-
3
-
-
33847216878
-
Prediction of water pipe asset life using neural networks
-
Achim, D., Ghotb, F. & McManus, K. J. 2007 Prediction of water pipe asset life using neural networks. J. Infrastructure Syst. 13(1), 26-30.
-
(2007)
J. Infrastructure Syst
, vol.13
, Issue.1
, pp. 26-30
-
-
Achim, D.1
Ghotb, F.2
McManus, K.J.3
-
4
-
-
0031451003
-
Probabilistic analysis of underground pipelines subject to combined stress and corrosion
-
Ahammed, M. & Melchers, R. E. 1997 Probabilistic analysis of underground pipelines subject to combined stress and corrosion. Eng. Struct. 19(12), 988-994.
-
(1997)
Eng. Struct
, vol.19
, Issue.12
, pp. 988-994
-
-
Ahammed, M.1
Melchers, R.E.2
-
5
-
-
0035576640
-
Assessment of infrastructure inspection needs using logistic models
-
Ariaratnam, T. S., Assaly, E. A. & Yuqing, Y. 2001 Assessment of infrastructure inspection needs using logistic models. J. Infrastructure Syst. ASCE 7(4), 160-165.
-
(2001)
J. Infrastructure Syst. ASCE
, vol.7
, Issue.4
, pp. 160-165
-
-
Ariaratnam, T.S.1
Assaly, E.A.2
Yuqing, Y.3
-
6
-
-
31144448600
-
Estimating transition probabilities in Markov chain-based deterioration models for management of wastewater systems
-
Baik, H. S., Jeong, H. S. & Abraham, D. M. 2006 Estimating transition probabilities in Markov Chain-based deterioration models for management of wastewater systems. J. Water Resour. Plan. ASCE 132(1), 15-24.
-
(2006)
J. Water Resour. Plan. ASCE
, vol.132
, Issue.1
, pp. 15-24
-
-
Baik, H.S.1
Jeong, H.S.2
Abraham, D.M.3
-
7
-
-
0036386445
-
Selective inspection planning with ageing forecast for sewer types
-
Baur, R. & Herz, R. 2002 Selective inspection planning with ageing forecast for sewer types. Water Sci. Technol. 46(4-7), 389-396.
-
(2002)
Water Sci. Technol
, vol.46
, Issue.4-7
, pp. 389-396
-
-
Baur, R.1
Herz, R.2
-
8
-
-
77952766260
-
Risk based economic life cycle management of infrastructure assets and its regulatory implications
-
Wollongong, Australia, May 2000
-
Buckland, P. 2000 Risk based economic life cycle management of infrastructure assets and its regulatory implications. In Proceedings of the International Conference of Maintenance Societies, Wollongong, Australia, May 2000.
-
(2000)
Proceedings of the International Conference of Maintenance Societies
-
-
Buckland, P.1
-
9
-
-
0037238399
-
Asset planning for water reticulation systems: The PARMS model
-
Burn, L. S., Tucker, S. N., Rahilly, M., Davis, P., Jarret, R. & Po, M. 2003 Asset planning for water reticulation systems: the PARMS model. Water Sci. Technol. Water Supply 3(1-2), 55-62.
-
(2003)
Water Sci. Technol. Water Supply
, vol.3
, Issue.1-2
, pp. 55-62
-
-
Burn, L.S.1
Tucker, S.N.2
Rahilly, M.3
Davis, P.4
Jarret, R.5
Po, M.6
-
10
-
-
77956892733
-
PARMS: An approach to strategic management for urban water infrastructure
-
San Francisco, 26-27 July 2004
-
Burn, S., Ambrose, M. D., Moglia, M. & Tjandraatmadja, G. F. 2004 PARMS: An approach to strategic management for urban water infrastructure. IWA Leading-Edge Conference on Strategic Asset Management, San Francisco, 26-27 July 2004, pp. 155-164.
-
(2004)
IWA Leading-Edge Conference on Strategic Asset Management
, pp. 155-164
-
-
Burn, S.1
Ambrose, M.D.2
Moglia, M.3
Tjandraatmadja, G.F.4
-
11
-
-
77956892444
-
-
AwwaRF, Denver, Colorado
-
Burn, S., Davis, P., Schiller, T. L., Tiganis, B. E., Tjandraatmadja, G. F., Cardy, M., Gould, S. & Sadler, P. A. 2005 Long Term Performance Prediction for PVC Pipes. AwwaRF, Denver, Colorado.
-
(2005)
Long Term Performance Prediction for PVC Pipes
-
-
Burn, S.1
Davis, P.2
Schiller, T.L.3
Tiganis, B.E.4
Tjandraatmadja, G.F.5
Cardy, M.6
Gould, S.7
Sadler, P.A.8
-
12
-
-
69249126158
-
Asset management for water infrastructure
-
Burn, S., Marlow, D., Moglia, M. & Buckland, P. 2007 Asset management for water infrastructure. Water Asset Manage. Int. 3(2), 12-18.
