-
1
-
-
0030082092
-
Power distribution system planning with reliability modelling and optimisation
-
Tang, Y.: 'Power distribution system planning with reliability modelling and optimisation', IEEE Trans. Power Syst., 1996, 11, (1), pp. 181-187
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, Issue.1
, pp. 181-187
-
-
Tang, Y.1
-
2
-
-
0023670425
-
Distribution system planning through a quadratic mixed integer programming approach
-
Ponnavaikko, M., Prakasa Rao, K.S, and Venkata, S.S.: 'Distribution system planning through a quadratic mixed integer programming approach', IEEE Trans. Power Deliv., 1987, 2, (4), pp. 1157-1163
-
(1987)
IEEE Trans. Power Deliv.
, vol.2
, Issue.4
, pp. 1157-1163
-
-
Ponnavaikko, M.1
Prakasa Rao, K.S.2
Venkata, S.S.3
-
3
-
-
0019569267
-
A branch and bound model for choosing optimal substation locations
-
Thompson, G.L., and Wall, D.L. 'A branch and bound model for choosing optimal substation locations', IEEE Trans. Power Appar. Syst., 1981, 100, (5), pp. 2683-2688
-
(1981)
IEEE Trans. Power Appar. Syst.
, vol.100
, Issue.5
, pp. 2683-2688
-
-
Thompson, G.L.1
Wall, D.L.2
-
4
-
-
0019541516
-
Distribution-system planning using mixed-integer programming
-
Gonen, T., and Foote, B.L., 'Distribution-system planning using mixed-integer programming', IEE Proc., Gener., Transm. Distrib., 128, (2), pp. 70-79
-
(1981)
IEE Proc., Gener., Transm. Distrib.
, vol.128
, Issue.2
, pp. 70-79
-
-
Gonen, T.1
Foote, B.L.2
-
5
-
-
0027242539
-
Two-stage power system distribution planning algorithm
-
Quintana, V.H., Temraz, H.K., and Hipel, K.W.: 'Two-stage power system distribution planning algorithm', IEE Proc., Gener., Transm. Distrib., 1993, 140, (1), pp. 17-29
-
(1993)
IEE Proc., Gener., Transm. Distrib.
, vol.140
, Issue.1
, pp. 17-29
-
-
Quintana, V.H.1
Temraz, H.K.2
Hipel, K.W.3
-
6
-
-
0142036336
-
Automation and integration of the power system planning process
-
Mukerji, R., Godart, T.F., Simons, N.W., Powell, D., Hajagos, J., and Madsen, A.: 'Automation and integration of the power system planning process'. Proc. 35th Int. Conf. on Large high voltage electric systems. (CIGRE), Paris, France, 28 August-3 September 1994, Vol. 2, pp. 38-202/1-6
-
Proc. 35th Int. Conf. on Large High Voltage Electric Systems. (CIGRE), Paris, France, 28 August-3 September 1994
, vol.2
, pp. 38-202/1
-
-
Mukerji, R.1
Godart, T.F.2
Simons, N.W.3
Powell, D.4
Hajagos, J.5
Madsen, A.6
-
7
-
-
0032070097
-
Why risk analysis outperforms probabilistic choice as the effective decision support paradigm for power system planning
-
Miranda, V., and Proenca, L.M.: 'Why risk analysis outperforms probabilistic choice as the effective decision support paradigm for power system planning', IEEE Trans. Power Syst., 1998, 13, (2), pp. 643-648
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, Issue.2
, pp. 643-648
-
-
Miranda, V.1
Proenca, L.M.2
-
8
-
-
0142099984
-
Multi-criteria analysis application in distribution network planning
-
Neimane, V., Andersson, G., and Krishans, Z.: 'Multi-criteria analysis application in distribution network planning'. Proc. 33rd Universities Power engineering conf., (UPEC), Edinburgh, UK, September 1997, pp. 791-794
-
Proc. 33rd Universities Power Engineering Conf., (UPEC), Edinburgh, UK, September 1997
, pp. 791-794
-
-
Neimane, V.1
Andersson, G.2
Krishans, Z.3
-
9
-
-
0032140598
-
The application of multi-criteria analysis to substation design
-
Atanackovic, D., Mcgillis, D.T., Galiana, F.D., 'The application of multi-criteria analysis to substation design', IEEE Trans. Power Syst., 1998, 13, (3), pp. 1172-1178
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, Issue.3
, pp. 1172-1178
-
-
Atanackovic, D.1
Mcgillis, D.T.2
Galiana, F.D.3
-
10
-
-
2542470914
-
Multiple criteria decision making in distribution utility investment planning
-
Espie, P., Ault, G.W., and McDonald, J.R.: 'Multiple criteria decision making in distribution utility investment planning'. Proc. Int. Conf. on Electric utility deregulation and restructuring and power technologies 2000, (DRPT), London, UK, April 2000, pp. 576-581
-
Proc. Int. Conf. on Electric Utility Deregulation and Restructuring and Power Technologies 2000, (DRPT), London, UK, April 2000
, pp. 576-581
-
-
Espie, P.1
Ault, G.W.2
McDonald, J.R.3
-
11
-
-
85008061049
-
Planning for distributed generation within distribution networks in restructured electricity markets
-
Ault, G. W., and McDonald, J.R.: 'Planning for distributed generation within distribution networks in restructured electricity markets', IEEE Power Eng. Rev., 2000, 20, (2), pp. 52-54
-
(2000)
IEEE Power Eng. Rev.
