메뉴 건너뛰기




Volumn 1, Issue , 2008, Pages 129-142

Risk based fuzzy modeling of Cost Estimating Relationships for floating structures

Author keywords

[No Author keywords available]

Indexed keywords

CONCEPT DEVELOPMENT; CONFIDENCE LEVELS; COST ESTIMATE; COST ESTIMATING RELATIONSHIPS; FLOATING OFFSHORE STRUCTURE; FLOATING PRODUCTION; FLOATING STRUCTURES; FUZZY MODELING; OFFSHORE DEVELOPMENT; RISK RANKING; RISK-BASED;

EID: 77957992923     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/OMAE2008-57116     Document Type: Conference Paper
Times cited : (4)

References (8)
  • 4
    • 0345603476 scopus 로고    scopus 로고
    • US industrial capacity and risk - based simulation for the construction of the mobile offshore base
    • A paper presented at the, June 2001, Rio de Janeiro
    • Ayyub, B.M., Bender, W.J., and Blair, A.N., 2001, "US Industrial Capacity and Risk - Based Simulation for the Construction of the Mobile Offshore Base" A paper presented at the 20th International Conference on Offshore Mechanics and Arctic Engineering, June 2001, Rio de Janeiro.
    • (2001) 20th International Conference on Offshore Mechanics and Arctic Engineering
    • Ayyub, B.M.1    Bender, W.J.2    Blair, A.N.3
  • 5
    • 33751317815 scopus 로고
    • Statistical techniques in cost estimation
    • John Wiley & Sons, Chap 3
    • Wyskida, R.M., 1995, "Statistical Techniques in Cost Estimation, " Cost Estimator's Reference Manual, John Wiley & Sons, Chap 3, pp 111.
    • (1995) Cost Estimator's Reference Manual , pp. 111
    • Wyskida, R.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.