-
(2007)
Water Asset Manage. Int.
, vol.3
, Issue.2
, pp. 12-18
-
-
Burn, S.1
Marlow, D.2
Moglia, M.3
Buckland, P.4
-
13
-
-
77956902423
-
Risk analysis for pipeline assets: The use of models for failure prediction in plastics pipelines
-
Martin, J. W., Ryntze, R. A., Chan, J. & Dickie,Dickie, R. A. (eds), Springer, New York
-
Burn, S., Davis, P. & Gould, S. 2008 Risk analysis for pipeline assets: the use of models for failure prediction in plastics pipelines. In: Martin, J. W., Ryntze, R. A., Chan, J. & Dickie,Dickie, R. A. (eds) Service Life Prediction of Polymeric Materials: Global Perspectives. Springer, New York
-
(2008)
Service Life Prediction of Polymeric Materials: Global Perspectives
-
-
Burn, S.1
Davis, P.2
Gould, S.3
-
14
-
-
77956921137
-
-
Miami, 11-14 November 2009
-
Burn, S., Williams, W., Puranik, S. & Marlow, D. 2009 The role of condition assessment and its application in asset management in North America: The Hillsborough County case study, LESAM 2009, Miami, 11-14 November 2009.
-
(2009)
The Role of Condition Assessment and its Application in Asset Management in North America: The Hillsborough County case study, LESAM 2009
-
-
Burn, S.1
Williams, W.2
Puranik, S.3
Marlow, D.4
-
15
-
-
0020335791
-
Water distribution systems: A spatial and cost evaluation
-
Clark, R. M., Stafford, C. L. & Goodrich, J. A. 1982 Water distribution systems: a spatial and cost evaluation. J. Water Resour. Plan. ASCE 108(3), 243-256.
-
(1982)
J. Water Resour. Plan. ASCE
, vol.108
, Issue.3
, pp. 243-256
-
-
Clark, R.M.1
Stafford, C.L.2
Goodrich, J.A.3
-
16
-
-
0003392619
-
-
Osaki, S. & Murthy, D. N. P. (eds). TechnologyManagement Centre, The University of Queensland, Australia
-
Constantine, A. G. & Darroch, J. 1993 Pipeline Reliability, Stochastic Models in Engineering Technology & Management. Osaki, S. & Murthy, D. N. P. (eds). TechnologyManagement Centre, The University of Queensland, Australia, pp. 86-95.
-
(1993)
Pipeline Reliability, Stochastic Models in Engineering Technology & Management
, pp. 86-95
-
-
Constantine, A.G.1
Darroch, J.2
-
17
-
-
0003740564
-
-
Chapman & Hall/CRC, Boca Raton, Florida
-
Crowder, M. J., Kimber, A. C., Smith, A. C. & Sweeting, A. J. 1991 Statistical Analysis of Reliability Data. Chapman & Hall/CRC, Boca Raton, Florida.
-
(1991)
Statistical Analysis of Reliability Data
-
-
Crowder, M.J.1
Kimber, A.C.2
Smith, A.C.3
Sweeting, A.J.4
-
19
-
-
0034929301
-
Factors influencing the structural deterioration and collapse of rigid sewer pipes
-
Davies, J. P., Clarke, B. A., Whiter, J. T. & Cunningham, R. J. 2001 Factors influencing the structural deterioration and collapse of rigid sewer pipes. Urban Water 3(1-2), 73-89.
-
(2001)
Urban Water
, vol.3
, Issue.1-2
, pp. 73-89
-
-
Davies, J.P.1
Clarke, B.A.2
Whiter, J.T.3
Cunningham, R.J.4
-
20
-
-
33847412451
-
A physical probabilistic model to predict failure rates in buried PVC pipelines
-
Davis, P., Burn, S., Moglia, M. & Gould, S. 2007a A physical probabilistic model to predict failure rates in buried PVC pipelines. Reliab. Eng. Syst. Saf. 92, 1258-1266.
-
(2007)
Reliab. Eng. Syst. Saf
, vol.92
, pp. 1258-1266
-
-
Davis, P.1
Burn, S.2
Moglia, M.3
Gould, S.4
-
21
-
-
77956944137
-
-
AwwaRF, Denver, Colorado
-
Davis, P., Burn, S., Gould, S., Cardy, M., Tjandraatmadja, G. & Sadler, P. 2007b Long Term Performance Prediction for PE Pipes. AwwaRF, Denver, Colorado.
-
(2007)
Long Term Performance Prediction for PE Pipes
-
-
Davis, P.1
Burn, S.2
Gould, S.3
Cardy, M.4
Tjandraatmadja, G.5
Sadler, P.6
-
22
-
-
49249103010
-
Asset management: Quantifying economic lifetime for large diameter pipelines
-
Davis, P. & Marlow, D. 2008 Asset management: quantifying economic lifetime for large diameter pipelines. J. Am. Water Works Assoc. 100(7), 110-119.
