1046-1058.
-
(2008)
Eur. J. Oper. Res.
, vol.186
, pp. 1046-1058
-
-
Chien, Y.H.1
-
35
-
-
0002362385
-
Optimum preventive maintenance policies
-
Barlow R.E., Hunter L.C. Optimum preventive maintenance policies. Oper. Res. 1960, 8:90-100.
-
(1960)
Oper. Res.
, vol.8
, pp. 90-100
-
-
Barlow, R.E.1
Hunter, L.C.2
|