-
1
-
-
0038279262
-
-
4th Ed., Pearson, Boston / Prentice-Hall, Englewood Cliffs, NJ
-
Ashworth, A. (2004). Cost studies of buildings, 4th Ed., Pearson, Boston / Prentice-Hall, Englewood Cliffs, NJ.
-
(2004)
Cost Studies of Buildings
-
-
Ashworth, A.1
-
6
-
-
34247584562
-
Determining optimal building height
-
DOI 10.1080/00420980601131902, PII 777409376, Supertall Living
-
Chau, K. -W., Wong, S. K., Yau, Y., and Yeung, A. K. C. (2007). " Determining optimal building height.." Urban Stud. ZZZZZZ 0042-0980, 44 (3), 591-607. 10.1080/00420980601131902 (Pubitemid 46680815)
-
(2007)
Urban Studies
, vol.44
, Issue.3
, pp. 591-608
-
-
Chau, K.-W.1
Wong, S.K.2
Yau, Y.3
Yeung, A.K.C.4
-
9
-
-
77958139335
-
-
CTBUH.. "." CTBUH projection, 2nd Ed., 〈〉 (Apr. 30, 2009)
-
CTBUH. (2009). " The tallest 20 in 2020.." CTBUH projection, 2nd Ed., 〈 http://www.ctbuh.org/HighRiseInfo/TallestDatabase/ Tallest20in2020/tabid/791/language/en-US/Default.aspx 〉 (Apr. 30, 2009).
-
(2009)
The Tallest 20 in 2020
-
-
-
10
-
-
77958119725
-
High rise ability
-
", C. A. Brebbia, eds., WIT Press, Southampton, U.K
-
de Jong, P., van Oss, S. C. F., and Wamelink, J. W. F. (2007). " High rise ability.." Earthquake resistant engineering structures VI, C. A. Brebbia, eds., WIT Press, Southampton, U.K.
-
(2007)
Earthquake Resistant Engineering Structures VI
-
-
De Jong, P.1
Van Oss, S.C.F.2
Wamelink, J.W.F.3
-
11
-
-
77958119534
-
-
Emporis Corporation.. "." 〈〉 (Apr. 10, 2008)
-
Emporis Corporation. (2008). " Skyline ranking.." 〈 http://www.emporis.com/en/bu/sk/st/sr/ 〉 (Apr. 10, 2008).
-
(2008)
Skyline Ranking
-
-
-
12
-
-
0004313023
-
-
Blackwell Science, Malden, MA
-
Ferry, D. J., Ferry, J. D., and Brandon, P. S. (1999). Cost planning of buildings, Blackwell Science, Malden, MA.
-
(1999)
Cost Planning of Buildings
-
-
Ferry, D.J.1
Ferry, J.D.2
Brandon, P.S.3
-
13
-
-
0037603952
-
The relationship between construction price and height
-
Flanagan, R., and Norman, G. (1978). " The relationship between construction price and height.." Chartered Surveyor Building and Quantity Surveying Quarterly, 5 (4), 68-71.
-
(1978)
Chartered Surveyor Building and Quantity Surveying Quarterly
, vol.5
, Issue.4
, pp. 68-71
-
-
Flanagan, R.1
Norman, G.2
-
14
-
-
0032077525
-
Urban soil characteristics and limitations for landscape planting in Hong Kong
-
DOI 10.1016/S0169-2046(97)00117-5, PII S0169204697001175
-
Jim, C. Y. (1998). " Urban soil characteristics and limitations for landscape planting in Hong Kong.." Landsc. Urban Plann. LUPLEZ 0169-2046, 40, 235-249. 10.1016/S0169-2046(97)00117-5 (Pubitemid 28324626)
-
(1998)
Landscape and Urban Planning
, vol.40
, Issue.4
, pp. 235-249
-
-
Jim, C.Y.1
-
18
-
-
0020269926
-
Cost modeling: A tentative specification
-
P. S. Brandon, ed., E & FN Spon, London
-
Newton, S. (1982). " Cost modeling: A tentative specification.. " Building cost techniques: New directions, P. S. Brandon, ed., E & FN Spon, London.
-
(1982)
Building Cost Techniques: New Directions
-
-
Newton, S.1
-
20
-
-
0037968270
-
Height and construction costs of buildings in Hong Kong
-
DOI 10.1080/0144619032000079671
-
Picken, D. H., and Ilozor, B. D. (2003). " Height and construction costs of buildings in Hong Kong.." Constr. Manage. Econom. CMECF3 0144-6193, 21 (2), 107-111. 10.1080/0144619032000079671 (Pubitemid 36531113)
-
(2003)
Construction Management and Economics
, vol.21
, Issue.2
, pp. 107-111
-
-
Picken, D.H.1
Ilozor, B.D.2
-
21
-
-
0033150103
-
The management of labour on high rise construction projects: An international investigation
-
" IPMAEL 0263-7863, (),. 10.1016/S0263-7863(98)00025-8
-
Proverbs, D. G., Holt, G. D., and Olomolaiye, P. O. (1999). " The management of labour on high rise construction projects: An international investigation.." Int. J. Proj. Manage. IPMAEL 0263-7863, 17 (3), 195-204. 10.1016/S0263-7863(98)00025-8
-
(1999)
Int. J. Proj. Manage.