-
(2008)
J. Am. Water Works Assoc
, vol.100
, Issue.7
, pp. 110-119
-
-
Davis, P.1
Marlow, D.2
-
23
-
-
45349101724
-
Failure prediction and optimal scheduling of replacements in asbestos cement water pipelines
-
Davis, P., DeSilva, D., Marlow, D., Moglia, M., Gould, S. & Burn, S. 2008 Failure prediction and optimal scheduling of replacements in asbestos cement water pipelines. J. Water Supply Res. Technol.-AQUA 57(4), 239-252.
-
(2008)
J. Water Supply Res. Technol.-AQUA
, vol.57
, Issue.4
, pp. 239-252
-
-
Davis, P.1
DeSilva, D.2
Marlow, D.3
Moglia, M.4
Gould, S.5
Burn, S.6
-
24
-
-
84905713651
-
-
Deb, A. K., Snyder, J. K., Logananthan, G. V., Agbenowski, N. & Grablutz, F. 2003 AwwaRf report 'Prioritizing Water Main Renewal Program' Pipelines 2003, 50.
-
(2003)
AwwaRf report 'Prioritizing Water Main Renewal Program' Pipeline
, vol.2003
, pp. 50
-
-
Deb, A.K.1
Snyder, J.K.2
Logananthan, G.V.3
Agbenowski, N.4
Grablutz, F.5
-
25
-
-
67649240276
-
Loganathan's legacy on water distribution system asset management
-
July/August 2009
-
Deb, A., Snyder, J. K., Hammell, J. & Grablutz, F. 2009 Loganathan's legacy on water distribution system asset management. J. Water Resour. Plan. ASCE, 216-226. (July/August 2009).
-
(2009)
J. Water Resour. Plan. ASCE
, pp. 216-226
-
-
Deb, A.1
Snyder, J.K.2
Hammell, J.3
Grablutz, F.4
-
26
-
-
0037402085
-
Risk assessment for civil engineering facilities: Critical overview and discussion
-
Faber, M. H. & Stewart, M. G. 2003 Risk assessment for civil engineering facilities: critical overview and discussion. Reliab. Eng. Syst. Saf. 80, 173-184.
-
(2003)
Reliab. Eng. Syst. Saf
, vol.80
, pp. 173-184
-
-
Faber, M.H.1
Stewart, M.G.2
-
27
-
-
0030478643
-
Aging processes and rehabilitation needs of drinking water distribution networks
-
Herz, R. K. 1996 Aging processes and rehabilitation needs of drinking water distribution networks. J. Water Supply: Res. Technol.-AQUA 45, 221-231.
-
(1996)
J. Water Supply: Res. Technol.-AQUA
, vol.45
, pp. 221-231
-
-
Herz, R.K.1
-
28
-
-
84877131270
-
Sewer status assessment by rehabilitation priority, intrinsic value and functionality as basis for forecast supported inspections and predictive rehabilitation planning.6
-
Hamburg
-
Hochstrate, K. 2000 Sewer status assessment by rehabilitation priority, intrinsic value and functionality as basis for forecast supported inspections and predictive rehabilitation planning. 6. Internationaler Kongress Leitungsbau, Hamburg, pp. 548-557.
-
(2000)
Internationaler Kongress Leitungsbau
, pp. 548-557
-
-
Hochstrate, K.1
-
30
-
-
0345620862
-
A structured approach to asset management within the electricity industry
-
Hoskins, R. P., Brint, A. T. & Strbac, G. 1998 A structured approach to asset management within the electricity industry. Utilities Policy 7, 221-232.
-
(1998)
Utilities Policy
, vol.7
, pp. 221-232
-
-
Hoskins, R.P.1
Brint, A.T.2
Strbac, G.3
-
32
-
-
77956912007
-
-
Melbourne, Australia
-
Jarrett, R., Hussain, O., Veevers, A. & Van der Touw, J. 2001 Proceedings of the International Conference of Maintenance Societies, Melbourne, Australia.
-
(2001)
Proceedings of the International Conference of Maintenance Societies
-
-
Jarrett, R.1
Hussain, O.2
Veevers, A.3
Van Der Touw, J.4
-
35
-
-
41749121936
-
Identifying pipes and valves of high importance for efficient operation and maintenance of water distribution systems
-
Jun, H., Loganathan, G. V., Kim, J. H. & Park, S. 2008 Identifying pipes and valves of high importance for efficient operation and maintenance of water distribution systems. Water Resour. Manage. 22(6), 719-736.
-
(2008)
Water Resour. Manage
, vol.22
, Issue.6
, pp. 719-736
-
-
Jun, H.1
Loganathan, G.V.2
Kim, J.H.3
Park, S.4
-
36
-
-
0032657522
-
Using limited data to assess future needs
-
Kleiner, Y. & Rajani, B. 1999 Using limited data to assess future needs. J. Am. Water Works Assoc. 91(7), 47-61.