, vol.20
, Issue.2
, pp. 52-54
-
-
Ault, G.W.1
McDonald, J.R.2
-
12
-
-
46149143659
-
Optimal allocation of distribution investment
-
Gauld, R. A. 'Optimal allocation of distribution investment', Proc. 12th Int. Conf. on Electricity distribution, London, UK, May 1993, 6/3/1-5
-
Proc. 12th Int. Conf. on Electricity Distribution, London, UK, May 1993
-
-
Gauld, R.A.1
-
13
-
-
0142131632
-
Engineering recommendation P.2/5-security of supply
-
Electricity Association: Engineering and safety division; (Engineering Publications)
-
Electricity Association: Engineering and safety division: 'Engineering recommendation P.2/5-security of supply' (Engineering Publications, 1978)
-
(1978)
-
-
-
14
-
-
0003899705
-
Electricity distribution network design
-
(Peter Peregrinus Ltd., UK)
-
Lakervi, E., and Holmes, E.J.: 'Electricity distribution network design' (Peter Peregrinus Ltd., UK, 1995)
-
(1995)
-
-
Lakervi, E.1
Holmes, E.J.2
-
15
-
-
4243280414
-
Definitions of input and output measures
-
Office of Gas an Electricity Markets: Information and Incentives Project; October
-
Office of Gas an Electricity Markets: Information and Incentives Project: 'Definitions of input and output measures', October 2000
-
(2000)
-
-
-
16
-
-
0004037526
-
Making multiple objective decisions
-
(IEEE Computer Society Press, Los Alamito 1st Edn.)
-
Molloghasemi, M., and Pet-Edwards, J.: 'Making multiple objective decisions', (IEEE Computer Society Press, Los Alamito, 1997 1st Edn.)
-
(1997)
-
-
Molloghasemi, M.1
Pet-Edwards, J.2
-
17
-
-
0004268643
-
Decision synthesis
-
(Cambridge University Press, UK)
-
Watson, S.R., and Buede, D.M.: 'Decision synthesis' (Cambridge University Press, UK, 1987)
-
(1987)
-
-
Watson, S.R.1
Buede, D.M.2
-
18
-
-
0036604021
-
Age replacement policy: A multi-attribute value model
-
Jiang, R., and Ji, P.: 'Age replacement policy: a multi-attribute value model', Reliab. Eng. Syst. Saf., 2002, 76, pp. 311-318
-
(2002)
Reliab. Eng. Syst. Saf.
, vol.76
, pp. 311-318
-
-
Jiang, R.1
Ji, P.2
-
19
-
-
0142068346
-
NGC seven year statement for the years 1997/98 to 2003/04
-
National Grid Company plc; April 1997
-
National Grid Company plc: 'NGC Seven Year Statement for the years 1997/98 to 2003/04'. April 1997
-
(1997)
-
-
-
20
-
-
0001082911
-
Methods for planning under uncertainty-towards flexibility in power system development
-
Van Geert, E. CIGRE Working Group 37.10 (1995).: 'Methods for planning under uncertainty-towards flexibility in power system development', Electra (CIGRE), 1995, 161, pp. 143-163
-
(1995)
Electra (CIGRE)
, vol.161
, pp. 143-163
-
-
Van Geert, E.1
|