, vol.17
, Issue.3
, pp. 195-204
-
-
Proverbs, D.G.1
Holt, G.D.2
Olomolaiye, P.O.3
-
22
-
-
0030181788
-
An evaluation of transportation systems for high rise concrete construction
-
DOI 10.1016/0360-1323(96)00002-9, PII S0360132396000029
-
Proverbs, D. G., Olomolaiye, P. O., and Harris, F. C. (1996). " An evaluation of transportation systems for high rise concrete construction.." Build. Environ. BUSCBC 0360-1323, 31 (4), 363-374. 10.1016/0360-1323(96)00002-9 (Pubitemid 126382033)
-
(1996)
Building and Environment
, vol.31
, Issue.4
, pp. 363-374
-
-
Proverbs, D.G.1
Olomolaiye, P.O.2
Harris, F.C.3
-
23
-
-
77958133665
-
-
Rawlinsons.., Rawlhouse Publications, Perth, Western Australia
-
Rawlinsons. (2007). Rawlinsons Australian construction handbook, Rawlhouse Publications, Perth, Western Australia.
-
(2007)
Rawlinsons Australian Construction Handbook
-
-
-
24
-
-
77958136184
-
-
RICE.. "." 〈〉 (Jan. 11, 2008)
-
RICE. (2008). " Rice University: Polynomial regression.." 〈 http://www.ruf.rice.edu/~branton/interaction/faqpoly.htm 〉 (Jan. 11, 2008).
-
(2008)
Rice University: Polynomial Regression
-
-
-
26
-
-
77958130432
-
-
Shanghai Construction Engineer Cost Information (SHCECI).. "." 〈〉 (Feb. 24, 2007)
-
Shanghai Construction Engineer Cost Information (SHCECI). (2007). " Shanghai construction engineer cost information: Cost price index.." 〈 http://203.95.6.186/newver 〉 (Feb. 24, 2007).
-
(2007)
Shanghai Construction Engineer Cost Information: Cost Price Index
-
-
-
27
-
-
0003912406
-
-
J. F. Poland, ed., United Nations Educational, Scientific and Cultural Organization, Paris, 〈〉 (Mar. 14, 2010)
-
Shi, L., and Bao, M. (1984). Guidebook to studies of land subsidence due to ground-water withdrawal, J. F. Poland, ed., United Nations Educational, Scientific and Cultural Organization, Paris, 〈 http://wwwrcamnl.wr.usgs. gov/rgws/Unesco/PDF-Chapters/Chapter9-2.pdf 〉 (Mar. 14, 2010).
-
(1984)
Guidebook to Studies of Land Subsidence Due to Ground-water Withdrawal
-
-
Shi, L.1
Bao, M.2
-
28
-
-
34247171994
-
-
2nd Ed., Elsevier, New York / Butterworth-Heinemann, Oxford
-
Smith, J., and Jaggar, D. (2007). Building cost planning for the design team, 2nd Ed., Elsevier, New York / Butterworth-Heinemann, Oxford.
-
(2007)
Building Cost Planning for the Design Team
-
-
Smith, J.1
Jaggar, D.2
-
31
-
-
0037647504
-
GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
-
DOI 10.1080/0144619032000049665
-
Tam, C. M., and Tong, T. K. L. (2003). " GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction.." Constr. Manage. Econom. CMECF3 0144-6193, 21 (3), 257-266. 10.1080/0144619032000049665 (Pubitemid 36650330)
-
(2003)
Construction Management and Economics
, vol.21
, Issue.3
, pp. 257-266
-
-
Tam, C.M.1
Tong, T.K.L.2
-
34
-
-
13944261591
-
Analysis of costs and benefits of tall buildings
-
DOI 10.1061/(ASCE)0733-9364(2003)129:4(421)
-
Warszawski, A. (2003). " Analysis of costs and benefits of tall buildings.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 421-430. 10.1061/(ASCE)0733-9364(2003)129:4(421) (Pubitemid 40265456)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 421-430
-
-
Warszawski, A.1
-
35
-
-
77958137884
-
-
International Council for building research studies and documentation, building economics and construction management: The building market-building economics and urban development, Sydney, Australia, Vol.
-
Xu, S. (1990). " The construction market in Shanghai people's republic of China.." International Council for building research studies and documentation, building economics and construction management: The building market-building economics and urban development, Sydney, Australia, Vol. 1, 329-334.
-
(1990)
The Construction Market in Shanghai People's Republic of China
, vol.1
, pp. 329-334
-
-
Xu, S.1
|