-
(1999)
J. Am. Water Works Assoc
, vol.91
, Issue.7
, pp. 47-61
-
-
Kleiner, Y.1
Rajani, B.2
-
37
-
-
0342771593
-
Considering time dependent factors in the statistical prediction of water main breaks
-
Baltimore, Maryland
-
Kleiner, Y. & Rajani, B. 2000 Considering time dependent factors in the statistical prediction of water main breaks,AWWA Infrastructure Conference Proceedings, Baltimore, Maryland, pp. 134-141.
-
(2000)
AWWA Infrastructure Conference Proceedings
, pp. 134-141
-
-
Kleiner, Y.1
Rajani, B.2
-
38
-
-
0035166549
-
Comprehensive review of structural deterioration of water mains: Statistical models
-
Kleiner, Y. & Rajani, B. 2001 Comprehensive review of structural deterioration of water mains: statistical models. Urban Water J. 3, 131-150.
-
(2001)
Urban Water J
, vol.3
, pp. 131-150
-
-
Kleiner, Y.1
Rajani, B.2
-
39
-
-
0036921341
-
Forecasting variations and trends in water-main breaks
-
Kleiner, Y. & Rajani, B. 2002 Forecasting variations and trends in water-main breaks. J. Infrastructure Syst. ASCE 8(4), 122-131.
-
(2002)
J. Infrastructure Syst. ASCE
, vol.8
, Issue.4
, pp. 122-131
-
-
Kleiner, Y.1
Rajani, B.2
-
40
-
-
33847228024
-
Quantifying effectiveness of cathodic protection in water mains: Case studies
-
Kleiner, Y. & Rajani, B. 2007 Quantifying effectiveness of cathodic protection in water mains: case studies. J. Infrastructure Syst. 13(1), 1-11.
-
(2007)
J. Infrastructure Syst
, vol.13
, Issue.1
, pp. 1-11
-
-
Kleiner, Y.1
Rajani, B.2
-
41
-
-
84859916849
-
I-WARP: Individual water main renewal planner
-
Sheffield, UK, 1-3 September 2009
-
Kleiner, Y. & Rajani, B. B. 2009 I-WARP: individual water main renewal planner, 10th International Conference on Computing and Control for the Water Industry: CCWI2009 Conference, Sheffield, UK, 1-3 September 2009.
-
(2009)
10th International Conference on Computing and Control for the Water Industry: CCWI2009 Conference
-
-
Kleiner, Y.1
Rajani, B.B.2
-
42
-
-
0031845475
-
Selection and scheduling of rehabilitation alternatives for water distribution systems
-
Kleiner, Y., Adams, B. J. & Rogers, J. S. 1998 Selection and scheduling of rehabilitation alternatives for water distribution systems. Water Resour. Res. 34(8), 2053-2061.
-
(1998)
Water Resour. Res
, vol.34
, Issue.8
, pp. 2053-2061
-
-
Kleiner, Y.1
Adams, B.J.2
Rogers, J.S.3
-
43
-
-
77956894134
-
Management of failure risk in large-diameter buried pipes using fuzzy-based techniques
-
Porto, Portugal, 28-30 October 2004
-
Kleiner, Y., Rajani, B. B. & Sadiq, R. 2004 Management of failure risk in large-diameter buried pipes using fuzzy-based techniques, 4th International Conference on Decision Making in Urban and Civil Engineering, Porto, Portugal, 28-30 October 2004, pp. 1-11.
-
(2004)
4th International Conference on Decision Making in Urban and Civil Engineering
, pp. 1-11
-
-
Kleiner, Y.1
Rajani, B.B.2
Sadiq, R.3
-
44
-
-
33846346738
-
-
AWWARF, Denver, Colorado
-
Kleiner, Y., Rajani, B. & Sadiq, R. 2005 Risk Management of Large Diameter Water Transmission Mains. AWWARF, Denver, Colorado.
-
(2005)
Risk Management of Large Diameter Water Transmission Mains
-
-
Kleiner, Y.1
Rajani, B.2
Sadiq, R.3
-
45
-
-
33645232491
-
Modelling the deterioration of buried infrastructure as a fuzzy Markov process
-
Kleiner, Y., Sadiq, R. & Rajani, B. 2006 Modelling the deterioration of buried infrastructure as a fuzzy Markov process. J. Water Supply Res. Technol.-AQUA 55(2), 67-80.
-
(2006)
J. Water Supply Res. Technol.-AQUA
, vol.55
, Issue.2
, pp. 67-80
-
-
Kleiner, Y.1
Sadiq, R.2
Rajani, B.3
-
46
-
-
84943406615
-
Consideration of static and dynamic effects to plan water main renewal
-
Manama, Bahrain
-
Kleiner, Y., Rajani, B. & Wang, S. 2007 Consideration of static and dynamic effects to plan water main renewal, Middle East Water 2007, 4th International Exhibition and Conference for Water Technology, Manama, Bahrain.
