메뉴 건너뛰기




Volumn 21, Issue C, 2006, Pages 1551-1556

Scheduling of make and pack plants: a case study

Author keywords

case study; make and pack plant; priority rule based solution method; scheduling

Indexed keywords


EID: 77956747888     PISSN: 15707946     EISSN: None     Source Type: Book Series    
DOI: 10.1016/S1570-7946(06)80268-3     Document Type: Article
Times cited : (8)

References (7)
  • 1
    • 0040905926 scopus 로고
    • Detailed scheduling for a class of two-stage intermittent manufacturing systems
    • Belarbi K., and Hindi K.S. Detailed scheduling for a class of two-stage intermittent manufacturing systems. Production Planning & Control 3 (1992) 36-47
    • (1992) Production Planning & Control , vol.3 , pp. 36-47
    • Belarbi, K.1    Hindi, K.S.2
  • 3
    • 0012442701 scopus 로고    scopus 로고
    • Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
    • Franck B., Neumann K., and Schwindt C. Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling. OR Spektrum 23 (2001) 297-324
    • (2001) OR Spektrum , vol.23 , pp. 297-324
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 4
    • 0037419775 scopus 로고    scopus 로고
    • Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage
    • Gupta S., and Karimi I.A. Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage. Industrial Engineering & Chemistry Research 42 (2003) 490-508
    • (2003) Industrial Engineering & Chemistry Research , vol.42 , pp. 490-508
    • Gupta, S.1    Karimi, I.A.2
  • 5
    • 0034661146 scopus 로고    scopus 로고
    • The curse of reality-why process scheduling optimization problems are difficult in practice
    • Honkomp S.J., Lombardo S., Rosen O., and Pekny J.F. The curse of reality-why process scheduling optimization problems are difficult in practice. Computers and Chemical Engineering 24 (2000) 323-328
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 323-328
    • Honkomp, S.J.1    Lombardo, S.2    Rosen, O.3    Pekny, J.F.4
  • 6
    • 0442269145 scopus 로고    scopus 로고
    • An MILP-based approach to the short-term scheduling of make-and-pack continuous production plants
    • Méndez C.A., and Cerdá J. An MILP-based approach to the short-term scheduling of make-and-pack continuous production plants. OR Spectrum 24 (2002) 403-429
    • (2002) OR Spectrum , vol.24 , pp. 403-429
    • Méndez, C.A.1    Cerdá, J.2
  • 7
    • 0029391936 scopus 로고
    • Generating daily production schedules in process industries
    • Ramudhin A., and Ratliff H.D. Generating daily production schedules in process industries. IIE Transactions 27 (1995) 646-656
    • (1995) IIE Transactions , vol.27 , pp. 646-656
    • Ramudhin, A.1    Ratliff, H.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.