-
(2007)
Middle East Water 2007, 4th International Exhibition and Conference for Water Technology
-
-
Kleiner, Y.1
Rajani, B.2
Wang, S.3
-
47
-
-
33744506093
-
Innovative method for assessment of underground sewer pipe condition
-
Koo, D.-H. & Ariaratnam, S. T. 2006 Innovative method for assessment of underground sewer pipe condition. Autom. Constr. 15, 479-488.
-
(2006)
Autom. Constr.
, vol.15
, pp. 479-488
-
-
Koo, D.-H.1
Ariaratnam, S.T.2
-
48
-
-
85096886787
-
-
Gas Research Institute, PB87-114112, Chicago, Illinois
-
Kulkarni, R. B., Golabi, K. & Chuang, J. 1986 Analytical Techniques for Selection of Repair-or-Replace Options for Cast Iron Gas Piping Systems-Phase I, Gas Research Institute, PB87-114112, Chicago, Illinois.
-
(1986)
Analytical Techniques for Selection of Repair-or-Replace Options for Cast Iron Gas Piping Systems-Phase I
-
-
Kulkarni, R.B.1
Golabi, K.2
Chuang, J.3
-
49
-
-
41149175459
-
Modelling the deterioration process of drainage pipelines
-
Le Gat, Y. 2008 Modelling the deterioration process of drainage pipelines. Urban Water J. 5(2), 97-106.
-
(2008)
Urban Water J
, vol.5
, Issue.2
, pp. 97-106
-
-
Le Gat, Y.1
-
50
-
-
0036642338
-
Threshold break rate for pipeline replacement in water distribution systems
-
Loganathan, G. V., Park, S. & Sherali, H. D. 2002 Threshold break rate for pipeline replacement in water distribution systems. J. Water Res. Plan. ASCE 128(4), 271-279.
-
(2002)
J. Water Res. Plan. ASCE
, vol.128
, Issue.4
, pp. 271-279
-
-
Loganathan, G.V.1
Park, S.2
Sherali, H.D.3
-
51
-
-
0029308515
-
Poisson regression models of infrastructure transition probabilities
-
Madanat, S. & Ibrahim, W. H. W. 1995 Poisson regression models of infrastructure transition probabilities. J. Transp. Eng. ASCE 121(3), 267-272.
-
(1995)
J. Transp. Eng. ASCE
, vol.121
, Issue.3
, pp. 267-272
-
-
Madanat, S.1
Ibrahim, W.H.W.2
-
52
-
-
56149099890
-
Monitoring of the state of pipes in sewage networks as an element of adapting such networks to the technical demands of modern, urban subterranean infrastructure
-
Madryas, C. & Przbyla, B. 2007 Monitoring of the state of pipes in sewage networks as an element of adapting such networks to the technical demands of modern, urban subterranean infrastructure. Proceedings of the 33rd ITA-AITES World Tunnel Congress-Underground Space-The 4th Dimension of Metropolises, Vol.1. pp. 577-582.
-
(2007)
Proceedings of the 33rd ITA-AITES World Tunnel Congress-Underground Space-The 4th Dimension of Metropolises
, vol.1
, pp. 577-582
-
-
Madryas, C.1
Przbyla, B.2
-
53
-
-
0035108726
-
Neural network based modelling of environmental variables: A systematic approach
-
Maier, H. R. & Dandy, G. C. 2001 Neural network based modelling of environmental variables: a systematic approach. Math. Comput. Modell. 33(6), 669-682.
-
(2001)
Math. Comput. Modell.
, vol.33
, Issue.6
, pp. 669-682
-
-
Maier, H.R.1
Dandy, G.C.2
-
54
-
-
77956913858
-
Capturing externalities for optimum whole of life costing
-
Sydney, March 2007
-
Marlow, D. & Burn, S. 2007 Capturing externalities for optimum whole of life costing, IQPC Conference-Whole of Life Costing, Sydney, March 2007.
-
(2007)
IQPC Conference-Whole of Life Costing
-
-
Marlow, D.1
Burn, S.2
-
55
-
-
39149095933
-
Effective use of condition assessment within asset management
-
Marlow,D. & Burn, S. 2008 Effective use of condition assessment within asset management. J. Am.Water Works Assoc. 100(1), 54-63.
-
(2008)
J. Am.Water Works Assoc
, vol.100
, Issue.1
, pp. 54-63
-
-
Marlow, D.1
Burn, S.2
-
56
-
-
77956892996
-
PARMS-PRIORITY: An advanced asset management software tool for water distribution networks
-
Reno, Nevada, 2-3 March 2006
-
Marlow, D., Moglia, M. & Burn, S. 2006 PARMS-PRIORITY: An advanced asset management software tool for water distribution networks, AWWA Symposium, Reno, Nevada, 2-3 March 2006.
-
(2006)
AWWA Symposium
-
-
Marlow, D.1
Moglia, M.2
Burn, S.3
-
57
-
-
77956914673
-
-
WERF, Alexandria, Virginia
-
Marlow, D., Heart, S., Burn, S., Urqhart, A., Gould, S., Anderson, M., Cook, S., Ambrose, M., Madin, B. & Fitzgerald, A. 2007a Condition Assessment Strategies and Protocols for Water & Wastewater Utility Assets. WERF, Alexandria, Virginia.
-
(2007)
Condition Assessment Strategies and Protocols for Water & Wastewater Utility Assets
-
-
Marlow, D.1
Heart, S.2
Burn, S.3
Urqhart, A.4
Gould, S.5
Anderson, M.6
Cook, S.7
Ambrose, M.8
Madin, B.9
Fitzgerald, A.10
-
58
-
-
69249126158
-
Asset management for urban infrastructure
-
Marlow, D., Moglia, M. & Buckland, P. 2007b Asset management for urban infrastructure. Water Asset Manage. Int. 3(2), 12-18.
-
(2007)
Water Asset Manage. Int
, vol.3
, Issue.2
, pp. 12-18
-
-
Marlow, D.1
Moglia, M.2
Buckland, P.3
-
59
-
-
77956923091
-
-
WERF, Alexandria, Virginia
-
Marlow, D., Davis, P., Tran, D., Urqhart, A. & Burn, S. 2010 A State of the Art Review: Asset Remaining Life. WERF, Alexandria, Virginia.
-
(2010)
A State of the Art Review: Asset Remaining Life
-
-
Marlow, D.1
Davis, P.2
Tran, D.3
Urqhart, A.4
Burn, S.5
-
60
-
-
33744823429
-
Condition assessment and rehabilitation of large sewers
-
University of Waterloo, Waterloo, Ontario, 10-13 June 2001
-
McDonald, S. E. & Zhao, J. Q. 2001 Condition assessment and rehabilitation of large sewers, International Conference on Underground Infrastructure Research, University of Waterloo, Waterloo, Ontario, 10-13 June 2001, pp. 361-369.
-
(2001)
International Conference on Underground Infrastructure Research
, pp. 361-369
-
-
McDonald, S.E.1
Zhao, J.Q.2
-
61
-
-
0036609782
-
Markov model for storm water pipe deterioration
-
Micevski, T., Kuczera, G. & Coombes, P. 2002 Markov model for storm water pipe deterioration. J. Infrastructure Syst. ASCE 8(2), 49-56.
-
(2002)
J. Infrastructure Syst. ASCE
, vol.8
, Issue.2
, pp. 49-56
-
-
Micevski, T.1
Kuczera, G.2
Coombes, P.3
-
62
-
-
33646583524
-
A decision support system for reducing the predicted consequences of water reticulation pipe failures
-
Special issue decision support systems for infrastructure management
-
Moglia, M., Burn, S. & Meddings, S. 2006 A decision support system for reducing the predicted consequences of water reticulation pipe failures. J. Inf. Technol. Constr. (ITcon) 11, 237-256. (Special issue decision support systems for infrastructure management), (http://www.itcon.org/2006/18).
-
(2006)
J. Inf. Technol. Constr. (ITcon)
, pp. 237-256
-
-
Moglia, M.1
Burn, S.2
Meddings, S.3
-
63
-
-
39749153072
-
Strong exploration of a cast iron pipe failure model
-
Moglia, M., Davis, P. & Burn, S. 2008 Strong exploration of a cast iron pipe failure model. Reliab. Eng. Syst. Saf. 93, 885-896.
-
(2008)
Reliab. Eng. Syst. Saf
, vol.93
, pp. 885-896
-
-
Moglia, M.1
Davis, P.2
Burn, S.3
-
64
-
-
0036717772
-
Modeling bridge deterioration using case-based reasoning
-
Morcous, G., Rivard, H. & Hanna, A. M. 2002 Modeling bridge deterioration using case-based reasoning. J. Infrastructure Syst. ASCE 8(3), 86-95.
-
(2002)
J. Infrastructure Syst. ASCE
, vol.8
, Issue.3
, pp. 86-95
-
-
Morcous, G.1
Rivard, H.2
Hanna, A.M.3
-
65
-
-
77956931457
-
Selection of technologies for sewer rehabilitation and replacement
-
NGSMI, 1.0, March 2003
-
NGSMI 2003 Selection of technologies for sewer rehabilitation and replacement, National Guide to Sustainable Municipal Infrastructure, 1.0, March 2003.
-
(2003)
National Guide to Sustainable Municipal Infrastructure
-
-
-
67
-
-
0031104542
-
Probabilistic fracture analysis of cracked pipes with circumferential flaws
-
Rahman, S. 1997 Probabilistic fracture analysis of cracked pipes with circumferential flaws. Int. J. Press. Vessels Piping 70, 223-236.
-
(1997)
Int. J. Press. Vessels Piping
, vol.70
, pp. 223-236
-
-
Rahman, S.1
-
68
-
-
57249106515
-
A methodology to estimate remaining service life of grey cast iron water mains
-
Rajani, B. & Makar, J. 2000 A methodology to estimate remaining service life of grey cast iron water mains. Can. J. Civ. Eng. 27, 1259-1272.
-
(2000)
Can. J. Civ. Eng.
, vol.27
, pp. 1259-1272
-
-
Rajani, B.1
Makar, J.2
-
69
-
-
0035170558
-
Comprehensive review of structural deterioration of water mains: Physically based models
-
Rajani, B. & Kleiner, Y. 2001a Comprehensive review of structural deterioration of water mains: physically based models. Urban Water 3(3), 151-164.
-
(2001)
Urban Water
, vol.3
, Issue.3
, pp. 151-164
-
-
Rajani, B.1
Kleiner, Y.2
-
70
-
-
0242697344
-
WARP -Water mains renewal planner
-
Kitchener, Canada, 11-13 June 2001
-
Rajani, B. & Kleiner, Y. 2001b WARP -Water mains renewal planner. International Conference on Underground Infrastructure Research, Kitchener, Canada, 11-13 June 2001, pp. 371-375.
-
(2001)
International Conference on Underground Infrastructure Research
, pp. 371-375
-
-
Rajani, B.1
Kleiner, Y.2
-
71
-
-
15544371998
-
Uncoupled axial, flexural, and circumferential pipe-soil interaction analyses of partially supported jointed water mains
-
Rajani, B. & Tesfamariam, S. 2004 Uncoupled axial, flexural, and circumferential pipe-soil interaction analyses of partially supported jointed water mains. Can. Geotechnical. J. 41, 997-1010.
-
(2004)
Can. Geotechnical. J
, vol.41
, pp. 997-1010
-
-
Rajani, B.1
Tesfamariam, S.2
-
72
-
-
33645233852
-
Translation of pipe inspection results into condition ratings using the fuzzy synthetic evaluation technique
-
Rajani, B., Kleiner, Y. & Sadiq, R. 2006 Translation of pipe inspection results into condition ratings using the fuzzy synthetic evaluation technique. J. Water Supply Res. Technol.-AQUA 55, 11-24.
-
(2006)
J. Water Supply Res. Technol.-AQUA
, vol.55
, pp. 11-24
-
-
Rajani, B.1
Kleiner, Y.2
Sadiq, R.3
-
73
-
-
4243789987
-
-
WRc, Swindon, UK
-
Randall-Smith, M., Russell, A. & Oliphant, R. 1992 Guidance Manual for the Structural Condition Assessment of Trunk Mains. WRc, Swindon, UK.
-
(1992)
Guidance Manual for the Structural Condition Assessment of Trunk Mains
-
-
Randall-Smith, M.1
Russell, A.2
Oliphant, R.3
-
74
-
-
69249089783
-
Failure assessment modeling to prioritize water pipe renewal: Two case studies
-
Rogers, P. D. & Grigg, N. S. 2009 Failure assessment modeling to prioritize water pipe renewal: two case studies. J. Infrastructure Syst. 15(3), 162-171.
-
(2009)
J. Infrastructure Syst
, vol.15
, Issue.3
, pp. 162-171
-
-
Rogers, P.D.1
Grigg, N.S.2
-
75
-
-
2942610868
-
Probabilistic risk analysis of corrosion associated failures in cast iron water mains
-
Sadiq, R., Rajani, B. & Kleiner, Y. 2004 Probabilistic risk analysis of corrosion associated failures in cast iron water mains. Reliab. Eng. Syst. Saf. 86, 1-10.
-
(2004)
Reliab. Eng. Syst. Saf
, vol.86
, pp. 1-10
-
-
Sadiq, R.1
Rajani, B.2
Kleiner, Y.3
-
78
-
-
77956937659
-
The use of data-driven methodologies for prediction of water and wastewater asset failures
-
Ohrid, Macedonia, 22-25 October 2008
-
Savic, D. A. 2009 The use of data-driven methodologies for prediction of water and wastewater asset failures. NATO Advanced Research Workshop on Risk Management of Water Supply and Sanitation Systems Impaired by Operational Failures, Natural Disasters and War Conflicts, Ohrid, Macedonia, 22-25 October 2008, pp. 181-190.
-
(2009)
NATO Advanced Research Workshop on Risk Management of Water Supply and Sanitation Systems Impaired by Operational Failures, Natural Disasters and War Conflicts
, pp. 181-190
-
-
Savic, D.A.1
-
79
-
-
0018318075
-
An analytic approach to scheduling pipe replacement
-
Shamir, U. & Howard, D. 1979 An analytic approach to scheduling pipe replacement. J. Am. Water Works Assoc. 71, 248-258.
-
(1979)
J. Am. Water Works Assoc
, Issue.71
, pp. 248-258
-
-
Shamir, U.1
Howard, D.2
-
83
-
-
33846364025
-
Possibilistic approach for consideration of uncertainties to estimate structural capacity of ageing cast iron water mains
-
Tesfamariam, S., Rajani, B. & Sadiq, R. 2006 Possibilistic approach for consideration of uncertainties to estimate structural capacity of ageing cast iron water mains. Can. J. Civ. Eng. 33, 1050-1064.
-
(2006)
Can. J. Civ. Eng
, vol.33
, pp. 1050-1064
-
-
Tesfamariam, S.1
Rajani, B.2
Sadiq, R.3
-
84
-
-
42649104790
-
Prediction models for serviceability deterioration of stormwater pipes
-
Tran, D. H., Anne, W. M., Ng, A. W. M., Mcmanus, K. J. & Burn, S. 2006a Prediction models for serviceability deterioration of stormwater pipes. J. Struct. Infrastructure Eng. 4(4), 287-295.
-
(2006)
J. Struct. Infrastructure Eng
, vol.4
, Issue.4
, pp. 287-295
-
-
Tran, D.H.1
Anne, W.M.2
Ng, A.W.M.3
Mcmanus, K.J.4
Burn, S.5
-
85
-
-
33750989343
-
Application of probabalistic neural networks in modelling structural deterioration of stormwater pipes
-
Tran, D. H., Ng, A. W. M., McManus, K. J., Burn, S. & Davis, P. 2006b Application of probabalistic neural networks in modelling structural deterioration of stormwater pipes. Urban Water 3(3), 175-184.
-
(2006)
Urban Water
, vol.3
, Issue.3
, pp. 175-184
-
-
Tran, D.H.1
Ng, A.W.M.2
McManus, K.J.3
Burn, S.4
Davis, P.5
-
86
-
-
0141998336
-
-
US EPA, United States, Office of Water (4606M),EPA-816-R-02-020, Washington, DC
-
US EPA 2002a The Clean Water and Drinking Water Infrastructure Gap Analysis, United States, Office of Water (4606M), EPA-816-R-02-020, Washington, DC.
-
(2002)
The Clean Water and Drinking Water Infrastructure Gap Analysis
-
-
-
87
-
-
84861283452
-
-
US EPA, Office of Wastewater Management, 833-F-02-1001, April 2002, Washington, DC
-
US EPA 2002b SSO Fact Sheet: Asset Management for Sewer Collection Systems, Office of Wastewater Management, 833-F-02-1001, April 2002, Washington, DC.
-
(2002)
SSO Fact Sheet: Asset Management for Sewer Collection Systems
-
-
-
88
-
-
77956934333
-
Addressing waterrelated externalities: Issues for consideration, paper presented
-
at a, by the Australian Agricultural and Resource Economics Society, Melbourne, 10 February 2004
-
Van Bueren, M. & MacDonald, D. H. 2004 Addressing waterrelated externalities: Issues for consideration, paper presented at a Water Policy Workshop convened by the Australian Agricultural and Resource Economics Society, Melbourne, 10 February 2004.
-
(2004)
Water Policy Workshop convened
-
-
Van Bueren, M.1
MacDonald, D.H.2
-
89
-
-
0242597024
-
Reliability modeling and asset management for distribution systems
-
Veevers, A. & Hussain, A. Z. M. O. 1999 Reliability modeling and asset management for distribution systems. Int. J. Reliab. Qual. Saf. Eng. 6(3), 217-228.
-
(1999)
Int. J. Reliab. Qual. Saf. Eng
, vol.6
, Issue.3
, pp. 217-228
-
-
Veevers, A.1
Hussain, A.Z.M.O.2
-
90
-
-
0020098396
-
Economic analysis of water main breaks
-
Walski, T. M. & Pelliccia, A. 1982 Economic analysis of water main breaks. J. Am. Water Works Assoc. 74(3), 140-147.
-
(1982)
J. Am. Water Works Assoc
, vol.74
, Issue.3
, pp. 140-147
-
-
Walski, T.M.1
Pelliccia, A.2
-
91
-
-
77956931197
-
Maintenance of water distribution systems
-
University of Canterbury New Zealand, 30 November-1 December 2001
-
Watson, T., Christian, C., Mason, A. & Smith, M. 2001 Maintenance of water distribution systems, Proceedings of the 36th Annual Conference of the Operational Research Society of New Zealand, University of Canterbury, New Zealand, 30 November-1 December 2001, pp. 57-66.
-
(2001)
Proceedings of the 36th Annual Conference of the Operational Research Society of New Zealand
, pp. 57-66
-
-
Watson, T.1
Christian, C.2
Mason, A.3
Smith, M.4
-
92
-
-
0035367051
-
Challenging issues in modeling deterioration of combined sewers
-
Wirahadikusumah, R., Abraham, M. D. & Iseley, T. 2001 Challenging issues in modeling deterioration of combined sewers. J. Infrastructure Syst. ASCE 7(2), 77-84.
-
(2001)
J. Infrastructure Syst. ASCE
, vol.7
, Issue.2
, pp. 77-84
-
-
Wirahadikusumah, R.1
Abraham, M.D.2
Iseley, T.3
-
93
-
-
77956934044
-
-
accessed March 2008
-
Woodhouse, J. 1999 Cost risk optimisation, http://www.plant-ma intenance.com/articles/Costriskop.pdf (accessed March 2008).
-
(1999)
Cost Risk Optimisation
-
-
Woodhouse, J.1
|